CHEN Lixin, SHU Bin, YANG Zongyao. Construction Method of Cast-in-place Pile Post Grouting[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2010, 24(1): 51-54. doi: 10.3969/j.issn.1007-2993.2010.01.014
Citation:
CHEN Lixin, SHU Bin, YANG Zongyao. Construction Method of Cast-in-place Pile Post Grouting[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2010, 24(1): 51-54. doi: 10.3969/j.issn.1007-2993.2010.01.014
CHEN Lixin, SHU Bin, YANG Zongyao. Construction Method of Cast-in-place Pile Post Grouting[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2010, 24(1): 51-54. doi: 10.3969/j.issn.1007-2993.2010.01.014
Citation:
CHEN Lixin, SHU Bin, YANG Zongyao. Construction Method of Cast-in-place Pile Post Grouting[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2010, 24(1): 51-54. doi: 10.3969/j.issn.1007-2993.2010.01.014
This method introduced the technology features of cast-in-place piles post grouting, principles of technology, operations and quality control measures, elaborated on the open-grouting technology with the traditional distinction between a closed grouting process, encapsulated the technology experience and results of cast-in-place pile post grouting technology applications in recent years.