留言板

尊敬的读者、作者、审稿人, 关于本刊的投稿、审稿、编辑和出版的任何问题, 您可以本页添加留言。我们将尽快给您答复。谢谢您的支持!

姓名
邮箱
手机号码
标题
留言内容
验证码

基于GIS+BIM+数字孪生技术的海域勘察数字管理平台研发及应用

王晓伟 王章 徐四一

王晓伟, 王章, 徐四一. 基于GIS+BIM+数字孪生技术的海域勘察数字管理平台研发及应用[J]. 岩土工程技术, 2025, 39(2): 159-166. doi: 10.20265/j.cnki.issn.1007-2993.2024-0243
引用本文: 王晓伟, 王章, 徐四一. 基于GIS+BIM+数字孪生技术的海域勘察数字管理平台研发及应用[J]. 岩土工程技术, 2025, 39(2): 159-166. doi: 10.20265/j.cnki.issn.1007-2993.2024-0243
Wang Xiaowei, Wang Zhang, Xu Siyi. Digital management platform for marine survey based on GIS+BIM+digital twin technology[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2025, 39(2): 159-166. doi: 10.20265/j.cnki.issn.1007-2993.2024-0243
Citation: Wang Xiaowei, Wang Zhang, Xu Siyi. Digital management platform for marine survey based on GIS+BIM+digital twin technology[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2025, 39(2): 159-166. doi: 10.20265/j.cnki.issn.1007-2993.2024-0243

基于GIS+BIM+数字孪生技术的海域勘察数字管理平台研发及应用

doi: 10.20265/j.cnki.issn.1007-2993.2024-0243
详细信息
    作者简介:

    王晓伟,男,1982年生,硕士,高级工程师,主要从事岩土工程技术及信息化研究。E-mail:375872805@qq.com

  • 中图分类号: P642; TU195

Digital management platform for marine survey based on GIS+BIM+digital twin technology

  • 摘要: 针对海上工程范围广、风险高、调度难、信息杂、理解难的问题,利用GIS(地理信息系统)、BIM(建筑信息模型)、数字孪生、IoT(物联网)等技术,研究以信息技术赋能勘察管理,开发海域勘测数字管理平台,优化管理模式,提高勘察作业管理及成果应用的效率,实现数字化成果交付,并在长江口区域取得了较好的应用效果。

     

  • 图  1  技术路线图

    图  2  技术架构

    图  3  模型可视化优化思路

    图  4  海陆一体化建模成果

    图  5  “四预”应用场景

    图  6  作业船舶分布

    图  7  船舶信息及调度

    图  8  气象和台风预报信息

    图  9  海上勘测指挥舱

    图  10  三维地质成果示意图

    图  11  作业船舶分布

    图  12  移交数字化成果图

  • [1] 中华人民共和国国务院. 《中华人民共和国国民经济和社会发展第十四个五年规划和2035年远景目标纲要》 [EB/OL]. (2021-03-13) [2024-06-03]. https://www.gov.cn/xinwen/2021-03/13/content_5592681.htm. (State Council of the People's Republic of China. Outline of the 14th Five-Year Plan for National Economic and Social Development of the People's Republic of China and the Vision Goals to 2035 [EB/OL]. (2021-03-13) [2024-06-03]. https://www.gov.cn/xinwen/2021-03/13/content_5592681.htm. (in Chinese)

    State Council of the People's Republic of China. Outline of the 14th Five-Year Plan for National Economic and Social Development of the People's Republic of China and the Vision Goals to 2035 [EB/OL]. (2021-03-13) [2024-06-03]. https://www.gov.cn/xinwen/2021-03/13/content_5592681.htm. (in Chinese)
    [2] 中华人民共和国住房和城乡建设部. 《“十四五”工程勘察设计行业发展规划》[EB/OL]. (2022-05-09) [2024-06-03]. https://www.mohurd.gov.cn/gongkai/zc/wjk/art/2022/art_17339_766072.html. (Ministry of Housing and Urban-Rural Development of the People's Republic of China. Development Plan for the Engineering Survey and Design Industry during the 14th Five Year Plan Period [EB/OL]. (2022-05-09) [2024-06-03]. https://www.mohurd.gov.cn/gongkai/zc/wjk/art/2022/art_17339_766072.html. (in Chinese)

