Application of comprehensive geological prediction technology in Wuzhishan Tunnel
-
摘要: 在复杂地质隧道施工过程中,为了探明掌子面前段地质情况,预防隧道软岩断裂、涌水突泥等不良地质作用,应以地质分析为主线,长短距离超前地质预报相结合为依据,建立隧道动态综合预报及设计的管理体系。在G4216线仁寿至屏山新市段高速公路五指山特长隧道施工中,针对多种不良地质体,采用了地质分析法、超前水平钻探法、地质雷达法、瞬变电磁法、地震波法等超前地质预报方法,建立隧道动态综合预报及设计的管理体系,指导动态设计,并根据施工进度进行开挖后的对比验证。该管理体系降低了隧道施工的地质安全风险,具有科学性、经济性和安全性,可为类似复杂地质条件的隧道超前地质预报和动态设计提供参考和借鉴。Abstract: During the construction of tunnels under complex geological conditions, to investigate the geological conditions ahead of the tunnel face and prevent adverse geological hazards such as soft rock fracture, water inrush and mud outburst, a management system for dynamic comprehensive geological prediction and design of tunnels should be established with geological analysis as the main line and the combination of long and short distance advanced geological prediction as the basis. In the construction of the Wuzhishan Extra long Tunnel on the Renshou to Pingshan Xinshi section of the G4216 Expressway, aiming at various adverse geological bodies, multiple advanced geological prediction methods including geological analysis, advanced horizontal drilling, ground penetrating radar, transient electromagnetic method and seismic wave method were adopted. A management system for dynamic comprehensive prediction and design was constructed to guide dynamic design, and post excavation comparative verification was carried out according to construction progress. This management system reduces geological safety risks in tunnel construction, featuring scientificity, economy and safety. It can provide references for advanced geological prediction and dynamic design of tunnels under similar complex geological conditions.
-
表 1 各超前地质预报方法的特点
Table 1. Characteristics of various advance geological prediction methods
预报方法 理论原理 针对地质构造 预报距离/m 优点 缺点 预报精度 地质分析法 地质理论+经验 均适用 <10 成本低,可正常施工 受人员水平和经验影响,人为因素大 高 超前水平钻探法 直接钻孔
揭露地层均适用 <80 直观,直接有效,说服力强 成本高,耗时长,易发生漏探漏报 高 地质雷达法(GPR) 电磁波+
介电常数围岩破碎带、断层、岩溶、空洞、裂隙水 <30 分辨率高,围岩周边无扰动 距离短,受金属等介质干扰因素大 高 瞬变电磁法(TEM) 电阻率+
二次场衰减溶隙、含水破碎带、含水裂隙、低阻断层带 <120 对富水地段敏感,电阻衰减明显 受金属等介质干扰因素大 低 地震波法
(TGP、TSP)地震波+波阻抗 断层、破碎岩体 100~200 直观,对规模较大的不良地质体(断层、破碎岩体等)界面探测效果较好 能量不集中,定位不准确,反射面接受干扰因素大 低 表 2 各超前地质预报组合分析与实际开挖情况对比
Table 2. Comparison of combined analyses of various advanced geological prediction methods with actual excavation conditions
编号 设计方案及预测方法 预测地质情况 预报结论 组合分析判定 实际开挖情况 对比评价 1 设计方案 1. ZK139+115—ZK139+093为灰岩、泥灰岩、粉砂质泥岩;粉砂质泥岩呈紫色、紫红色,泥灰岩呈灰黄色,灰岩呈白灰色,均呈薄—中厚层状,层状砌体—碎裂结构;
2. ZK139+093—ZK139+073为岩溶角砾岩夹泥灰岩,灰、灰白、灰黄色,灰岩呈角砾状,含膏盐,溶蚀强烈,部分胶结,岩质软,部分并被黏土充填,存在溶隙、溶孔、溶蚀管道等溶蚀现象;
3. 局部存在溶蚀管道,隧道开挖过程中拱顶和侧壁稳定性低,易发生大型坍塌,有集中涌突水可能设计为
Ⅴ级围岩组合分析:
1. 掌子面ZK139+103围岩情况:岩体破碎严重,自稳性极差,局部剥离,掌子面出现涌状水流,拱顶为淋雨状。掌子面不良气体检测数据显示:瓦斯(浓度≤0.02%),无其它不良气体;
2. 据超前地质预报判断,参考地应力测试分析报告(本段埋深为950~959 m),并结合围岩判定描述的重要指标,隧道开挖过程中拱顶和侧壁稳定性低,易发生大型坍塌,有集中涌突水可能,建议增强支护参数施工
综合分析判定:
