Ttis paper introduces the technique combined of catching and dewaterings. Adopting successfully the water-tight wall with clay to cut off the seawater permeating in the dewatering engineering near river or sea. It can satisfy the dewatering technical requirements combined with the foundation processing method, using stone column to remove the residual water pressure of pit bottom. And introduces some successful experience.