Kong Lingjian. Application of Soli-lime Combining with Cement-Flyash-Gravel Pile for Tall Building Ground Treatment[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2013, 27(5): 267-271. doi: 10.3969/j.issn.1007-2993.2013.05.013
Citation:
Kong Lingjian. Application of Soli-lime Combining with Cement-Flyash-Gravel Pile for Tall Building Ground Treatment[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2013, 27(5): 267-271. doi: 10.3969/j.issn.1007-2993.2013.05.013
Kong Lingjian. Application of Soli-lime Combining with Cement-Flyash-Gravel Pile for Tall Building Ground Treatment[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2013, 27(5): 267-271. doi: 10.3969/j.issn.1007-2993.2013.05.013
Citation:
Kong Lingjian. Application of Soli-lime Combining with Cement-Flyash-Gravel Pile for Tall Building Ground Treatment[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2013, 27(5): 267-271. doi: 10.3969/j.issn.1007-2993.2013.05.013
Introduced soli-lime combining with cement-cement-flyash-gravel pile for tall building's ground treatment.The ground treatment design, construction, deformation calculation,inspection,deformation monitoring results show that the ground treatment design can meet the requirements of the tall building.The analysis results provide a reference for other similar projects.