新建暗挖隧道穿越上覆雨水箱涵与下卧既有隧道施工影响研究

罗云华,  周向国,  李堂磊,  张永兴,  张学民

罗云华, 周向国, 李堂磊, 张永兴, 张学民. 新建暗挖隧道穿越上覆雨水箱涵与下卧既有隧道施工影响研究[J]. 岩土工程技术, 2026, 40(5): 711-716. doi: 10.20265/j.cnki.issn.1007-2993.2025-0276
引用本文: 罗云华, 周向国, 李堂磊, 张永兴, 张学民. 新建暗挖隧道穿越上覆雨水箱涵与下卧既有隧道施工影响研究[J]. 岩土工程技术, 2026, 40(5): 711-716. doi: 10.20265/j.cnki.issn.1007-2993.2025-0276
LUO Yunhua, ZHOU Xiangguo, LI Tanglei, ZHANG Yongxing, ZHANG Xuemin. Construction impact of a new mined tunnel undercrossing an overlying stormwater box culvert and an underlying existing tunnel[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2026, 40(5): 711-716. doi: 10.20265/j.cnki.issn.1007-2993.2025-0276
Citation: LUO Yunhua, ZHOU Xiangguo, LI Tanglei, ZHANG Yongxing, ZHANG Xuemin. Construction impact of a new mined tunnel undercrossing an overlying stormwater box culvert and an underlying existing tunnel[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2026, 40(5): 711-716. doi: 10.20265/j.cnki.issn.1007-2993.2025-0276

新建暗挖隧道穿越上覆雨水箱涵与下卧既有隧道施工影响研究

doi: 10.20265/j.cnki.issn.1007-2993.2025-0276
详细信息
    作者简介:

    罗云华,男,1978年生,硕士,高级工程师,主要从事地基基础等方向研究工作。E-mail:26789132@qq.com

    通讯作者:

    张永兴,男,1981年生,博士,教授,主要从事隧道与地下工程等方向研究工作。E-mail:zhanguongxing81@aliyun.com

  • 中图分类号: U45

Construction impact of a new mined tunnel undercrossing an overlying stormwater box culvert and an underlying existing tunnel

  • 摘要: 新建地下工程近接既有地下结构的工程类型愈发普遍,严格控制该类新建地下工程施工对既有地下结构的影响是工程建设成功的关键。某地铁站新建换乘通道暗挖隧道穿越上覆雨水箱涵与下卧既有隧道,以该暗挖工程为背景,基于现场实测与三维有限元分析,研究中洞法施工工艺对地表沉降、新建隧道及既有结构物变形的影响规律。研究表明:新建暗挖隧道采用中洞法分层、分块、分区、分段施工,并结合水平旋喷桩超前预加固不良地层,可有效控制地层沉降及结构物变形;中洞法施工的开挖进尺对既有隧道与雨水箱涵变形影响较大,施工中需要严格控制开挖进尺,以减小对既有结构的影响。研究成果可为同类地下工程建设提供借鉴。

     

  • 图  1  新建暗挖隧道布置图

    Figure  1.  Layout plan of newly built underground tunnel

    图  2  工程地质剖面图

    Figure  2.  Engineering geological profile

    图  3  暗挖隧道超前加固与施工工艺

    Figure  3.  Advance reinforcement and construction technology for tunnel

    图  4  暗挖隧道地表及拱顶沉降监测点布置

    Figure  4.  Monitoring points layout for ground surface and tunnel arch settlements

    图  5  数值计算模型

    Figure  5.  Numerical calculation model

    图  6  新建暗挖隧道上方地表沉降

    Figure  6.  Surface subsidence above newly constructed tunnel

    图  7  新建暗挖隧道拱顶沉降

    Figure  7.  Arch settlement of newly constructed tunnel

    图  8  既有隧道与雨水箱涵竖向变形

    Figure  8.  Vertical deformation of tunnel and rainwater tank culverts

    图  9  不同开挖进尺下既有结构物竖向变形曲线

    Figure  9.  Vertical deformation curve of existing structure under different excavation depths

    表  1  主要地层物理力学参数

    Table  1.   Physical parameters of soil

    地层 厚度
    /m
    密度
    /(kg·m−3)
    弹性
    模量
    /MPa
    泊松比 黏聚力
    /kPa
    内摩
    擦角
    /(°)
    素填土 5.0 1800 7 0.35 10 10
    淤泥质黏土②2 5.0 1740 4 0.43 5 3
    粉质黏土③4 1.7 1950 25 0.30 25 25
    粗砂③8 9.1 1960 50 0.26 0 28
    全风化花岗岩⑧1 1.0 2000 80 0.28 28 35
    砂土状强风化
    花岗岩⑧2-1
    14.0 2200 100 0.28 37 45
    下载: 导出CSV
  • [1] 李晓峰, 王炳华, 徐建航, 等. 近距离双孔隧道地表沉降预测与应用[J]. 岩土工程技术, 2025, 39(3): 353-360. (LI X F, WANG B H, XU J H, et al. Surface settlement prediction and application of short-distance twin-bore tunnels[J]. Geotechnical Engineering Technique, 2025, 39(3): 353-360. (in Chinese)

