As one of groundwater control measures, the lager diameter tube well dewatering is applied widely and ma turely. Because of the low criteria of construction admittance, and the little proportion in the construction cost, quality control is often ignored. It causes slope instability and bottom plate uplift frequently. It's necessary to design based on hydrological parameters from pumping test, control construction quality strictly for achieving satisfied effect.