Construction impact of a new mined tunnel undercrossing an overlying stormwater box culvert and an underlying existing tunnel
-
摘要: 新建地下工程近接既有地下结构的工程类型愈发普遍,严格控制该类新建地下工程施工对既有地下结构的影响是工程建设成功的关键。某地铁站新建换乘通道暗挖隧道穿越上覆雨水箱涵与下卧既有隧道,以该暗挖工程为背景,基于现场实测与三维有限元分析,研究中洞法施工工艺对地表沉降、新建隧道及既有结构物变形的影响规律。研究表明:新建暗挖隧道采用中洞法分层、分块、分区、分段施工,并结合水平旋喷桩超前预加固不良地层,可有效控制地层沉降及结构物变形;中洞法施工的开挖进尺对既有隧道与雨水箱涵变形影响较大,施工中需要严格控制开挖进尺,以减小对既有结构的影响。研究成果可为同类地下工程建设提供借鉴。Abstract: New underground projects in close proximity to existing underground structures are becoming increasingly common. Strictly controlling the impact of the construction of such new underground works on existing structures is the key to the success of the project. Taking the construction of a new transfer passage tunnel at a subway station, which underpasses an existing tunnel and passes beneath an overlying stormwater box culvert, as a case study, this paper investigates the influence laws of the Center Diaphragm (CD) method on surface settlement and the deformation of both the new tunnel and existing structures. The study is based on field monitoring data and three-dimensional finite element analysis. The results indicate that adopting the CD method—characterized by layered, block, zoned, and segmented excavation—combined with advance horizontal jet grouting for ground improvement, can effectively control ground settlement and structural deformation. Furthermore, the excavation footage in the CD method significantly affects the deformation of the existing tunnel and the stormwater box culvert; therefore, the excavation footage must be strictly controlled during construction to minimize impacts on existing structures. The findings of this study can provide valuable references for the construction of similar underground projects.
-
表 1 主要地层物理力学参数
Table 1. Physical parameters of soil
地层 厚度
/m密度
/(kg·m−3)弹性
模量
/MPa泊松比 黏聚力
/kPa内摩
擦角
/(°)素填土 5.0 1800 7 0.35 10 10 淤泥质黏土②2 5.0 1740 4 0.43 5 3 粉质黏土③4 1.7 1950 25 0.30 25 25 粗砂③8 9.1 1960 50 0.26 0 28 全风化花岗岩⑧1 1.0 2000 80 0.28 28 35 砂土状强风化
花岗岩⑧2-114.0 2200 100 0.28 37 45 -
[1] 李晓峰, 王炳华, 徐建航, 等. 近距离双孔隧道地表沉降预测与应用[J]. 岩土工程技术, 2025, 39(3): 353-360. (LI X F, WANG B H, XU J H, et al. Surface settlement prediction and application of short-distance twin-bore tunnels[J]. Geotechnical Engineering Technique, 2025, 39(3): 353-360. (in Chinese)LI X F, WANG B H, XU J H, et al. Surface settlement prediction and application of short-distance twin-bore tunnels[J]. Geotechnical Engineering Technique, 2025, 39(3): 353-360. (in Chinese) [2] 王 睿, 苗龙刚, 章慧健, 等. 砂卵石地层新建通道施工对上覆既有地铁车站的变形影响研究[J]. 现代隧道技术, 2021, 58(6): 129-136,154. (WANG R, MIAO L G, ZHANG H J, et al. Study on influence of new transfer channel construction on deformation of overlying existing metro station in sandy pebble stratum[J]. Modern Tunnelling Technology, 2021, 58(6): 129-136,154. (in Chinese)WANG R, MIAO L G, ZHANG H J, et al. Study on influence of new transfer channel construction on deformation of overlying existing metro station in sandy pebble stratum[J]. Modern Tunnelling Technology, 2021, 58(6): 129-136,154. (in Chinese) [3] DING Z, ZHANG M B, ZHANG X, et al. Theoretical analysis on the deformation of existing tunnel caused by under-crossing of large-diameter slurry shield considering construction factors[J]. Tunnelling and Underground Space Technology, 2023, 133: 104913. doi: 10.1016/j.tust.2022.104913 [4] 韩 煊, 王 鑫. 