Tan Hui. The Applieation of the Maximum Posterior Estimation in Large Seale of Holing Engineering[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1997, 11(1): 60-64.
Citation: Tan Hui. The Applieation of the Maximum Posterior Estimation in Large Seale of Holing Engineering[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1997, 11(1): 60-64.

The Applieation of the Maximum Posterior Estimation in Large Seale of Holing Engineering

  • Received Date: 1996-08-22
    Available Online: 2021-07-07
  • This paper introdaces the maximum posterior estimation into adjastment and design of closest mine networks for a large scale of holing through sorvey. This adjustment method is used to the data processing of this networks more properly than the quasi-weight adjustment because the overall adjosement solution of the connected parameters and the united accuracy datam may be obtained. The results of united and partial maximam posteripr adjastment are approximately equal is tested by a practical example.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (43) PDF downloads(4) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return