Different settlement and large settlement occurred On the building adjacent to the foundation pit during theexcavation process of a metro station foundation pit. The sleeve value barrel grouting construction technologise was used to reinforcing the building. Byi investigating the form of the building foundation, we choose the grouting holes and selected the grouting parameter reasonably, made a good grouting effect, and controlled the building subsidence within permitted.