Suitability of highway bridge foundation in karst breccia canyon slope

doi: 10.20265/j.cnki.issn.1007-2993.2024-0430
  • Received Date: 2024-09-18
  • Accepted Date: 2025-04-09
  • Rev Recd Date: 2025-03-05
  • Publish Date: 2025-10-10
  • Karst breccia is a special type of sedimentary rock with a unique diagenetic environment and characteristics. Especially the karst breccia located on the slope of the canyon bank, under favorable groundwater discharge conditions, the later karst process will further deteriorate the mechanical properties of the rock mass and affect the stability of the foundation and the overall stability of the bank slope. Therefore, the suitability evaluation of the foundation of canyon bank slope composed of karst breccia for super large bridges is particularly crucial and important, which determines the type and scale of bridge structure based on this in engineering construction. This article takes the bank slope of the Lishui Grand Bridge Canyon on the Zhangjiajie Huayuan Expressway as the engineering background, and the structural characteristics and karst development characteristics of karst breccia have been revealed through adits and drilling surveys. Through overall slope reliability analysis, it has been demonstrated that the probability of deformation and failure of the bank slope under design loads exceeds 20%. According to a comprehensive engineering geological analysis, the karst breccia on the Zhangjiajie shore is not suitable as the foundation for the suspension bridge tower. Thus, a geological decision was made to adjust the cable bent tower to a dolomite conglomerate with better mechanical properties. This research has ensured the completion and opening of the Lishui Extra Large Bridge and provided new important references for the survey and design of super large bridges crossing canyons.

     

  • loading
  • [1]
    YIN X S, XIE L M, XIAO D Y, et al. Engineering properties and slope failure mode of Karst Breccia[J]. IOP Conference Series: Earth and Environmental Science, 2018, 189: 022046. doi: 10.1088/1755-1315/189/2/022046
    [2]
    谢礼明, 张少锋, 殷先松, 等. 乌江某电站岩溶角砾岩发育特征及对工程的影响[J]. 资源环境与工程, 2008, 22(S1): 43-46. (XIE L M, ZHANG S F, YIN X S, et al. Development characteristics of karst breccia in a power station of Wujiang River and its engineering influence[J]. Resources Environment & Engineering, 2008, 22(S1): 43-46. (in Chinese)

    XIE L M, ZHANG S F, YIN X S, et al. Development characteristics of karst breccia in a power station of Wujiang River and its engineering influence[J]. Resources Environment & Engineering, 2008, 22(S1): 43-46. (in Chinese)
    [3]
    张文勇, 李 阳. 岩溶角砾岩成因及工程影响研究[J]. 北方交通, 2023(12): 8-12. (ZHANG W Y, LI Y. Research on reasons for karst breccia and engineering impact[J]. Northern Communications, 2023(12): 8-12. (in Chinese)

    ZHANG W Y, LI Y. Research on reasons for karst breccia and engineering impact[J]. Northern Communications, 2023(12): 8-12. (in Chinese)
    [4]
    高 健, 陈 浩, 邱志刚, 等. 三峡库区某滑坡岩溶角砾岩特征及成因分析[J]. 资源环境与工程, 2022, 36(1): 43-48. (GAO J, CHEN H, QIU Z G, et al. Characteristics and genesis of karst breccia in a landslide in Three Gorges Reservoir area[J]. Resources Environment & Engineering, 2022, 36(1): 43-48. (in Chinese)

    GAO J, CHEN H, QIU Z G, et al. Characteristics and genesis of karst breccia in a landslide in Three Gorges Reservoir area[J]. Resources Environment & Engineering, 2022, 36(1): 43-48. (in Chinese)
    [5]
    郭喜峰, 吴相超, 熊诗湖. 岩溶角砾岩物理力学特性现场试验研究[J]. 哈尔滨工程大学学报, 2022, 43(10): 1447-1453. (GUO X F, WU X C, XIONG S H. Field test study on the physical and mechanical characteristics of karst breccia[J]. Journal of Harbin Engineering University, 2022, 43(10): 1447-1453. (in Chinese) doi: 10.11990/jheu.202108041

