三孔框构桥下穿高填方铁路路基变形控制研究

冯百喜,  张海行,  周凯,  江益辉,  徐鑫洋,  李浪

冯百喜, 张海行, 周凯, 江益辉, 徐鑫洋, 李浪. 三孔框构桥下穿高填方铁路路基变形控制研究[J]. 岩土工程技术, 2026, 40(5): 717-726. doi: 10.20265/j.cnki.issn.1007-2993.2025-0303
引用本文: 冯百喜, 张海行, 周凯, 江益辉, 徐鑫洋, 李浪. 三孔框构桥下穿高填方铁路路基变形控制研究[J]. 岩土工程技术, 2026, 40(5): 717-726. doi: 10.20265/j.cnki.issn.1007-2993.2025-0303
FENG Baixi, ZHANG Haihang, ZHOU Kai, JIANG Yihui, XU Xinyang, LI Lang. Deformation control of a high-fill railway subgrade undercrossed by a three-span frame bridge[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2026, 40(5): 717-726. doi: 10.20265/j.cnki.issn.1007-2993.2025-0303
Citation: FENG Baixi, ZHANG Haihang, ZHOU Kai, JIANG Yihui, XU Xinyang, LI Lang. Deformation control of a high-fill railway subgrade undercrossed by a three-span frame bridge[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2026, 40(5): 717-726. doi: 10.20265/j.cnki.issn.1007-2993.2025-0303

三孔框构桥下穿高填方铁路路基变形控制研究

doi: 10.20265/j.cnki.issn.1007-2993.2025-0303
基金项目: 江西省自然科学基金(20224BAB214033)
详细信息
    作者简介:

    冯百喜,男,1993年生,大学本科,工程师,研究方向为城市轨道交通。E-mail:2168793115@qq.com

  • 中图分类号: U213.1;TU433

Deformation control of a high-fill railway subgrade undercrossed by a three-span frame bridge

  • 摘要: 下穿既有运营铁路路基建设框构桥会引发既有铁路变形,降低轨道的平顺性,严重时会导致线路运营中断。以深圳市五和站交通疏解道路下穿平南铁路工程为研究背景,建立框构桥下穿既有铁路线路模型,结合现场实测数据分析不同切桩施工顺序下现浇框构桥下穿对上覆既有线的扰动变形,提出了现浇框构箱涵下穿工程的关键控制技术。计算结果表明:在框构桥现浇下穿过程中,各工况对应下的轨道沉降曲线呈对称分布趋势,轨道在支撑桩位置的沉降最小,沉降最大值发生在D梁跨中位置;框构桥跨度的增大导致其范围内铁路轨道水平位移变化增大;进行切桩顺序优化后,SGC10支撑桩位置范围轨道沉降值明显小于原方案轨道沉降值,沉降值减小49%,使得整个下穿范围的既有铁轨沉降及水平位移减小;分阶段切割既有支撑桩,将既有铁路轨道荷载分阶段施加到各框构桥上,进行多次的受力转换,可显著降低既有铁路轨道的沉降,并且提升既有铁路的平顺性。各工况条件下得到的铁路轨道变形与实测结果规律一致,该模型工具可对立交道口下穿过程中既有铁路轨道变形进行预测,并为类似铁路立交道口工程的安全施工提供建设经验。

     

  • 图  1  三孔框构桥平面图(单位:m)

    Figure  1.  Plan of the three-span frame bridge (Unit: m)

    图  2  三孔框构桥立面图(单位:m)

    Figure  2.  Elevation of the three-span frame bridge (Unit: m)

    图  3  MMC模型在主应力空间中的屈服面

    Figure  3.  Yield surface of the MMC model in principal stress space

    图  4  MMC模型三轴试验应力应变关系曲线

    Figure  4.  Stress-strain relationship curve of the MMC model under triaxial test

    图  5  框构桥穿越平南铁路数值计算模型

    Figure  5.  Numerical calculation model of the frame bridge underpassing Pingnan Railway

    图  6  框构桥穿越平南铁路相对位置

    Figure  6.  Relative position of the frame bridge when underpassing Pingnan Railway

    图  7  铁路轨道各关键阶段累计附加沉降变形(单位:m)

    Figure  7.  Cumulative induced settlement deformation of railway track at key stages (Unit: m)

    图  8  铁路轨道各关键阶段累计附加沉降变形

    Figure  8.  Cumulative additional settlement deformation of the railway track at various key stages

    图  9  各工况下轨道高低平顺性变形曲线

    Figure  9.  Track profile deformation curves under various working conditions

    图  10  铁路轨道各关键阶段累计附加水平位移

    Figure  10.  Cumulative additional horizontal displacement of the railway track at various key stages