本段围岩为Ⅴ级围岩,ZK139+103—ZK139+073段衬砌结构按Z5a型、超前支护按B型设计施工1.(ZK139+103—ZK139+83)围岩为灰岩、泥灰岩、粉砂质泥岩,岩质软,岩体破碎,完整性差,有溶蚀现象,地下水发育,拱顶至两侧拱腰呈淋雨状出水,掌子面有股状水流,层间结合差,稳定性差,左侧拱部掉块严重,有小型塌腔(环向长度约4 m,宽2 m,高2 m);
2.(ZK139+080—ZK139+078)围岩为灰岩、泥灰岩,岩质软,岩体破碎,完整性差,地下水发育,拱顶呈淋雨状出水,层间结合差,局部有黏土填充,稳定性差。有塌腔(环向长度约2.5 m,宽2 m,高2 m);
3.(ZK139+076—ZK139+073)围岩为灰岩、泥灰岩、岩溶角砾岩,岩质软,有一定的溶蚀现象、破碎,拱顶至两侧拱腰呈淋雨状出水,层间结合差,局部有黏土填充,稳定性差基本吻合 2 钻探法 主要为泥灰岩夹角砾岩夹泥,含膏盐,岩质软—极软,岩体破碎,节理裂隙极发育,存在强烈溶蚀现象,部分被黏土充填,存在溶隙。隧道开挖过程中拱顶和侧壁稳定性低,易发生大型坍塌,地下水发育,有集中涌突水可能 建议按Ⅴ级围岩适当增强支护参数 基本吻合 3 TSP法 据岩体破碎三维图、纵波波速分布图和含水三维图推断分析:ZK139+092—ZK139+088段右侧附近、ZK139+077—ZK139+067段中左附近应力反射信号强,推测岩质软弱,溶蚀裂隙较发育,层间结合差,岩体较破碎,稳定性差,开挖面拱部易失稳坍塌,地下水弱发育
建议按Ⅴ级围岩 基本吻合 4 GPR法 前方围岩为泥灰岩夹灰岩,岩质软,岩体破碎,完整性差,地下水较发育,层间结合差,稳定性差,部分含软弱层或泥夹层 建议按Ⅴ级围岩 吻合 5 TEM法 前方围岩较破碎—一般破碎不等且富水性强。推断可能出现浸渗–滴水现象,65 m范围内掌子面岩层富水性增强,岩层逐渐变差,可能出现股状出水现象,有涌突水可能 建议按Ⅴ级围岩 基本吻合 注:目标预报段左线ZK139+103—ZK139+073;围岩V级、衬砌结构Z5a型、超前支护B型。 -
[1] 钱七虎. 地下工程建设安全面临的挑战与对策[J]. 岩石力学与工程学报, 2012, 31(10): 1945-1956. (QIAN Q H. Challenges faced by underground projects construction safety and countermeasures[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(10): 1945-1956. (in Chinese) doi: 10.3969/j.issn.1000-6915.2012.10.001QIAN Q H. Challenges faced by underground projects construction safety and countermeasures[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(10): 1945-1956. (in Chinese) doi: 10.3969/j.issn.1000-6915.2012.10.001 [2] 雷盼盼, 王军伟, 史海智. 综合超前地质预报在天竺山一号岩溶隧道中的应用[J]. 工程地球物理学报, 2024, 21(6): 996-1005. (LEI P P, WANG J W, SHI H Z. Application of comprehensive advanced geological prediction method in karst tunnel of Tianzhushan No. 1[J]. Chinese Journal of Engineering Geophysics, 2024, 21(6): 996-1005. (in Chinese) doi: 10.3969/j.issn.1672-7940.2024.06.009LEI P P, WANG J W, SHI H Z. Application of comprehensive advanced geological prediction method in karst tunnel of Tianzhushan No. 1[J]. Chinese Journal of Engineering Geophysics, 2024, 21(6): 996-1005. (in Chinese) doi: 10.3969/j.issn.1672-7940.2024.06.009 [3] 雷 栋, 胡祥云. 地震层析成像方法综述[J]. 地震研究, 2020, 44(2): 227-234. (LEI D, HU X Y. A review of seismic tomography methods[J]. Geophysical & Geochemical Exploration, 2006, 39(4): 227-234. (in Chinese)LEI D, HU X Y. A review of seismic tomography methods[J]. Geophysical & Geochemical Exploration, 2006, 39(4): 227-234. (in Chinese) [4] 李术才, 刘 斌, 孙怀凤, 等. 隧道施工超前地质预报研究现状及发展趋势[J]. 岩石力学与工程学报, 2014, 33(6): 1090-1113. (LI S C, LIU B, SUN H F, et al. State of art and trends of advanced geological prediction in tunnel construction[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(6): 1090-1113. (in Chinese)LI S C, LIU B, SUN H F, et al. State of art and trends of advanced geological prediction in tunnel construction[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(6): 1090-1113. (in Chinese) [5] 谷 松. 探地雷达技术在隧道施工超前地质预报的应用[J]. 