| Citation: | Ma Xuejun, Yu Hang, Wang Tao, Chen Lei, Lan Penghui. Load variation characteristics of cutterhead load during shield disc cutter cutting a reinforced concrete diaphragm wall[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2025, 39(6): 889-897. doi: 10.20265/j.cnki.issn.1007-2993.2024-0195 |
| [1] |
李宏波. 盾构直接切削φ25 mm主筋钢筋混凝土桩基可行性研究[J]. 隧道建设(中英文), 2020, 40(12): 1808-1816. (LI H B. Feasibility study on direct cutting of reinforced concrete pile foundation with φ25 mm main reinforced bar by shield[J]. Tunnel Construction, 2020, 40(12): 1808-1816. (in Chinese)
LI H B. Feasibility study on direct cutting of reinforced concrete pile foundation with φ25 mm main reinforced bar by shield[J]. Tunnel Construction, 2020, 40(12): 1808-1816. (in Chinese)
|
| [2] |
WU G J, JIA S P, CHEN W Z, et al. Modelling analysis of the influence of shield crossing on deformation and force in a large diaphragm wall[J]. Tunnelling and Underground Space Technology, 2018, 72: 154-161. doi: 10.1016/j.tust.2017.11.028
|
| [3] |
TEALE R. The concept of specific energy in rock drilling[J]. International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 1965, 2(1): 57-73.
|
| [4] |
ROSTAMI J. Design optimization, performance prediction and economic analysis of tunnel boring machines for the construction of the proposed yucca mountain nuclear waste repository[D]. Golden: Colorado School of Mines, 1992.
|
| [5] |
许 宇, 李兴高, 杨 益, 等. 盾构切刀切削混凝土过程中的动态响应试验[J]. 哈尔滨工业大学学报, 2021, 53(5): 182-189. (XU Y, LI X G, YANG Y, et al. Dynamic response mechanism of shield cutter in concrete cutting[J]. Journal of Harbin Institute of Technology, 2021, 53(5): 182-189. (in Chinese) doi: 10.11918/201905250
XU Y, LI X G, YANG Y, et al. Dynamic response mechanism of shield cutter in concrete cutting[J]. Journal of Harbin Institute of Technology, 2021, 53(5): 182-189. (in Chinese) doi: 10.11918/201905250
|
| [6] |
许华国, 陈 馈, 孙振川. 盾构刀盘切削钢筋混凝土桩基室内试验研究[J]. 隧道建设(中英文), 2020, 40(1): 35-42. (XU H G, CHEN K, SUN Z H. Laboratory test of reinforced concrete pile foundation cutting by shield cutterhead[J]. Tunnel Construction, 2020, 40(1): 35-42. (in Chinese)
XU H G, CHEN K, SUN Z H. Laboratory test of reinforced concrete pile foundation cutting by shield cutterhead[J]. Tunnel Construction, 2020, 40(1): 35-42. (in Chinese)
|
| [7] |
HUANG R, HU J, PAN J B, et al. The Π-formed diaphragm wall construction for departure and reception of shield machine[J]. Sustainability, 2022, 14(13): 7653. doi: 10.3390/su14137653
|
| [8] |
YU H, CHEN L, PENG K X. Adaptability of a reinforced concrete diaphragm wall cut by disc cutter[J]. Sustainability, 2022, 14(23): 16154. doi: 10.3390/su142316154
|
| [9] |
KRAUSE H. Geologische erfahrungen beim einsatz von tunnelvortriebsmaschinen in baden-württemberg[C]//Proceedings of the Vorträge Des 24 on Neue Erkenntnisse im Hohlraumbau — Fundierungen im Fels / Latest Findings in the Construction of Underground Excavations-Rock Foundations. Vienna: Springer, 1976: 49-60.
|
| [10] |
卢 浩, 王明洋, 夏沅谱, 等. 土压平衡盾构刀盘扭矩计算模型[J]. 浙江大学学报(工学版), 2014, 48(9): 1640-1645. (LU H, WANG M Y, XIA Y P, et al. Calculation model of cutterhead torque for earth pressure balance shield[J]. Journal of Zhejiang University (Engineering Science), 2014, 48(9): 1640-1645. (in Chinese)
LU H, WANG M Y, XIA Y P, et al. Calculation model of cutterhead torque for earth pressure balance shield[J]. Journal of Zhejiang University (Engineering Science), 2014, 48(9): 1640-1645. (in Chinese)
|
| [11] |
赵海雷, 孙振川, 张 兵, 等. 基于CSM改进模型的TBM刀盘关键参数相关性研究[J]. 隧道建设(中英文), 2020, 40(S1): 169-178. (ZHAO H L, SUN Z C, ZHANG B, et al. Research on correlation of key parameters of TBM cutter head based on improved CSM model[J]. Tunnel Construction, 2020, 40(S1): 169-178. (in Chinese)
ZHAO H L, SUN Z C, ZHANG B, et al. Research on correlation of key parameters of TBM cutter head based on improved CSM model[J]. Tunnel Construction, 2020, 40(S1): 169-178. (in Chinese)
|
| [12] |
杨振兴, 曾垂刚, 张 凯, 等. 软硬不均地层对盾构刀盘受力计算方法与分析[J]. 科学技术与工程, 2022, 22(25): 11163-11169. (YANG Z X, ZENG C G, ZHANG K, et al. Calculation method and engineering application of force on shield cutter disk for soft and hard composite stratum[J]. Science Technology and Engineering, 2022, 22(25): 11163-11169. (in Chinese) doi: 10.3969/j.issn.1671-1815.2022.25.043
YANG Z X, ZENG C G, ZHANG K, et al. Calculation method and engineering application of force on shield cutter disk for soft and hard composite stratum[J]. Science Technology and Engineering, 2022, 22(25): 11163-11169. (in Chinese) doi: 10.3969/j.issn.1671-1815.2022.25.043
|
| [13] |
吴起星, 安关峰, 周小文, 等. 软硬复合地层中盾构掘进刀盘受力分析与计算[J]. 土木工程学报, 2015, 48(S2): 321-326. (WU Q X, AN G F, ZHOU X W, et al. Cutterhead mechanics analysis of shield tunneling in soft and hard complex stratum[J]. China Civil Engineering Journal, 2015, 48(S2): 321-326. (in Chinese)
WU Q X, AN G F, ZHOU X W, et al. Cutterhead mechanics analysis of shield tunneling in soft and hard complex stratum[J]. China Civil Engineering Journal, 2015, 48(S2): 321-326. (in Chinese)
|
| [14] |
杜 欣, 黄雪梅, 郝 岩, 等. 盾构切削混凝土桥桩刀盘荷载分析[J]. 地下空间与工程学报, 2021, 17(6): 1742-1750. (DU X, HUANG X M, HAO Y, et al. Analysis on cutterhead load in shield cutting concrete bridge pile[J]. Chinese Journal of Underground Space and Engineering, 2021, 17(6): 1742-1750. (in Chinese) doi: 10.3969/j.issn.1673-0836.2021.6.dxkj202106007
DU X, HUANG X M, HAO Y, et al. Analysis on cutterhead load in shield cutting concrete bridge pile[J]. Chinese Journal of Underground Space and Engineering, 2021, 17(6): 1742-1750. (in Chinese) doi: 10.3969/j.issn.1673-0836.2021.6.dxkj202106007
|