    图  11  各工况下轨道横向平顺性变形曲线

    Figure  11.  Track alignment deformation curves under various working conditions

    图  12  切桩方案优化前后框构桥下穿既有铁路沉降云图

    Figure  12.  Contour maps of settlement induced by the frame bridge underpassing the existing railway before and after pile-cutting scheme optimization

    图  13  方案优化铁路轨道各关键阶段累计附加沉降变形

    Figure  13.  Cumulative additional settlement deformation of the railway track at various key stages under the optimized scheme

    图  14  方案优化各工况下轨道高低平顺性变形曲线

    Figure  14.  Track profile deformation curves under various working conditions with the optimized scheme

    图  15  铁路轨道各关键阶段累计附加水平位移

    Figure  15.  Cumulative additional horizontal displacement of the railway track at various key stages

    图  16  各工况下轨道横向平顺性变形曲线

    Figure  16.  Track alignment deformation curves under various working conditions

    图  17  实测与数值模拟优化前后最终沉降位移对比

    Figure  17.  Comparison of final settlement displacement between field measurements and numerical simulations before and after optimization

    表  1  轨道静态几何尺寸容许偏差管理值

    Table  1.   Allowable deviation management values for track static geometry parameters

    项目作业验收计划维修临时补修限速(45 km·h−1)
    高低/mm461922
    水平/mm461720
    轨矩/mm+6+7+16+19
    −2−4−8−9
    下载: 导出CSV

    表  2  土体物理力学参数指标

    Table  2.   Physical and mechanical parameters of soil

    土层 土层厚度 /m 重度 /(kN·m−3) $ \mathrm{\mathit{E}}_{50}^{\text{ref}} $/MPa $ \mathit{\mathit{\mathrm{\mathit{E}}}}_{\text{oed}}^{\text{ref}} $/MPa $ \mathit{\mathrm{\mathit{E}}}_{\text{ur}}^{\text{ref}} $/MPa 黏聚力/kPa 内摩擦角/(°) 渗透系数/(m·d−1)
    素填土 3 17.1 2.7 2.7 8.1 12.0 10.0 0.5
    砾质黏性土 5.7 17.58 5.0 5.0 15 26.0 24.0 0.8
    全风化花岗岩 2.3 17.89 10 10 30 28.0 26.5 0.5
    强风化花岗岩 31.8 18.74 15 15 45 32.0 28.5 0.5
    微风化花岗岩 43.7 26.50 250.0 250.0 1250 2000 40.0 0.3
    下载: 导出CSV

    表  3  模型中结构的物理力学参数

    Table  3.   Physical and mechanical parameters of the structure in the model

    项目重度/(kN·m−3)弹性模量
    /MPa
    泊松比
    框构25.03.25×1040.2
    铁路路基17.02.50×1040.2
    D梁支撑桩25.03.35×1040.3
    防护桩25.03.35×1040.3
    钢材78.52.00×1050.3
    下载: 导出CSV

    表  4  施工阶段计算

    Table  4.   Calculation of construction stages

    工序说明
    工序1初始地应力平衡阶段
    工序2施作D梁支撑桩及路基防护桩
    工序3施作D梁纵向支撑梁
    工序4放坡开挖中间孔框构基坑
    工序5浇筑中间孔框构桥下素混凝土桩及框构桥主体
    工序6放坡开挖两侧孔框构基坑
    工序7浇筑两侧孔框构桥下素混凝土桩及框构桥主体
    工序8框构两侧回填
    工序9对框构顶部进行回填并切除框构
    桥内支撑桩
    下载: 导出CSV
  • [1] 吴程程. 大跨度箱涵斜交下穿铁路轨道变形控制及安全施工技术研究[D]. 北京: 北京交通大学, 2023. (WU C C. Research on deformation control and safe construction technology of long-span box culvert diagonal crossing railway trac[D]. Beijing: Beijing Jiaotong University, 2023. (in Chinese)

    WU C C. Research on deformation control and safe construction technology of long-span box culvert diagonal crossing railway trac[D]. Beijing: Beijing Jiaotong University, 2023. (in Chinese)
    [2] 赖艺鹏, 韩 语, 郭帅杰, 等. 框架桥下穿既有线有砟轨道结构动力响应分析[J]. 铁道科学与工程学报, 2025, 22(12): 5314-5327. (LAI Y P, HAN Y, GUO S J, et al. Analysis of the dynamic response of the existing line ballasted track structure under the frame bridge[J]. Journal of Railway Science and Engineering, 2025, 22(12): 5314-5327. (in Chinese) doi: 10.19713/j.cnki.43-1423/u.T20250287

    LAI Y P, HAN Y, GUO S J, et al. Analysis of the dynamic response of the existing line ballasted track structure under the frame bridge[J]. Journal of Railway Science and Engineering, 2025, 22(12): 5314-5327. (in Chinese) doi: 10.19713/j.cnki.43-1423/u.T20250287
    [3] 王 鹏, 陈晓静. 复杂环境下铁路下穿立交施工关键技术研究[J]. 铁道工务, 2024, 2(6): 64-67. (WANG P, CHEN X J. Research on key construction technologies of railway underpass interchange in complex environment[J]. Railway Maintenance, 2024, 2(6): 64-67. (in Chinese)