地质装备, 2022, 23(5): 36-39. (GU S. Application of GPR in advanced geological forecast for tunnelling[J]. Equipment for Geotechnical Engineering, 2022, 23(5): 36-39. (in Chinese)GU S. Application of GPR in advanced geological forecast for tunnelling[J]. Equipment for Geotechnical Engineering, 2022, 23(5): 36-39. (in Chinese) [6] 李术才, 薛翊国, 张庆松, 等. 高风险岩溶地区隧道施工地质灾害综合预报预警关键技术研究[J]. 岩石力学与工程学报, 2008, 27(7): 1297-1307. (LI S C, XUE Y G, ZHANG Q S, et al. Key technology study on comprehensive prediction and early-warning of geological hazards during tunnel construction in high-risk karst areas[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(7): 1297-1307. (in Chinese)LI S C, XUE Y G, ZHANG Q S, et al. Key technology study on comprehensive prediction and early-warning of geological hazards during tunnel construction in high-risk karst areas[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(7): 1297-1307. (in Chinese) [7] 李天斌, 孟陆波, 朱 劲, 等. 隧道超前地质预报综合分析方法[J]. 岩石力学与工程学报, 2009, 28(12): 2429-2436. (LI T B, MENG L B, ZHU J, et al. Comprehensive analysis method for advanced forecast of geology in tunnels[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(12): 2429-2436. (in Chinese) doi: 10.20259/j.jzjskf.2025.02.0078LI T B, MENG L B, ZHU J, et al. Comprehensive analysis method for advanced forecast of geology in tunnels[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(12): 2429-2436. (in Chinese) doi: 10.20259/j.jzjskf.2025.02.0078 [8] 邵珠山, 张鹏举, 张 喆, 等. 隧道施工超前地质预报研究进展[J]. 长江科学院院报, 2022, 39(1): 70-77,85. (SHAO Z S, ZHANG P J, ZHANG Z, et al. Research progress of advanced geological prediction in tunnel construction[J]. Journal of Yangtze River Scientific Research Institute, 2022, 39(1): 70-77,85. (in Chinese) doi: 10.11988/ckyyb.20200874SHAO Z S, ZHANG P J, ZHANG Z, et al. Research progress of advanced geological prediction in tunnel construction[J]. Journal of Yangtze River Scientific Research Institute, 2022, 39(1): 70-77,85. (in Chinese) doi: 10.11988/ckyyb.20200874 [9] 中国电建集团贵阳勘测设计研究院有限公司. 隧道施工超前地质预报技术规程: T/CECS 616—2019[S]. 北京: 中国建筑工业出版社, 2019. (Powerchina Guiyang Engineering Corporation Limited. Technical specification for advance geological predication for tunnel construction: T/CECS 616—2019[S]. Beijing: China Architecture & Building Press, 2019. (in Chinese)Powerchina Guiyang Engineering Corporation Limited. Technical specification for advance geological predication for tunnel construction: T/CECS 616—2019[S]. Beijing: China Architecture & Building Press, 2019. (in Chinese) [10] 高树全, 蒋良文, 牟元存, 等. 西南复杂艰险山区铁路隧道超前地质预报技术[J]. 现代隧道技术, 2024, 61(2): 52-59. (GAO S Q, JIANG L W, MOU Y C, et al. Advanced geological forecasting techniques for railway tunnels in the complex and treacherous mountainous areas of southwest China[J]. Modern Tunnelling Technology, 2024, 61(2): 52-59. (in Chinese) doi: 10.13807/j.cnki.mtt.2024.02.006GAO S Q, JIANG L W, MOU Y C, et al. Advanced geological forecasting techniques for railway tunnels in the complex and treacherous mountainous areas of southwest China[J]. Modern Tunnelling Technology, 2024, 61(2): 52-59. (in Chinese) doi: 10.13807/j.cnki.mtt.2024.02.006 [11] 贾 明, 庄 威, 孙晋哲. 