    LI X F, WANG B H, XU J H, et al. Surface settlement prediction and application of short-distance twin-bore tunnels[J]. Geotechnical Engineering Technique, 2025, 39(3): 353-360. (in Chinese)
    [2] 王 睿, 苗龙刚, 章慧健, 等. 砂卵石地层新建通道施工对上覆既有地铁车站的变形影响研究[J]. 现代隧道技术, 2021, 58(6): 129-136,154. (WANG R, MIAO L G, ZHANG H J, et al. Study on influence of new transfer channel construction on deformation of overlying existing metro station in sandy pebble stratum[J]. Modern Tunnelling Technology, 2021, 58(6): 129-136,154. (in Chinese)

    WANG R, MIAO L G, ZHANG H J, et al. Study on influence of new transfer channel construction on deformation of overlying existing metro station in sandy pebble stratum[J]. Modern Tunnelling Technology, 2021, 58(6): 129-136,154. (in Chinese)
    [3] DING Z, ZHANG M B, ZHANG X, et al. Theoretical analysis on the deformation of existing tunnel caused by under-crossing of large-diameter slurry shield considering construction factors[J]. Tunnelling and Underground Space Technology, 2023, 133: 104913. doi: 10.1016/j.tust.2022.104913
    [4] 韩 煊, 王 鑫. 北京地区深基坑工程引起地表沉降规律研究[J]. 建筑科学, 2020, 36(S1): 185-190. (HUAN X, WANG X. Ground surface settlement profiles caused by deep excavation in Beijing[J]. Building Science, 2020, 36(S1): 185-190. (in Chinese)

    HUAN X, WANG X. Ground surface settlement profiles caused by deep excavation in Beijing[J]. Building Science, 2020, 36(S1): 185-190. (in Chinese)
    [5] 丁祖德, 彭立敏, 施成华. 地铁隧道穿越角度对地表建筑物的影响分析[J]. 岩土力学, 2011, 32(11): 3387-3392. (DING Z D, PENG L M, SHI C H. Analysis of influence of metro tunnel crossing angles on ground buildings[J]. Rock and Soil Mechanics, 2011, 32(11): 3387-3392. (in Chinese)

    DING Z D, PENG L M, SHI C H. Analysis of influence of metro tunnel crossing angles on ground buildings[J]. Rock and Soil Mechanics, 2011, 32(11): 3387-3392. (in Chinese)
    [6] 苗晨阳, 黄强兵, 苟玉轩, 等. 地裂缝场地盾构隧道下穿施工对既有管廊的影响研究[J]. 现代隧道技术, 2022, 59(3): 155-165,171. (MIAO C Y, HUANG Q B, GOU Y X, et al. Study on the impact of shield tunnel under-crossing at ground fissure site on existing utility tunnels[J]. Modern Tunnelling Technology, 2022, 59(3): 155-165,171. (in Chinese)

    MIAO C Y, HUANG Q B, GOU Y X, et al. Study on the impact of shield tunnel under-crossing at ground fissure site on existing utility tunnels[J]. Modern Tunnelling Technology, 2022, 59(3): 155-165,171. (in Chinese)
    [7] LIN X T, CHEN R P, WU H N, et al. Deformation behaviors of existing tunnels caused by shield tunneling undercrossing with oblique angle[J]. Tunnelling and Underground Space Technology, 2019, 89: 78-90. doi: 10.1016/j.tust.2019.03.021
    [8] YIN M L, JIANG H, JIANG Y S, et al. Effect of the excavation clearance of an under-crossing shield tunnel on existing shield tunnels[J]. Tunnelling and Underground Space Technology, 2018, 78: 245-258. doi: 10.1016/j.tust.2018.04.034
    [9] 孙武鹏. 明挖深埋隧道下穿施工对高速铁路桥梁的影响[J]. 铁道建筑, 2023, 63(3): 113-117. (SUN W P. Influence of underpass construction of deep-covered tunnel with open-cut method on high speed railway bridge[J]. Railway Engineering, 2023, 63(3): 113-117. (in Chinese) doi: 10.3969/j.issn.1003-1995.2023.03.24

    SUN W P. Influence of underpass construction of deep-covered tunnel with open-cut method on high speed railway bridge[J]. Railway Engineering, 2023, 63(3): 113-117. (in Chinese) doi: 10.3969/j.issn.1003-1995.2023.03.24
    [10] 欧阳鸿志, 朱定桂, 安 斌, 等. 富水砂层盾构隧道下穿独立浅基础铁路桥加固方案比选研究[J]. 现代隧道技术, 2022, 59(5): 246-253. (OUYANG H Z, ZHU D G, AN B, et al. Comparative study on reinforcement schemes for shield tunnel under-crossing railway bridge with isolated shallow foundation in water-rich sand stratum[J]. Modern Tunnelling Technology, 2022, 59(5): 246-253. (in Chinese) doi: 10.13807/j.cnki.mtt.2022.05.030