    WANG P, CHEN X J. Research on key construction technologies of railway underpass interchange in complex environment[J]. Railway Maintenance, 2024, 2(6): 64-67. (in Chinese)
    [4] PECK R B. Deep excavation and tunneling in soft ground[C]//Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering. Mexico, 1969.
    [5] LOGANATHAN N, POULOS H G. Analytical prediction for tunneling-induced ground movements in clays[J]. Journal of Geotechnical and Geoenvironmental Engineering, 1998, 124(9): 846-856. doi: 10.1061/(ASCE)1090-0241(1998)124:9(846)
    [6] 覃卫民, 楚 斌, 龙立志. 大断面箱涵下穿高速公路过程的施工监测分析[J]. 岩石力学与工程学报, 2009, 28(9): 1790-1797. (QIN W M, CHU B, LONG L Z. Analysis of construction monitoring of large-section box culvert jacking process underpass expressway[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(9): 1790-1797. (in Chinese) doi: 10.3321/j.issn:1000-6915.2009.09.008

    QIN W M, CHU B, LONG L Z. Analysis of construction monitoring of large-section box culvert jacking process underpass expressway[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(9): 1790-1797. (in Chinese) doi: 10.3321/j.issn:1000-6915.2009.09.008
    [7] 林强强. 矩形顶管引起地面变形的实测分析与控制研究[D]. 上海: 同济大学, 2008. (LIN Q Q. Analysis and control of the surface deformation caused by rectangular pipe jacking construction[D]. Shanghai: Tongji University, 2008. (in Chinese)

    LIN Q Q. Analysis and control of the surface deformation caused by rectangular pipe jacking construction[D]. Shanghai: Tongji University, 2008. (in Chinese)
    [8] 朱正国, 李兵兵, 李文江, 等. 新建铁路隧道下穿既有铁路施工引起的地表沉降控制标准研究[J]. 中国铁道科学, 2011, 32(5): 78-82. (ZHU Z G, LI B B, LI W J, et al. Study on ground surface settlement control standard induced by construction of new-built railway tunnel under-passing existing railway[J]. China Railway Science, 2011, 32(5): 78-82. (in Chinese)

    ZHU Z G, LI B B, LI W J, et al. Study on ground surface settlement control standard induced by construction of new-built railway tunnel under-passing existing railway[J]. China Railway Science, 2011, 32(5): 78-82. (in Chinese)
    [9] 王道远, 袁金秀, 朱永全, 等. 铁路隧道下穿既有专线地表沉降控制基准研究[J]. 地下空间与工程学报, 2013, 9(S2): 1945-1950. (WANG D Y, YUAN J X, ZHU Y Q, et al. Study on surface settlement control criterion of railway tunnel crossing under the existing railway line[J]. Chinese Journal of Underground Space and Engineering, 2013, 9(S2): 1945-1950. (in Chinese) doi: 10.20174/j.juse.2013.s2.027

    WANG D Y, YUAN J X, ZHU Y Q, et al. Study on surface settlement control criterion of railway tunnel crossing under the existing railway line[J]. Chinese Journal of Underground Space and Engineering, 2013, 9(S2): 1945-1950. (in Chinese) doi: 10.20174/j.juse.2013.s2.027
    [10] 张 超. 下穿铁路斜交框架桥受力分析[J]. 黑龙江交通科技, 2016, 39(11): 80-81. (ZHANG C. Mechanical analysis of skew frame bridge underpassing railway[J]. Communications Science and Technology Heilongjiang, 2016, 39(11): 80-81. (in Chinese)

    ZHANG C. Mechanical analysis of skew frame bridge underpassing railway[J]. Communications Science and Technology Heilongjiang, 2016, 39(11): 80-81. (in Chinese)
    [11] 陈 力, 刁心宏, 杨守兴, 等. 框架桥下穿既有铁路路基沉降控制标准研究[J]. 现代隧道技术, 2019, 56(2): 111-118. (CHEN L, DIAO X H, YANG S X, et al. Research on subgrade settlement control criterion for a frame bridge passing underneath a existing railway[J]. Modern Tunnelling Technology, 2019, 56(2): 111-118. (in Chinese)

    CHEN L, DIAO X H, YANG S X, et al. Research on subgrade settlement control criterion for a frame bridge passing underneath a existing railway[J]. Modern Tunnelling Technology, 2019, 56(2): 111-118. (in Chinese)
    [12] 岳仁辉, 马 野, 黄从俊, 等. 矩形箱涵下穿公路引起路面沉降控制基准研究[J]. 公路, 2023, 68(6): 204-209. (YUE R H, MA Y, HUANG C J, et al. Research on control benchmark for pavement settlement induced by rectangular box culvert underpassing highway[J]. Highway, 2023, 68(6): 204-209. (in Chinese)