某矿瞬变电磁探测实施方案研究[J]. 山东煤炭科技, 2014(2): 145-146,149. (JIA M, ZHUANG W, SUN J Z. Research on some mine transient electromagnetic detection scheme[J]. Shandong Coal Science and Technology, 2014(2): 145-146,149. (in Chinese) doi: 10.3969/j.issn.1005-2801.2014.02.67JIA M, ZHUANG W, SUN J Z. Research on some mine transient electromagnetic detection scheme[J]. Shandong Coal Science and Technology, 2014(2): 145-146,149. (in Chinese) doi: 10.3969/j.issn.1005-2801.2014.02.67 [12] 任建伟, 谢雄刚, 左冉振. 基于瞬变电磁法的矿井水害探测技术应用[J]. 煤矿开采, 2014, 19(1): 17-20. (REN J W, XIE X G, ZUO R Z. Application of mine water exploration technology based on transient electromagnetic method[J]. Coal Mining Technology, 2014, 19(1): 17-20. (in Chinese) doi: 10.13532/j.cnki.cn11-3677/td.2014.01.005REN J W, XIE X G, ZUO R Z. Application of mine water exploration technology based on transient electromagnetic method[J]. Coal Mining Technology, 2014, 19(1): 17-20. (in Chinese) doi: 10.13532/j.cnki.cn11-3677/td.2014.01.005 [13] 崔 涛, 李建雄, 张庆彬, 等. TGP206地质超前预报在岩溶隧道施工中的应用[J]. 矿业研究与开发, 2011, 31(1): 29-32,76. (CUI T, LI J X, ZHANG Q B, et al. Application of TGP206 Advanced geological forecast system in karst tunnel construction[J]. Mining Research and Development, 2011, 31(1): 29-32,76. (in Chinese) doi: 10.13827/j.cnki.kyyk.2017.02.024CUI T, LI J X, ZHANG Q B, et al. Application of TGP206 Advanced geological forecast system in karst tunnel construction[J]. Mining Research and Development, 2011, 31(1): 29-32,76. (in Chinese) doi: 10.13827/j.cnki.kyyk.2017.02.024 [14] 吴星银. TGP206型隧道地质超前预报仪在灵岩山隧道中的应用[J]. 铁道建筑技术, 2010(9): 102-103,118. (WU X Y. Application of TGP206 type tunnel geological forecast instrument in Lingyan mountain tunnel[J]. Railway Construction Technology, 2010(9): 102-103,118. (in Chinese) doi: 10.3969/j.issn.1009-4539.2010.09.027WU X Y. Application of TGP206 type tunnel geological forecast instrument in Lingyan mountain tunnel[J]. Railway Construction Technology, 2010(9): 102-103,118. (in Chinese) doi: 10.3969/j.issn.1009-4539.2010.09.027 [15] 陈亚乾, 李 天, 普新凯. 综合地球物理方法在隧道塌方处置中的应用研究[J]. 物探化探计算技术, 2020, 42(5): 670-677. (CHEN Y Q, LI T, PU X K. Application of integrated geophysics in tunnel collapse treatment[J]. Computing Techniques for Geophysical and Geochemical Exploration, 2020, 42(5): 670-677. (in Chinese) doi: 10.3969/j.issn.1001-1749.2020.05.15CHEN Y Q, LI T, PU X K. Application of integrated geophysics in tunnel collapse treatment[J]. Computing Techniques for Geophysical and Geochemical Exploration, 2020, 42(5): 670-677. (in Chinese) doi: 10.3969/j.issn.1001-1749.2020.05.15 [16] 李术才, 李树忱, 张庆松, 等. 岩溶裂隙水与不良地质情况超前预报研究[J]. 