Volume 21 Issue 3
Jul.  2021
Turn off MathJax
Article Contents
Wang Qirui, Tang Jun. Overstretch Unloading Method of Pre-stressed Anchor Ropes[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2007, 21(3): 149-152.
Citation: Wang Qirui, Tang Jun. Overstretch Unloading Method of Pre-stressed Anchor Ropes[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2007, 21(3): 149-152.

Overstretch Unloading Method of Pre-stressed Anchor Ropes

  • Received Date: 2007-02-05
    Available Online: 2021-07-10
  • Combining practical engineering example, the method of unloading the anchor ropes pre-stress through overstretch is reviewed, and the influence of anchor ropes working effected by the loading-unloading-reloading function process is analyzed.Based on contrasting the results of pretighten and stretch, and monitoring the work of anchor ropes, the feasibility of the overstretch unloading method is illustrated.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (42) PDF downloads(8) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return