Zhuang Xuzhe, Yuan Congcong, He Xiaohui, Zeng Chen, Shi Yufeng, Ding Haibin, Meng Fanshi. Analysis of Force and Deformation of a Double-row Steel Pipe Pile Cofferdam in a Foundation Pit in a Lake[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2024, 38(1): 1-6. doi: 10.3969/j.issn.1007-2993.2024.01.001
Citation: Zhuang Xuzhe, Yuan Congcong, He Xiaohui, Zeng Chen, Shi Yufeng, Ding Haibin, Meng Fanshi. Analysis of Force and Deformation of a Double-row Steel Pipe Pile Cofferdam in a Foundation Pit in a Lake[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2024, 38(1): 1-6. doi: 10.3969/j.issn.1007-2993.2024.01.001

Analysis of Force and Deformation of a Double-row Steel Pipe Pile Cofferdam in a Foundation Pit in a Lake

doi: 10.3969/j.issn.1007-2993.2024.01.001
  • Received Date: 2022-06-18
  • Accepted Date: 2023-05-06
  • Rev Recd Date: 2023-03-27
  • Available Online: 2024-02-05
  • Publish Date: 2024-02-05
  • Cofferdams need to be used to ensure the dry construction site for foundation pit located in water areas. However, the study on cofferdams deformation is still not perfect. Based on the research background of Aixihu Tunnel project in Nanchang, Midas GTS NX finite element software was used to study the influence of cofferdam width and tie bar position on the deformation law of double-row steel pipe pile cofferdam. The model is proved to be correct by comparing the simulation results with the actual measurements. The results show that the cofferdam width has an appropriate range, too small and too large will cause the cofferdam deformation is too large. In this project, the reasonable width of cofferdam should be 3.5~4.5 m. The change of cofferdam width has little influence on the excavation deformation of cofferdam foundation. Considering the deformation of both sides of the steel pipe pile, the deformation of the tie rod is small when it is set at 0.8 m on the top of the cofferdam.

     

  • loading
  • [1]
    许明博. 水中双排钢管桩夹心土围堰施工技术[J]. 建筑工程技术与设计,2019,(1):1209.
    [2]
    吴留伟,郑国兵,吴 蕾,等. 双排钢板桩围堰在超深厚软土地基中的应用[J]. 水运工程,2018,(3):143-148. doi: 10.3969/j.issn.1002-4972.2018.03.024
    [3]
    许 亮. 深厚淤泥层地质条件下双排钢板桩围堰有限元分析[J]. 水利规划与设计,2019,(12):131-134.
    [4]
    江 杰,顾倩燕,胡 何,等. 双排钢板桩围堰的冗余度分析[J]. 岩土力学,2015,(S1):518-522. doi: 10.16285/j.rsm.2015.S1.090
    [5]
    杨 熠. 双排钢板桩围堰结构受力变形及稳定性分析[D]. 南昌: 南昌大学, 2020.
    [6]
    黄 建. 钢板桩围堰体系静、动受力变形特性数值分析[D]. 大连: 大连理工大学, 2008.
    [7]
    HWANG W K,KIM H E,CHOI H,et al. Proper regulation of the cutoff system in offshore landfill built on clay ground with double walls[J]. Journal of the Korean Geotechnical Society,2019,35(8):5-15.
    [8]
    付 猛,于 洋,丁德亮,等. 东湖通道工程钢板桩围堰抽水过程数值模拟分析[J]. 施工技术,2014,43(S2):197-200.
    [9]
    ZHAO T C, DING W Q, WEI L X, et al. The behavior analysis of a cofferdam constructed by double sheet pile wall above muck [C]// Geoshanghai International Conference Springer, Singapore, 2018.
    [10]
    GUI M W,HAN K K. An investigation on a failed double-wall cofferdam during construction[J]. Engineering Failure Analysis,2009,16(1):421-432. doi: 10.1016/j.engfailanal.2008.06.004
    [11]
    MOHAMMOD R A K,JIRO T,HIROKI F,et al. Behavior of double sheet pile wall cofferdam on sand observed in centrifuge tests[J]. International Journal of Physical Modelling in Geotechnics,2001,1(4):1-16. doi: 10.1680/ijpmg.2001.010401
    [12]
    陈香月,徐光黎,田华通,等. 砂卵石地层中单、双排钢板桩围堰现场水平载荷试验研究[J]. 水文地质工程地质,2017,44(1):91-96, 103. doi: 10.16030/j.cnki.issn.1000-3665.2017.01.14
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(9)  / Tables(2)

    Article Metrics

    Article views (173) PDF downloads(51) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return