北京地区深基坑工程引起地表沉降规律研究[J]. 建筑科学, 2020, 36(S1): 185-190. (HUAN X, WANG X. Ground surface settlement profiles caused by deep excavation in Beijing[J]. Building Science, 2020, 36(S1): 185-190. (in Chinese)HUAN X, WANG X. Ground surface settlement profiles caused by deep excavation in Beijing[J]. Building Science, 2020, 36(S1): 185-190. (in Chinese) [5] 丁祖德, 彭立敏, 施成华. 地铁隧道穿越角度对地表建筑物的影响分析[J]. 岩土力学, 2011, 32(11): 3387-3392. (DING Z D, PENG L M, SHI C H. Analysis of influence of metro tunnel crossing angles on ground buildings[J]. Rock and Soil Mechanics, 2011, 32(11): 3387-3392. (in Chinese)DING Z D, PENG L M, SHI C H. Analysis of influence of metro tunnel crossing angles on ground buildings[J]. Rock and Soil Mechanics, 2011, 32(11): 3387-3392. (in Chinese) [6] 苗晨阳, 黄强兵, 苟玉轩, 等. 地裂缝场地盾构隧道下穿施工对既有管廊的影响研究[J]. 现代隧道技术, 2022, 59(3): 155-165,171. (MIAO C Y, HUANG Q B, GOU Y X, et al. Study on the impact of shield tunnel under-crossing at ground fissure site on existing utility tunnels[J]. Modern Tunnelling Technology, 2022, 59(3): 155-165,171. (in Chinese)MIAO C Y, HUANG Q B, GOU Y X, et al. Study on the impact of shield tunnel under-crossing at ground fissure site on existing utility tunnels[J]. Modern Tunnelling Technology, 2022, 59(3): 155-165,171. (in Chinese) [7] LIN X T, CHEN R P, WU H N, et al. Deformation behaviors of existing tunnels caused by shield tunneling undercrossing with oblique angle[J]. Tunnelling and Underground Space Technology, 2019, 89: 78-90. doi: 10.1016/j.tust.2019.03.021 [8] YIN M L, JIANG H, JIANG Y S, et al. Effect of the excavation clearance of an under-crossing shield tunnel on existing shield tunnels[J]. Tunnelling and Underground Space Technology, 2018, 78: 245-258. doi: 10.1016/j.tust.2018.04.034 [9] 孙武鹏. 明挖深埋隧道下穿施工对高速铁路桥梁的影响[J]. 铁道建筑, 2023, 63(3): 113-117. (SUN W P. Influence of underpass construction of deep-covered tunnel with open-cut method on high speed railway bridge[J]. Railway Engineering, 2023, 63(3): 113-117. (in Chinese) doi: 10.3969/j.issn.1003-1995.2023.03.24SUN W P. Influence of underpass construction of deep-covered tunnel with open-cut method on high speed railway bridge[J]. Railway Engineering, 2023, 63(3): 113-117. (in Chinese) doi: 10.3969/j.issn.1003-1995.2023.03.24 [10] 欧阳鸿志, 朱定桂, 安 斌, 等. 富水砂层盾构隧道下穿独立浅基础铁路桥加固方案比选研究[J]. 现代隧道技术, 2022, 59(5): 246-253. (OUYANG H Z, ZHU D G, AN B, et al. Comparative study on reinforcement schemes for shield tunnel under-crossing railway bridge with isolated shallow foundation in water-rich sand stratum[J]. Modern Tunnelling Technology, 2022, 59(5): 246-253. (in Chinese) doi: 10.13807/j.cnki.mtt.2022.05.030OUYANG H Z, ZHU D G, AN B, et al. Comparative study on reinforcement schemes for shield tunnel under-crossing railway bridge with isolated shallow foundation in water-rich sand stratum[J]. Modern Tunnelling Technology, 2022, 59(5): 246-253. (in Chinese) doi: 10.13807/j.cnki.mtt.2022.05.030 [11] 李清菲. 