LI Quanfeng, WANG Xueting. High-efficiency construction technology of long auger drills in sandy gravel strata[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2026, 40(1): 43-47. doi: 10.20265/j.cnki.issn.1007-2993.2024-0441
Citation: LI Quanfeng, WANG Xueting. High-efficiency construction technology of long auger drills in sandy gravel strata[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2026, 40(1): 43-47. doi: 10.20265/j.cnki.issn.1007-2993.2024-0441

High-efficiency construction technology of long auger drills in sandy gravel strata

doi: 10.20265/j.cnki.issn.1007-2993.2024-0441
  • Received Date: 2024-09-26
  • Accepted Date: 2025-03-06
  • Rev Recd Date: 2024-12-28
  • Publish Date: 2026-02-06
  • The construction difficulties of conventional long auger drills in sandy gravel strata are mainly manifested as drill sticking, drill burying and severe mechanical wear. To address these problems, a series of improvements were made to the drilling tools and drilling operations of long auger drills, mainly including the following aspects: enhancing the torque of the power head of long auger drills to enable drilling in sandy gravel strata containing large-sized boulders; adding the reverse rotation function to the power head to allow independent adjustment after drill sticking or burying; strengthening relevant components such as drilling tools (drill pipes, alloy cutting bits, variable diameters, etc.), front and rear backplanes (including slips), casings and screws to make them adapt to the construction intensity; adjusting construction parameters such as rotational speed and footage speed according to actual conditions during drilling to achieve the effect of one-time hole and pile formation. Through practical tests, 5 sets of modified configurations of long auger drills suitable for construction in different sandy gravel strata were proposed, which can provide a reference for engineering applications.

     

  • loading
  • [1]
    王英坡. 复杂地层中钻孔灌注桩的施工方法[J]. 中国煤炭地质, 2018, 30(12): 79-81,95. (WANG Y P. Bored pile construction in complex strata[J]. Coal Geology of China, 2018, 30(12): 79-81,95. (in Chinese)

    WANG Y P. Bored pile construction in complex strata[J]. Coal Geology of China, 2018, 30(12): 79-81,95. (in Chinese)
    [2]
    赵 涛, 梁庆国, 艾胜军, 等. 砂卵石地层深基坑开挖数值模拟研究[J]. 兰州交通大学学报, 2021, 40(1): 6-12. (ZHAO T, LIANG Q G, AI S J, et al. Study on numerical simulation of deep foundation pit excavation in sandy cobble stratum[J]. Journal of Lanzhou Jiaotong University, 2021, 40(1): 6-12. (in Chinese)

    ZHAO T, LIANG Q G, AI S J, et al. Study on numerical simulation of deep foundation pit excavation in sandy cobble stratum[J]. Journal of Lanzhou Jiaotong University, 2021, 40(1): 6-12. (in Chinese)
    [3]
    袁亚朋, 盛春波, 高来彬, 等. 长螺旋钻孔压灌桩施工技术在支护工程中的应用[J]. 工程建设与设计, 2024(21): 169-171. (YUAN Y P, SHENG C B, GAO L B, et al. Application of construction technology of long auger borehole pressure pile in support engineering[J]. Construction & Design for Engineering, 2024(21): 169-171. (in Chinese)

    YUAN Y P, SHENG C B, GAO L B, et al. Application of construction technology of long auger borehole pressure pile in support engineering[J]. Construction & Design for Engineering, 2024(21): 169-171. (in Chinese)
    [4]
    袁艳斌, 张新化. 长螺旋钻孔压灌桩技术在砂层地质深基坑支护工程中的应用——以郑州某地下停车场项目深基坑支护工程为例[J]. 工程技术研究, 2022, 7(21): 4-6. (YUAN Y B, ZHANG X H. The application of long spiral drilling pressure grouting pile technology in deep foundation pit support engineering in sandy stratum——taking the deep foundation pit support project of an underground parking lot in Zhengzhou as an example[J]. Engineering and Technological Research, 2022, 7(21): 4-6. (in Chinese)

    YUAN Y B, ZHANG X H. The application of long spiral drilling pressure grouting pile technology in deep foundation pit support engineering in sandy stratum——taking the deep foundation pit support project of an underground parking lot in Zhengzhou as an example[J]. Engineering and Technological Research, 2022, 7(21): 4-6. (in Chinese)
    [5]
    张 鼎, 常子璇, 杜亚旭. 长螺旋钻孔压灌桩技术在大卵石地层中的应用[J]. 城市建筑空间, 2022, 29(S2): 901-902. (ZHANG D, CHANG Z X, DU Y X. Application of long spiral drilled pressure pile technology in boulder strata[J]. Urban Architecture Space, 2022, 29(S2): 901-902. (in Chinese)

    ZHANG D, CHANG Z X, DU Y X. Application of long spiral drilled pressure pile technology in boulder strata[J]. Urban Architecture Space, 2022, 29(S2): 901-902. (in Chinese)
    [6]
    蓝文浩. 干性砂卵石层灌注桩施工工艺研究[J]. 西部探矿工程, 2022, 34(8): 30-32. (LAN W H. Research on construction technology of cast-in-place piles in dry sand and gravel layer[J]. West-China Exploration Engineering, 2022, 34(8): 30-32. (in Chinese)

    LAN W H. Research on construction technology of cast-in-place piles in dry sand and gravel layer[J]. West-China Exploration Engineering, 2022, 34(8): 30-32. (in Chinese)
    [7]
    杨 松, 王力生, 刘登明, 等. 长螺旋置换与挤密钻孔工艺在北京地区砂卵石层中的应用[J]. 工业建筑, 2007, 37(4): 6-8,18. (YANG S, WANG L S, LIU D M, et al. Application of replaced and compacted drilling technology of Longhelix driller in sand cobble layer in Beijing[J]. Industrial Construction, 2007, 37(4): 6-8,18. (in Chinese)

    YANG S, WANG L S, LIU D M, et al. Application of replaced and compacted drilling technology of Longhelix driller in sand cobble layer in Beijing[J]. Industrial Construction, 2007, 37(4): 6-8,18. (in Chinese)
    [8]
    倪晓荣, 李哲琳, 王 勇. 长螺旋钻孔二次压灌混凝土成桩工艺在干性砂卵石地层中的应用[J]. 施工技术, 2015, 44(S2): 134-136. (NI X R, LI Z L, WANG Y. Application of auger drilling secondary pressure fed technology into concrete piles in dry sand and gravel formations[J]. Construction Technology, 2015, 44(S2): 134-136. (in Chinese)

    NI X R, LI Z L, WANG Y. Application of auger drilling secondary pressure fed technology into concrete piles in dry sand and gravel formations[J]. Construction Technology, 2015, 44(S2): 134-136. (in Chinese)
    [9]
    张 军. 大粒径卵石层条件下长螺旋改进型钻孔灌注桩成孔施工技术研究[J]. 价值工程, 2019, 38(2): 129-133. (ZHANG J. Study on hole forming construction technology of long spiral improved bored pile under large particle size pebble layer[J]. Value Engineering, 2019, 38(2): 129-133. (in Chinese)

    ZHANG J. Study on hole forming construction technology of long spiral improved bored pile under large particle size pebble layer[J]. Value Engineering, 2019, 38(2): 129-133. (in Chinese)
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(5)  / Tables(1)

    Article Metrics

    Article views (27) PDF downloads(15) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return