Zhang Wu, Gao Wensheng. Post Grouting Technology of Tensile Pile and Its Application[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(1): 31-35.
Citation: Zhang Wu, Gao Wensheng. Post Grouting Technology of Tensile Pile and Its Application[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(1): 31-35.

Post Grouting Technology of Tensile Pile and Its Application

  • Received Date: 2007-11-05
    Available Online: 2021-07-07
  • The mechanism,method,effect and capacity mode of tensile pile with post grouting are introduced. The pile capacity of tensile pile is increased by the post grouting, and the construction difficulty is decreased, piling quantity is improved, constructional period is shorted and project expense is cut down.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (59) PDF downloads(10) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return