    YUE R H, MA Y, HUANG C J, et al. Research on control benchmark for pavement settlement induced by rectangular box culvert underpassing highway[J]. Highway, 2023, 68(6): 204-209. (in Chinese)
    [13] 石文阳. 下穿运营铁路大断面框构箱涵施工稳定性研究[D]. 西安: 西安建筑科技大学, 2021. (SHI W Y. Study on construction stability of large section box culvert under running railway[D]. Xi’an: Xi’an University of Architecture and Technology, 2021. (in Chinese)

    SHI W Y. Study on construction stability of large section box culvert under running railway[D]. Xi’an: Xi’an University of Architecture and Technology, 2021. (in Chinese)
    [14] 尚培培. 双孔框构桥下穿重载铁路顶进施工条件下线路加固技术研究[J]. 铁道建筑, 2021, 61(4): 39-43. (SHANG P P. Study on railway reinforcement technology of double-span frame bridge undercrossing heavy haul railway during jacking construction[J]. Railway Engineering, 2021, 61(4): 39-43. (in Chinese)

    SHANG P P. Study on railway reinforcement technology of double-span frame bridge undercrossing heavy haul railway during jacking construction[J]. Railway Engineering, 2021, 61(4): 39-43. (in Chinese)
    [15] 巨高权, 邱玉兴, 杨 毅. 下穿营业线重载铁路框构桥顶进及线路加固施工关键技术研究[J]. 建筑机械, 2025(4): 259-264. (JU G Q, QIU Y X, YANG Y. Research on key technologies for top entry and line reinforcement construction of heavy duty railway frame bridges underpassing business lines[J]. Construction Machinery, 2025(4): 259-264. (in Chinese)

    JU G Q, QIU Y X, YANG Y. Research on key technologies for top entry and line reinforcement construction of heavy duty railway frame bridges underpassing business lines[J]. Construction Machinery, 2025(4): 259-264. (in Chinese)
    [16] 中国铁路总公司. 普速铁路线路修理规则[M]. 北京: 中国铁道出版社有限公司, 2019. (China Railway Corporation. Rules for maintenance of conventional speed railway lines[M]. Beijing: China Railway Publishing House Co., Ltd., 2019. (in Chinese)

    China Railway Corporation. Rules for maintenance of conventional speed railway lines[M]. Beijing: China Railway Publishing House Co., Ltd., 2019. (in Chinese)
    [17] 中华人民共和国住房和城乡建设部. 城市轨道交通工程监测技术规范: GB 50911—2013[M]. 北京: 中国建筑工业出版社, 2014. (Ministry of Housing and Urban-Rural Development of the People’s Republic of China. Code for monitoring measurement of urban rail transit engineering: GB 50911—2013[M]. Beijing: China Architecture & Building Press, 2014. (in Chinese)

    Ministry of Housing and Urban-Rural Development of the People’s Republic of China. Code for monitoring measurement of urban rail transit engineering: GB 50911—2013[M]. Beijing: China Architecture & Building Press, 2014. (in Chinese)
    [18] 朱 旻, 陈湘生, 张国涛, 等. 花岗岩残积土硬化土模型参数反演及工程应用[J]. 岩土力学, 2022, 43(4): 1061-1072. (ZHU M, CHEN X S, ZHANG G T, et al. Parameter back-analysis of hardening soil model for granite residual soil and its engineering applications[J]. Rock and Soil Mechanics, 2022, 43(4): 1061-1072. (in Chinese (in Chinese)

    ZHU M, CHEN X S, ZHANG G T, et al. Parameter back-analysis of hardening soil model for granite residual soil and its engineering applications[J]. Rock and Soil Mechanics, 2022, 43(4): 1061-1072. (in Chinese
    [19] 国家铁路局. 铁路桥涵设计规范: TB 10002—2017[S]. 北京: 中国铁道出版社, 2017. (National Railway Administration. Code for design on railway bridge and culvert: TB 10002—2017[S]. Beijing: China Railway Press, 2017. (in Chinese)

    National Railway Administration. Code for design on railway bridge and culvert: TB 10002—2017[S]. Beijing: China Railway Press, 2017. (in Chinese)
  • 加载中
图(17) / 表(4)
计量
  • 文章访问数:  26
  • HTML全文浏览量:  20
  • PDF下载量:  3
  • 被引次数: 0
出版历程
  • 收稿日期:  2025-07-11
  • 修回日期:  2025-09-27
  • 录用日期:  2026-01-08
  • 网络出版日期:  2026-10-08
  • 刊出日期:  2026-10-08