基于雨水泵站结构特征的基坑换撑优化设计

黄学刚 赵伟 马军英

黄学刚, 赵伟, 马军英. 基于雨水泵站结构特征的基坑换撑优化设计[J]. 岩土工程技术, 2025, 39(2): 232-238. doi: 10.20265/j.cnki.issn.1007-2993.2024-0031
引用本文: 黄学刚, 赵伟, 马军英. 基于雨水泵站结构特征的基坑换撑优化设计[J]. 岩土工程技术, 2025, 39(2): 232-238. doi: 10.20265/j.cnki.issn.1007-2993.2024-0031
Huang Xuegang, Zhao Wei, Ma Junying. Optimization design of foundation pit support replacement based on the structural characteristics of rainwater pump station[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2025, 39(2): 232-238. doi: 10.20265/j.cnki.issn.1007-2993.2024-0031
Citation: Huang Xuegang, Zhao Wei, Ma Junying. Optimization design of foundation pit support replacement based on the structural characteristics of rainwater pump station[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2025, 39(2): 232-238. doi: 10.20265/j.cnki.issn.1007-2993.2024-0031

基于雨水泵站结构特征的基坑换撑优化设计

doi: 10.20265/j.cnki.issn.1007-2993.2024-0031
详细信息
    作者简介:

    黄学刚,男,1986年生,硕士,高级工程师,注册土木工程师(岩土),主要从事岩土工程设计与施工管理工作。E-mail:964711840@qq.com

  • 中图分类号: TU473

Optimization design of foundation pit support replacement based on the structural characteristics of rainwater pump station

  • 摘要: 某雨水泵站基坑深16.16 m,采用支护桩+4道钢管内支撑支护。泵站地下二层高8.9 m,原设计方案第三道支撑拆撑未设置有效换撑,第三道支撑拆除后将导致地下二层侧墙处于悬臂状态,严重影响基坑和泵站结构的安全。结合雨水泵站的结构特征,采用永临结合的换撑方案,在②—⑤轴侧墙第三道支撑下1 m处设置暗梁和永久混凝土梁作为换撑,既解决了基坑的换撑问题,又不影响泵站的使用功能,避免了有限空间内拆换撑的安全风险。结合基坑开挖阶段的监测数据,运用有限元软件midas GTS建立基坑施工过程的三维数值模型,从支护桩深层水平位移、钢支撑轴力及立柱沉降等方面对三维数值模型的合理性进行验证,再利用验证后的模型对基坑拆撑工况进行模拟,预测基坑变形。分析结果表明基坑换撑优化设计方案安全可靠、合理可行,可为类似工程参考。

     

  • 图  1  拟建场地典型地质剖面图

    图  2  基坑支护及监测平面图

    图  3  原设计拆换撑方案

    图  4  原设计方案基坑水平变形

    图  5  基坑换撑优化设计平面图

    图  6  基坑换撑优化设计剖面图

    图  7  永久换撑梁和暗梁的尺寸及配筋图(单位:mm)

    图  8  第三道支撑拆除后支护桩变形(换撑优化后)

    图  9  深基坑三维模型图

    图  10  深基坑支护结构单元网格图

    图  11  施工阶段四(开挖至基底)基坑水平变形GTS模拟

    图  12  开挖阶段基坑最大水平变形对比图

    图  13  开挖阶段桩顶竖向位移对比图

    图  14  开挖到底时钢支撑轴力变化对比图

    图  15  钢支撑ZL02监测轴力变化图

    图  16  开挖阶段立柱沉降变化对比图

    图  17  开挖到底时立柱沉降云图

    图  18  施工阶段基坑最大水平变形对比图

    图  19  施工阶段立柱沉降变化对比图

    图  20  施工阶段桩顶竖向位移对比图

    表  1  模型土体参数表

    土层γ
    /(kN·m−3
    c
    /kPa
    φ
    /(°)
    Es
    /MPa
    υ
    填土①118.08105.00.40
    粉土②19.8122511.20.32
    粉质黏土③19.83312.37.90.35
    粉土④18.3152814.40.32
    粉质黏土⑤19.930128.30.35
    粉土⑤120.8152514.60.32
    细粉砂⑥20.503255.00.25
    粉质黏土⑦20.130129.10.35
    下载: 导出CSV

    表  2  基坑施工阶段划分

    施工阶段施工内容
    支护桩、冠梁、第一道支撑,第一步土方开挖
    第二道支撑施工,第二步土方开挖
    第三道支撑施工,第三步土方开挖
    第四道支撑施工,开挖至基底
    换撑一施工,拆除第四道支撑
    换撑二施工,拆除第三道支撑
    换撑三施工,拆除第二道支撑
    拆除第一道支撑
    下载: 导出CSV
  • [1] 付志杰, 朱泽清, 卢云山, 等. 地铁站深基坑内支撑体系换撑优化施工[J]. 施工技术,2017,46(7):94-97. (FU Z J, ZHU Z Q, LU Y S, et al. Optimization of bracing system for deep foundation excavation of subway station[J]. Construction Technology,2017,46(7):94-97. (in Chinese)

    FU Z J, ZHU Z Q, LU Y S, et al. Optimization of bracing system for deep foundation excavation of subway station[J]. Construction Technology, 2017, 46(7): 94-97. (in Chinese)
    [2] 朱海军, 叶亦盛, 龚 杰. 武汉I级阶地地铁车站深基坑换撑优化分析[J]. 施工技术,2018,47(S1):103-107. (ZHU H J, YE Y S, GONG J. Optimization analysis of steel change support for deep foundation excavation of Wuhan I terrace subway station[J]. Construction Technology,2018,47(S1):103-107. (in Chinese)

