Volume 23 Issue 1
Jul.  2021
Turn off MathJax
Article Contents
Wang Tao, Fang Zhongqiang, Li Hao. Discussion on Lining Structure Calculation Method of Multi-arch Tunnel With Compound Mid-board[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2009, 23(1): 19-22.
Citation: Wang Tao, Fang Zhongqiang, Li Hao. Discussion on Lining Structure Calculation Method of Multi-arch Tunnel With Compound Mid-board[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2009, 23(1): 19-22.

Discussion on Lining Structure Calculation Method of Multi-arch Tunnel With Compound Mid-board

  • Received Date: 2008-11-25
  • As the theory of calculation method of designing load is immature, and the existing calculation model could not calculate the lining structure of multi-arch tunnel exactly, so there is not a united method to calculate the lining structure. Based on the two slumping arches assumption, a load defining method of multi-arch tunnel is put forward. The interaction between mid-board and lining structure is simulated by pressure springs, and the lining structure calculation model of multi-arch tunnel with compound mid-board is established based on load-structure method. Combing the design and calculation of Fenghuang tunnel in Suzhou, the lining structure is calculated by the model, and the reinforcement ration and stress safety factor are calculated, and this could provide useful discussion on the design and calculation of multi-arch tunnel with compound mid-board.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (65) PDF downloads(12) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return