Research of the projecting feature depending on swelling rock physical and mechanical characteristics and the engineering characteristics. The characteristics bracing engineering of deep foundation pit combined with substructure. Look for relations of decay period and safe period, the timeliness effect was put forward by their relational, For this to made economic effect design methodology. A Case Study of Nanning, which was testified further by the timeliness effect of bracing engineering of deep foundation pit on swelling rock.