    ZHU H J, YE Y S, GONG J. Optimization analysis of steel change support for deep foundation excavation of Wuhan I terrace subway station[J]. Construction Technology, 2018, 47(S1): 103-107. (in Chinese)
    [3] 戈 铭, 贺智江, 张 煌, 等. 南京长江漫滩某深基坑换撑优化设计案例分析[J]. 南京工程学院学报(自然科学版),2020,18(2):34-40. (GE M, HE Z J, ZHANG H, et al. A case study of an optimization design in removal of braces of an excavation foundation in Nanjing Yangtze river floodplain[J]. Journal of Nanjing Institute of Technology (Natural Science Edition),2020,18(2):34-40. (in Chinese)

    GE M, HE Z J, ZHANG H, et al. A case study of an optimization design in removal of braces of an excavation foundation in Nanjing Yangtze river floodplain[J]. Journal of Nanjing Institute of Technology (Natural Science Edition), 2020, 18(2): 34-40. (in Chinese)
    [4] 李向荣, 历朋林. 地铁车站深基坑换撑施工优化探讨[J]. 探矿工程(岩土钻掘工程),2009,36(12):47-50. (LI X R, LI P L. Discussion on optimization of support replacement for deep excavation in subway station construction[J]. Drilling Engineering,2009,36(12):47-50. (in Chinese)

    LI X R, LI P L. Discussion on optimization of support replacement for deep excavation in subway station construction[J]. Drilling Engineering, 2009, 36(12): 47-50. (in Chinese)
    [5] 魏冬冬, 陈晨伟, 胡 冬, 等. 一种无中板大型地下泵站深基坑支护换撑技术[J]. 城市道桥与防洪, 2020(11): 221-223. (WEI D D, CHEN C W, HU D, et al. A support replacement technology for deep foundation pit supporting of large underground pumping station without medium plate[J]. Urban Roads Bridges & Flood Control, 2020(11): 221-223. (in Chinese)

    WEI D D, CHEN C W, HU D, et al. A support replacement technology for deep foundation pit supporting of large underground pumping station without medium plate[J]. Urban Roads Bridges & Flood Control, 2020(11): 221-223. (in Chinese)
    [6] 杨有明. 狭窄施工场地内的深基坑内支撑梁拆除方案优化与施工[J]. 建筑施工,2017,39(6):778-780. (YANG Y M. Scheme optimization and construction of inner support beam removal in deep foundation pit at narrow construction site[J]. Building Construction,2017,39(6):778-780. (in Chinese)

    YANG Y M. Scheme optimization and construction of inner support beam removal in deep foundation pit at narrow construction site[J]. Building Construction, 2017, 39(6): 778-780. (in Chinese)
    [7] 金 旭, 苗晓鹏, 吕圣岚, 等. 北京地区某深基坑支护设计与监测数据对比分析[J]. 岩土工程技术,2023,37(4):499-504. (JIN X, MIAO X P, LV S L, et al. Design and monitoring analysis of a deep foundation pit in Beijing[J]. Geotechnical Engineering Technique,2023,37(4):499-504. (in Chinese) doi: 10.3969/j.issn.1007-2993.2023.04.022

    JIN X, MIAO X P, LV S L, et al. Design and monitoring analysis of a deep foundation pit in Beijing[J]. Geotechnical Engineering Technique, 2023, 37(4): 499-504. (in Chinese) doi: 10.3969/j.issn.1007-2993.2023.04.022
    [8] 樊凤凯, 薛 双. 南京市某地铁车站深基坑变形分析与优化设计[J]. 长春工程学院学报(自然科学版),2020,21(3):38-43. (FAN F K, XUE S. Deformation analysis and optimum design of deep foundation pit of a subway station in Nanjing[J]. Journal of Changchun Institute of Technology (Natural Science Edition),2020,21(3):38-43. (in Chinese)

    FAN F K, XUE S. Deformation analysis and optimum design of deep foundation pit of a subway station in Nanjing[J]. Journal of Changchun Institute of Technology (Natural Science Edition), 2020, 21(3): 38-43. (in Chinese)
    [9] 胡敏云, 夏佳莉, 寿树德, 等. 相邻基坑围护结构变形及控制的模拟与实测[J]. 浙江工业大学学报,2023,51(5):497-503,552. (HU M Y, XIA J L, SHOU S D, et al. Simulation and measurement on the deformation and control effect of adjacent foundation pit excavations[J]. Journal of Zhejiang University of Technology,2023,51(5):497-503,552. (in Chinese) doi: 10.3969/j.issn.1006-4303.2023.05.004

    HU M Y, XIA J L, SHOU S D, et al. Simulation and measurement on the deformation and control effect of adjacent foundation pit excavations[J]. Journal of Zhejiang University of Technology, 2023, 51(5): 497-503,552. (in Chinese) doi: 10.3969/j.issn.1006-4303.2023.05.004
    [10] 孟建龙. 宁波某地铁深基坑支护数值模拟与监测分析[D]. 淮南: 安徽理工大学, 2022. (MENG J L. Numerical simulation and monitoring analysis of deep foundation pit support of a metro in Ningbo[D]. Huainan: Anhui University of Science and Technology, 2022. (in Chinese)

    MENG J L. Numerical simulation and monitoring analysis of deep foundation pit support of a metro in Ningbo[D]. Huainan: Anhui University of Science and Technology, 2022. (in Chinese)
  • 加载中
图(20) / 表(2)
计量
  • 文章访问数:  39
  • HTML全文浏览量:  8
  • PDF下载量:  13
  • 被引次数: 0
出版历程
  • 收稿日期:  2024-01-17
  • 修回日期:  2024-10-09
  • 录用日期:  2024-10-29
  • 网络出版日期:  2025-04-07
  • 刊出日期:  2025-04-08

目录

    /

    返回文章
    返回