岩石力学与工程学报, 2007, 26(2): 217-225. (LI S C, LI S C, ZHANG Q S, et al. Forecast of karst-fractured groundwater and defective geological conditions[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(2): 217-225. (in Chinese) doi: 10.3321/j.issn:1000-6915.2007.02.001LI S C, LI S C, ZHANG Q S, et al. Forecast of karst-fractured groundwater and defective geological conditions[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(2): 217-225. (in Chinese) doi: 10.3321/j.issn:1000-6915.2007.02.001 [17] 蒋小平, 张 军, 韩 正, 等. 长大山岭瓦斯隧道施工通风影响下瓦斯运移扩散规律探究[J]. 中国公路, 2022(4): 100-103. (JIANG X P, ZHANG Jun, HAN Z, et al. Investigation of gas transport and dispersion mechanisms in extended mountain tunnels during ventilated construction[J]. China Highway, 2022(4): 100-103. (in Chinese)JIANG X P, ZHANG Jun, HAN Z, et al. Investigation of gas transport and dispersion mechanisms in extended mountain tunnels during ventilated construction[J]. China Highway, 2022(4): 100-103. (in Chinese) [18] 王 涛. 聚能水压光面爆破技术在隧道施工中的应用[J]. 四川建材, 2019, 45(4): 94-95, 98. (WANG T. The application of energy-concentrated hydraulic smooth blasting technology in tunnel construction[J]. Sichuan Building Materials, 2019, 45(4): 94-95, 98. (in Chinese)WANG T. The application of energy-concentrated hydraulic smooth blasting technology in tunnel construction[J]. Sichuan Building Materials, 2019, 45(4): 94-95, 98. (in Chinese) [19] 中华人民共和国交通运输部. 公路隧道施工技术规范: JTG/T 3660—2020[S]. 北京: 人民交通出版社, 2020. (Ministry of Transport of the People’s Republic of China. Technical specifications for construction of highway tunnel: JTG/T 3660—2020[S]. Beijing: China Communications Press, 2020. (in Chinese)Ministry of Transport of the People’s Republic of China. Technical specifications for construction of highway tunnel: JTG/T 3660—2020[S]. Beijing: China Communications Press, 2020. (in Chinese) [20] 李万勇, 刘汉明, 唐 皓, 等. 复杂软弱围岩低瓦斯隧道大变形综合处置技术研究[J]. 四川建材, 2022, 48(10): 76-78,81. (LI W Y, LIU H M, TANG H, et al. Research on comprehensive disposal technology for large deformation of complex weak surrounding rock low gas tunnel[J]. Sichuan Building Materials, 2022, 48(10): 76-78,81. (in Chinese) doi: 10.3969/j.issn.1672-4011.2022.10.034LI W Y, LIU H M, TANG H, et al. Research on comprehensive disposal technology for large deformation of complex weak surrounding rock low gas tunnel[J]. Sichuan Building Materials, 2022, 48(10): 76-78,81. (in Chinese) doi: 10.3969/j.issn.1672-4011.2022.10.034 [21] 温 辉. 基于三维超前地质预报的瓦斯隧道穿越破碎段施工技术[J]. 铁道建筑技术, 2022(9): 193-197. (WEN H. Construction technology of gas tunnel crossing broken section based on 3D advance geological forecast[J]. Railway Construction Technology, 2022(9): 193-197. (in Chinese)WEN H. Construction technology of gas tunnel crossing broken section based on 3D advance geological forecast[J]. Railway Construction Technology, 2022(9): 193-197. (in Chinese) -