    GUO X F, WU X C, XIONG S H. Field test study on the physical and mechanical characteristics of karst breccia[J]. Journal of Harbin Engineering University, 2022, 43(10): 1447-1453. (in Chinese) doi: 10.11990/jheu.202108041
    [6]
    王增银, 沈继方, 万军伟. 清江高坝洲地区古岩溶角砾岩特征及形成条件[J]. 地球科学-中国地质大学学报, 1998, 23(5): 524-528,536. (WANG Z Y, SHEN J F, WAN J W. An analysis of the formation of paleokarst breccia and the karst evolution in Gaobazhou area of Qingjiang River[J]. Earth Science-Journal of China University of Geosciences, 1998, 23(5): 524-528,536 (in Chinese)

    WANG Z Y, SHEN J F, WAN J W. An analysis of the formation of paleokarst breccia and the karst evolution in Gaobazhou area of Qingjiang River[J]. Earth Science-Journal of China University of Geosciences, 1998, 23(5): 524-528,536 (in Chinese)
    [7]
    袁 斌. 溶塌角砾岩浅埋地段施工技术[J]. 智能城市, 2021(10): 161-162. (YUAN B. Construction technology for shallow buried karst collapse breccia sections[J]. Intelligent City, 2021(10): 161-162. (in Chinese)

    YUAN B. Construction technology for shallow buried karst collapse breccia sections[J]. Intelligent City, 2021(10): 161-162. (in Chinese)
    [8]
    谭志希, 郭 毅, 夏云东. 夹岩水利枢纽工程溶塌角砾岩隧洞涌水塌方处置浅析[J]. 水利水电快报, 2019, 40(6): 63-64,70. (TAN Z X, GUO Y, XIA Y D. Analysis on treatment of water gushing and collapse in karst collapse breccia tunnel of Jiayan Water Control Project[J]. Express Water Resources & Hydropower Information, 2019, 40(6): 63-64,70. (in Chinese)

    TAN Z X, GUO Y, XIA Y D. Analysis on treatment of water gushing and collapse in karst collapse breccia tunnel of Jiayan Water Control Project[J]. Express Water Resources & Hydropower Information, 2019, 40(6): 63-64,70.
    [9]
    邓万平. 凉水湾大桥岩溶角砾岩地层的钻孔桩施工[J]. 路基工程, 2006(1): 108-110. (DENG W P. Board pile construction in karst breccia stratum for Liangshuiwan major bridge[J]. Subgrade Engineering, 2006(1): 108-110. (in Chinese) doi: 10.3969/j.issn.1003-8825.2006.01.041

    DENG W P. Board pile construction in karst breccia stratum for Liangshuiwan major bridge[J]. Subgrade Engineering, 2006(1): 108-110. (in Chinese) doi: 10.3969/j.issn.1003-8825.2006.01.041
    [10]
    王青松, 任少强, 冯军武, 等. 岗乌隧道岩溶角砾岩段大变形控制技术[J]. 中国铁路, 2023(8): 24-32. (WANG Q S, REN S Q, FENG J W, et al. Large deformation control technology of karst breccia section in Gangwu tunnel[J]. China Railway, 2023(8): 24-32. (in Chinese)

    WANG Q S, REN S Q, FENG J W, et al. Large deformation control technology of karst breccia section in Gangwu tunnel[J]. China Railway, 2023(8): 24-32. (in Chinese)
    [11]
    袁道先, 蒋勇军, 沈立成, 等. 现代岩溶学[M]. 北京: 科学出版社, 2016: 3. (YUAN D X, JIANG Y J, SHEN L C, et al. Modern karstology[M]. Beijing: Science Press, 2016: 3. (in Chinese)

    YUAN D X, JIANG Y J, SHEN L C, et al. Modern karstology[M]. Beijing: Science Press, 2016: 3. (in Chinese)
    [12]
    王光进, 袁利伟, 孔祥云, 等. 边坡工程稳定与不确定性分析Slide程序的应用[M]. 北京: 冶金工业出版社, 2015: 3. (WANG G J, YUAN L W, KONG X Y, et al. Application of Slide program for stability and uncertainty analysis of slope engineering[M]. Beijing: Metallurgical Industry Press, 2015: 3. (in Chinese)

    WANG G J, YUAN L W, KONG X Y, et al. Application of Slide program for stability and uncertainty analysis of slope engineering[M]. Beijing: Metallurgical Industry Press, 2015: 3. (in Chinese)
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(13)  / Tables(2)

    Article Metrics

    Article views (15) PDF downloads(3) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return