Volume 33 Issue 5
Jul.  2021
Turn off MathJax
Article Contents
Tang Ge. Optimization of Construction Scheme for Loess Tunnel with Super Section[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2019, 33(5): 307-311. doi: 10.3969/j.issn.1007-2993.2019.05.013
Citation: Tang Ge. Optimization of Construction Scheme for Loess Tunnel with Super Section[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2019, 33(5): 307-311. doi: 10.3969/j.issn.1007-2993.2019.05.013

Optimization of Construction Scheme for Loess Tunnel with Super Section

doi: 10.3969/j.issn.1007-2993.2019.05.013
  • Received Date: 2019-04-08
    Available Online: 2021-07-06
  • Through the research of the Fu Jiayao 1# tunnel for Zhonghe to Shuifu section of the Lanzhou-Qinwangchuan Expressway,the optimization of construction scheme for loess tunnel with super section was proposed from the aspects of technical economy,monitoring measurement,numerical simulation,etc.Mathematical analysis was proceeded based on the data from on-site monitoring measurement of tunnel vault subsidence and peripheral displacement convergence.The force and deformation of the tunnel surrounding rock and the support in the excavation process was summarized.Meanwhile,the threedimensional model of tunnel excavation process was simulated by using finite element software MIDAS/GTS.Comparing the calculated data with the on-site monitoring data,the tunnel is demonstrated to be stability,which shows that the construction schemeis optimized and reasonable.This method is of reference significance for the construction of the same type tunnels currently.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (36) PDF downloads(6) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return