Taken a foundation pit project in Shanghai as an example, the bored cast-in-place pile and SMW with steel bracing were used based on analysis of the characteristics of the foundation pit. The bracing method was calculated and analyzed. Problems in the construction process that should be paid attention to were mentioned. It provides some suggestions for same type of similar foundation pit projects.