    OUYANG H Z, ZHU D G, AN B, et al. Comparative study on reinforcement schemes for shield tunnel under-crossing railway bridge with isolated shallow foundation in water-rich sand stratum[J]. Modern Tunnelling Technology, 2022, 59(5): 246-253. (in Chinese) doi: 10.13807/j.cnki.mtt.2022.05.030
    [11] 李清菲. 新建地铁线路下穿既有车站的仿真模拟分析[J]. 隧道建设, 2015, 35(12): 1275-1280. (LI Q F. Numerical simulation for new metro tunnel passing underneath existing metro station[J]. Tunnel Construction, 2015, 35(12): 1275-1280. (in Chinese)

    LI Q F. Numerical simulation for new metro tunnel passing underneath existing metro station[J]. Tunnel Construction, 2015, 35(12): 1275-1280. (in Chinese)
    [12] 万良勇, 宋战平, 曲建生, 等. 新建地铁隧道“零距离”下穿既有车站施工技术分析[J]. 现代隧道技术, 2015, 52(1): 168-176,183. (WAN L Y, SONG Z P, QU J S, et al. Anaysis of construction techniques for a metro tunnel approaching an existing station[J]. Modern Tunnelling Technology, 2015, 52(1): 168-176,183. (in Chinese) doi: 10.13807/j.cnki.mtt.2015.01.024

    WAN L Y, SONG Z P, QU J S, et al. Anaysis of construction techniques for a metro tunnel approaching an existing station[J]. Modern Tunnelling Technology, 2015, 52(1): 168-176,183. (in Chinese) doi: 10.13807/j.cnki.mtt.2015.01.024
    [13] 陈爱青. 多线并行顶管穿越堤防沉降影响分析及应对措施研究[J]. 陕西水利, 2021(6): 19-21,27. (CHEN A Q. Recent progress and outlook of deep learning in the field of hydrological prediction model[J]. Shaanxi Water Resources, 2021(6): 19-21,27. (in Chinese) doi: 10.16747/j.cnki.cn61-1109/tv.2021.06.006

    CHEN A Q. Recent progress and outlook of deep learning in the field of hydrological prediction model[J]. Shaanxi Water Resources, 2021(6): 19-21,27. (in Chinese) doi: 10.16747/j.cnki.cn61-1109/tv.2021.06.006
    [14] 仇文革, 万世付, 高刚刚, 等. 砂卵石地层盾构隧道下穿铁路咽喉区地表沉降控制研究[J]. 现代隧道技术, 2021, 58(5): 37-45. (QIU W G, WAN S F, GAO G G, et al. Study on the control measures against ground settlement induced by shield tunnel construction underneath railway throat in sandy cobble stratum[J]. Modern Tunnelling Technology, 2021, 58(5): 37-45. (in Chinese) doi: 10.13807/j.cnki.mtt.2021.05.005

    QIU W G, WAN S F, GAO G G, et al. Study on the control measures against ground settlement induced by shield tunnel construction underneath railway throat in sandy cobble stratum[J]. Modern Tunnelling Technology, 2021, 58(5): 37-45. (in Chinese) doi: 10.13807/j.cnki.mtt.2021.05.005
    [15] 陈 旺, 彭焱锋, 刘维正, 等. 三孔顶管上穿施工对既有隧道与地表变形影响分析[J]. 现代隧道技术, 2025, 62(1): 170-182. (CHEN W, PENG Y F, LIU W Z, et al. Analysis of the impact of the three pipe jacking over-crossing construction on existing tunnel and surface deformation[J]. Modern Tunnelling Technology, 2025, 62(1): 170-182. (in Chinese)

    CHEN W, PENG Y F, LIU W Z, et al. Analysis of the impact of the three pipe jacking over-crossing construction on existing tunnel and surface deformation[J]. Modern Tunnelling Technology, 2025, 62(1): 170-182. (in Chinese)
    [16] 易 立. 城市新建隧道下穿既有道路影响分区研究[J]. 地下空间与工程学报, 2020, 16(5): 1490-1497. (YI L. Study on the influence zoning of the new urban tunnel under the existing road[J]. Chinese Journal of Underground Space and Engineering, 2020, 16(5): 1490-1497. (in Chinese)

    YI L. Study on the influence zoning of the new urban tunnel under the existing road[J]. Chinese Journal of Underground Space and Engineering, 2020, 16(5): 1490-1497. (in Chinese)
  • 加载中
图(9) / 表(1)
计量
  • 文章访问数:  30
  • HTML全文浏览量:  10
  • PDF下载量:  5
  • 被引次数: 0
出版历程
  • 收稿日期:  2025-06-20
  • 修回日期:  2025-08-19
  • 录用日期:  2025-08-25
  • 网络出版日期:  2026-10-08
  • 刊出日期:  2026-10-08