Volume 30 Issue 6
Jul.  2021
Turn off MathJax
Article Contents
Shi Zhongming. Study on Application of the Post Grouting Bored Pile in the Gravel Layer[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2016, 30(6): 310-312. doi: 10.3969/j.issn.1007-2993.2016.06.011
Citation: Shi Zhongming. Study on Application of the Post Grouting Bored Pile in the Gravel Layer[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2016, 30(6): 310-312. doi: 10.3969/j.issn.1007-2993.2016.06.011

Study on Application of the Post Grouting Bored Pile in the Gravel Layer

doi: 10.3969/j.issn.1007-2993.2016.06.011
  • Received Date: 2016-06-02
  • Bored pile construction will produce disturbance to the soil layeres which will reduce the pile side friction power and end friction power. Post grouting technology is used to improve the bearing capacity of pile and reduce settlement. According to an engineering example, the post grouting technology is indicated to be effective to improve the bearing capacity of a pile and reduce the cost. But understanding about the construction technology of the post grouting is needed to ensure the good results.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (45) PDF downloads(9) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return