    Ministry of Housing and Urban-Rural Development of the People's Republic of China. Development Plan for the Engineering Survey and Design Industry during the 14th Five Year Plan Period [EB/OL]. (2022-05-09) [2024-06-03]. https://www.mohurd.gov.cn/gongkai/zc/wjk/art/2022/art_17339_766072.html. (in Chinese)
    [3] 曹珊. 抢抓“十四五”战略机遇期 推进勘察设计行业“五化”建设[J]. 中国勘察设计, 2022(6): 19-22. (CAO S. Seize the strategic opportunity period of "14th Five-Year Plan" to promote the construction of "Five modernization" in survey and design industry[J]. China Engineering Consulting, 2022(6): 19-22. (in Chinese)

    CAO S. Seize the strategic opportunity period of "14th Five-Year Plan" to promote the construction of "Five modernization" in survey and design industry[J]. China Engineering Consulting, 2022(6): 19-22. (in Chinese)
    [4] 望 毅, 陈青红, 刘 松. 水运工程勘察设计企业BIM技术体系探索[J]. 水运工程,2018(8):109-112. (WANG Y, CHEN Q H, LIU S. Exploration on BIM technology system for port & waterway engineering survey and design companies[J]. Port & Waterway Engineering,2018(8):109-112. (in Chinese) doi: 10.3969/j.issn.1002-4972.2018.08.022

    WANG Y, CHEN Q H, LIU S. Exploration on BIM technology system for port & waterway engineering survey and design companies[J]. Port & Waterway Engineering, 2018(8): 109-112. (in Chinese) doi: 10.3969/j.issn.1002-4972.2018.08.022
    [5] 任 彧, 戴一鸣. 基于BIM的工程勘察软件系统研究与应用[J]. 工程勘察,2017,45(3):29-34. (REN Y, DAI Y M. Research and application of geotechnical investigation software based on BIM[J]. Geotechnical Investigation & Surveying,2017,45(3):29-34. (in Chinese)

    REN Y, DAI Y M. Research and application of geotechnical investigation software based on BIM[J]. Geotechnical Investigation & Surveying, 2017, 45(3): 29-34. (in Chinese)
    [6] 贾鹏飞. BIM技术在我国岩土工程勘察的应用[J]. 中国建设信息化, 2022(8): 64-65. (JIA P F. Application of BIM technology in geotechnical engineering investigation in China[J]. Informatization of China Construction, 2022(8): 64-65. (in Chinese)

    JIA P F. Application of BIM technology in geotechnical engineering investigation in China[J]. Informatization of China Construction, 2022(8): 64-65. (in Chinese)
    [7] 曹思语. 铁路勘察设计中BIM技术的研究与应用[J]. 智能建筑与智慧城市,2018(9):29-30,33. (CAO S Y. Research and application of BIM technology in railway survey and design[J]. Intelligent Building & Smart City,2018(9):29-30,33. (in Chinese) doi: 10.3969/j.issn.1671-9506.2018.09.014

    CAO S Y. Research and application of BIM technology in railway survey and design[J]. Intelligent Building & Smart City, 2018(9): 29-30,33. (in Chinese) doi: 10.3969/j.issn.1671-9506.2018.09.014
    [8] 王瑛莹. BIM技术在岩土勘察成果三维可视化的应用研究[J]. 智能建筑与智慧城市,2021(11):146-147. (WANG Y Y. Research on application of BIM technology in 3D visualization of geotechnical survey results[J]. Intelligent Building & Smart City,2021(11):146-147. (in Chinese)

    WANG Y Y. Research on application of BIM technology in 3D visualization of geotechnical survey results[J]. Intelligent Building & Smart City, 2021(11): 146-147. (in Chinese)
    [9] 王国岗, 陈亚鹏, 赵文超. 基于Bentley平台的数字孪生技术在地质勘察中的应用[J]. 中国勘察设计, 2023(12): 98-100. (WANG G G, CHEN Y P, ZHAO W C. Application of digital twin technology based on Bentley platform in geological exploration[J]. China Engineering Consulting, 2023(12): 98-100. (in Chinese)

