WU Xuxing, CENG Pengjiu. The Technological Practice and Discussion on Integration of Drilling and Grouting[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2010, 24(5): 239-242. doi: 10.3969/j.issn.1007-2993.2010.05.006
Citation: WU Xuxing, CENG Pengjiu. The Technological Practice and Discussion on Integration of Drilling and Grouting[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2010, 24(5): 239-242. doi: 10.3969/j.issn.1007-2993.2010.05.006

The Technological Practice and Discussion on Integration of Drilling and Grouting

doi: 10.3969/j.issn.1007-2993.2010.05.006
  • Received Date: 2010-04-12
    Available Online: 2021-07-06
  • Grouting is composed by two independent processes, pore-forming and grouting. Pore-forming is composed by a suit of drilling tool and pipe while grouting composed by injection pipes. In some construction areas both drilling team and grouting team had to bring into operated. Pore-forming and grouting combined into one process can improve both quality and efficiency of grouting after process improvement. The principle of drilling and grouting integration technology and its technological process and characteristics were introduced in this paper and also the engineering practice was illustraied.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (32) PDF downloads(11) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return