Qin Xiaoguang, Yang Longcai, He Taihong. Studies on the Construction Sequence of Different Piles in High-speed Railway Yard[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2011, 25(2): 101-105. doi: 10.3969/j.issn.1007-2993.2011.02.011
Citation:
|
Qin Xiaoguang, Yang Longcai, He Taihong. Studies on the Construction Sequence of Different Piles in High-speed Railway Yard[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2011, 25(2): 101-105. doi: 10.3969/j.issn.1007-2993.2011.02.011
|
Qin Xiaoguang, Yang Longcai, He Taihong. Studies on the Construction Sequence of Different Piles in High-speed Railway Yard[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2011, 25(2): 101-105. doi: 10.3969/j.issn.1007-2993.2011.02.011
Citation:
|
Qin Xiaoguang, Yang Longcai, He Taihong. Studies on the Construction Sequence of Different Piles in High-speed Railway Yard[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2011, 25(2): 101-105. doi: 10.3969/j.issn.1007-2993.2011.02.011
|
Studies on the Construction Sequence of Different Piles in High-speed Railway Yard
-
Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Tongji University, Shanghai 201804, China
- Received Date: 2011-03-01