新建地铁线路下穿既有车站的仿真模拟分析[J]. 隧道建设, 2015, 35(12): 1275-1280. (LI Q F. Numerical simulation for new metro tunnel passing underneath existing metro station[J]. Tunnel Construction, 2015, 35(12): 1275-1280. (in Chinese)LI Q F. Numerical simulation for new metro tunnel passing underneath existing metro station[J]. Tunnel Construction, 2015, 35(12): 1275-1280. (in Chinese) [12] 万良勇, 宋战平, 曲建生, 等. 新建地铁隧道“零距离”下穿既有车站施工技术分析[J]. 现代隧道技术, 2015, 52(1): 168-176,183. (WAN L Y, SONG Z P, QU J S, et al. Anaysis of construction techniques for a metro tunnel approaching an existing station[J]. Modern Tunnelling Technology, 2015, 52(1): 168-176,183. (in Chinese) doi: 10.13807/j.cnki.mtt.2015.01.024WAN L Y, SONG Z P, QU J S, et al. Anaysis of construction techniques for a metro tunnel approaching an existing station[J]. Modern Tunnelling Technology, 2015, 52(1): 168-176,183. (in Chinese) doi: 10.13807/j.cnki.mtt.2015.01.024 [13] 陈爱青. 多线并行顶管穿越堤防沉降影响分析及应对措施研究[J]. 陕西水利, 2021(6): 19-21,27. (CHEN A Q. Recent progress and outlook of deep learning in the field of hydrological prediction model[J]. Shaanxi Water Resources, 2021(6): 19-21,27. (in Chinese) doi: 10.16747/j.cnki.cn61-1109/tv.2021.06.006CHEN A Q. Recent progress and outlook of deep learning in the field of hydrological prediction model[J]. Shaanxi Water Resources, 2021(6): 19-21,27. (in Chinese) doi: 10.16747/j.cnki.cn61-1109/tv.2021.06.006 [14] 仇文革, 万世付, 高刚刚, 等. 砂卵石地层盾构隧道下穿铁路咽喉区地表沉降控制研究[J]. 现代隧道技术, 2021, 58(5): 37-45. (QIU W G, WAN S F, GAO G G, et al. Study on the control measures against ground settlement induced by shield tunnel construction underneath railway throat in sandy cobble stratum[J]. Modern Tunnelling Technology, 2021, 58(5): 37-45. (in Chinese) doi: 10.13807/j.cnki.mtt.2021.05.005QIU W G, WAN S F, GAO G G, et al. Study on the control measures against ground settlement induced by shield tunnel construction underneath railway throat in sandy cobble stratum[J]. Modern Tunnelling Technology, 2021, 58(5): 37-45. (in Chinese) doi: 10.13807/j.cnki.mtt.2021.05.005 [15] 陈 旺, 彭焱锋, 刘维正, 等. 三孔顶管上穿施工对既有隧道与地表变形影响分析[J]. 现代隧道技术, 2025, 62(1): 170-182. (CHEN W, PENG Y F, LIU W Z, et al. Analysis of the impact of the three pipe jacking over-crossing construction on existing tunnel and surface deformation[J]. Modern Tunnelling Technology, 2025, 62(1): 170-182. (in Chinese)CHEN W, PENG Y F, LIU W Z, et al. Analysis of the impact of the three pipe jacking over-crossing construction on existing tunnel and surface deformation[J]. Modern Tunnelling Technology, 2025, 62(1): 170-182. (in Chinese) [16] 易 立. 城市新建隧道下穿既有道路影响分区研究[J]. 地下空间与工程学报, 2020, 16(5): 1490-1497. (YI L. Study on the influence zoning of the new urban tunnel under the existing road[J]. Chinese Journal of Underground Space and Engineering, 2020, 16(5): 1490-1497. (in Chinese)YI L. Study on the influence zoning of the new urban tunnel under the existing road[J]. Chinese Journal of Underground Space and Engineering, 2020, 16(5): 1490-1497. (in Chinese) -