    WANG G G, CHEN Y P, ZHAO W C. Application of digital twin technology based on Bentley platform in geological exploration[J]. China Engineering Consulting, 2023(12): 98-100. (in Chinese)
    [10] 祖为国, 雷伟刚, 潘屹峰. 海洋勘察综合数据三维可视化管理系统[J]. 勘察科学技术, 2016(S1): 38-41. (ZU W G, LEI W G, PAN Y F. 3D visualization management system for integrated data of marine exploration[J]. Site Investigation Science and Technology, 2016(S1): 38-41. (in Chinese)

    ZU W G, LEI W G, PAN Y F. 3D visualization management system for integrated data of marine exploration[J]. Site Investigation Science and Technology, 2016(S1): 38-41. (in Chinese)
    [11] 熊 鑫. 基于GIS+BIM技术的工程勘察BIM管理应用系统研究[C]//2021年全国土木工程施工技术交流会论文集(下册). 北京: 《施工技术》杂志社, 2021: 275-277. (XIONG X. Research on application system of engineering investigation BIM management based on GIS+BIM technology[C]//Proceedings of 2021 National Civil Engineering Construction Technology Conference (Part II). Beijing: Construction Technology Magazine, 2021: 275-277. (in Chinese)

    XIONG X. Research on application system of engineering investigation BIM management based on GIS+BIM technology[C]//Proceedings of 2021 National Civil Engineering Construction Technology Conference (Part II). Beijing: Construction Technology Magazine, 2021: 275-277. (in Chinese)
    [12] 李安乐, 孙成科. 岩土工程勘察信息化建设的思考[J]. 中国勘察设计, 2021(7): 76-78. (LI A L, SUN C K. Thinking on information construction of geotechnical engineering investigation[J]. China Engineering Consulting, 2021(7): 76-78. (in Chinese)

    LI A L, SUN C K. Thinking on information construction of geotechnical engineering investigation[J]. China Engineering Consulting, 2021(7): 76-78. (in Chinese)
    [13] 曹旭梅, 杨 杰, 邹艳春, 等. 基于BIM+IoT的某航道工程勘察安全管控应用技术[J]. 水运工程,2022(5):164-169. (CAO X M, YANG J, ZOU Y C, et al. Application technology of safety management and control of a waterway engineering survey based on BIM and IoT[J]. Port & Waterway Engineering,2022(5):164-169. (in Chinese) doi: 10.3969/j.issn.1002-4972.2022.05.028

    CAO X M, YANG J, ZOU Y C, et al. Application technology of safety management and control of a waterway engineering survey based on BIM and IoT[J]. Port & Waterway Engineering, 2022(5): 164-169. (in Chinese) doi: 10.3969/j.issn.1002-4972.2022.05.028
    [14] 李春亮, 刘 续. 基于GIS的勘察数字化平台关键技术研究与实现[J]. 岩土工程技术,2024,38(2):127-131. (LI C L, LIU X. Implementation of key technology for survey digital platform based on GIS[J]. Geotechnical Engineering Technique,2024,38(2):127-131. (in Chinese) doi: 10.3969/j.issn.1007-2993.2024.02.001

    LI C L, LIU X. Implementation of key technology for survey digital platform based on GIS[J]. Geotechnical Engineering Technique, 2024, 38(2): 127-131. (in Chinese) doi: 10.3969/j.issn.1007-2993.2024.02.001
    [15] 陈 健, 盛 谦, 陈国良, 等. 岩土工程数字孪生技术研究进展[J]. 华中科技大学学报(自然科学版),2022,50(8):79-88. (CHEN J, SHENG Q, CHEN G L, et al. Research progress in digital twin technology for geotechnical engineering[J]. Journal of Huazhong University of Science and Technology (Natural Science Edition),2022,50(8):79-88. (in Chinese)

    CHEN J, SHENG Q, CHEN G L, et al. Research progress in digital twin technology for geotechnical engineering[J]. Journal of Huazhong University of Science and Technology (Natural Science Edition), 2022, 50(8): 79-88. (in Chinese)
  • 加载中
图(12)
计量
  • 文章访问数:  79
  • HTML全文浏览量:  14
  • PDF下载量:  15
  • 被引次数: 0
出版历程
  • 收稿日期:  2024-06-03
  • 修回日期:  2024-09-29
  • 录用日期:  2024-10-29
  • 网络出版日期:  2025-04-07
  • 刊出日期:  2025-04-08

目录

    /

    返回文章
    返回