ZHU Jun, HUO Chang, XUE Mingsheng, YANG Ping, WANG Jiahui. Construction and deformation measurement of shield tunnels adjacent to existing operating lines[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2026, 40(1): 91-100. doi: 10.20265/j.cnki.issn.1007-2993.2024-0610
Citation: ZHU Jun, HUO Chang, XUE Mingsheng, YANG Ping, WANG Jiahui. Construction and deformation measurement of shield tunnels adjacent to existing operating lines[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2026, 40(1): 91-100. doi: 10.20265/j.cnki.issn.1007-2993.2024-0610

Construction and deformation measurement of shield tunnels adjacent to existing operating lines

doi: 10.20265/j.cnki.issn.1007-2993.2024-0610
  • Received Date: 2024-12-27
  • Accepted Date: 2025-04-09
  • Rev Recd Date: 2025-02-25
  • Publish Date: 2026-02-06
  • Aiming at the deformation control challenge in shield tunneling for overlapping tunnels adjacent to existing operational lines, this study takes the project of the Gangzicun–Huayuan Road section of Nanjing Metro Line 6 as the engineering background and adopts the construction technologies including the bottom-up tunneling sequence, grouting isolation and reinforcement, as well as the formwork trolley system support for the lower tunnel. Through field measurements, it examines the patterns of surface subsidence triggered by the construction of overlapped shield tunnels and the effects of shield tunneling on segments of nearby operational lines. The study documents the complete cycle of surface subsidence and the deformation patterns in existing tunnels. The results show that: (1) During the excavation of the downbound tunnel, the surface settlement first rises with the relative time of excavation, reaches the maximum value, and then settles until it tends to stabilize, and the surface settlement law during the excavation of the upbound tunnel is similar. Affected by grouting isolation and reinforcement, the surface settlement of the existing tunnel does not show significant changes, and the overall surface settlement curve conforms to an asymmetric Peck curve. (2) During shield tunneling, the grouting pressure increases, and the daily variation of surface vertical displacement correspondingly increases. The total thrust and cutterhead torque of the shield machine have no significant effect on the vertical displacement of the ground surface. (3) During the excavation of the upbound tunnel, the deformation of the downbound tunnel develops from a "circular" shape to a "vertical elliptical" shape. Under the support of the trolley, the vertical displacement of the track bed in the downbound tunnel is reduced by 50% compared to the horizontal convergence value of the tunnel without trolley support. (4) After the completion of the upbound tunnel excavation, the maximum settlement of the arch crown and track bed was 2.6 mm and 2.5 mm, respectively, and the maximum horizontal displacement of the left and right arch waists was 0.3 mm and 0.7 mm, respectively, showing a trend of moving towards the overlapping tunnel direction.

     

  • loading
  • [1]
    侯秀芳, 冯 晨, 燕汉民, 等. 2023年中国内地城市轨道交通运营线路概况[J]. 都市快轨交通, 2024, 37(1): 10-16. (HOU X F, FENG C, YAN H M, et al. Overview of urban rail transit operational lines in Chinese mainland in 2023[J]. Urban Rapid Rail Transit, 2024, 37(1): 10-16. (in Chinese) doi: 10.3969/j.issn.1672-6073.2024.01.002

    HOU X F, FENG C, YAN H M, et al. Overview of urban rail transit operational lines in Chinese mainland in 2023[J]. Urban Rapid Rail Transit, 2024, 37(1): 10-16. (in Chinese) doi: 10.3969/j.issn.1672-6073.2024.01.002
    [2]
    董立朋, 聂清浩, 孙晓坤, 等. 基于皮尔逊相关系数法的盾构掘进参数对地表沉降影响分析[J]. 施工技术(中英文), 2024, 53(1): 116-123. (DONG L P, NIE Q H, SUN X K, et al. Analysis of impact of shield tunneling parameters on ground settlement based on Pearson correlation coefficient method[J]. Construction Technology, 2024, 53(1): 116-123. (in Chinese)

    DONG L P, NIE Q H, SUN X K, et al. Analysis of impact of shield tunneling parameters on ground settlement based on Pearson correlation coefficient method[J]. Construction Technology, 2024, 53(1): 116-123. (in Chinese)
    [3]
    宫亚峰, 王 博, 魏海斌, 等. 基于Peck公式的双线盾构隧道地表沉降规律[J]. 吉林大学学报(工学版), 2018, 48(5): 1411-1417. (GONG Y F, WANG B, WEI H B, et al. Surface subsidence law of double-line shield tunnel based on Peck formula[J]. Journal of Jilin University (Engineering and Technology Edition), 2018, 48(5): 1411-1417. (in Chinese)

    GONG Y F, WANG B, WEI H B, et al. Surface subsidence law of double-line shield tunnel based on Peck formula[J]. Journal of Jilin University (Engineering and Technology Edition), 2018, 48(5): 1411-1417. (in Chinese)
    [4]
    齐永洁, 朱建才, 周 建, 等. 土岩复合地层中盾构施工引起的地表位移预测[J]. 岩土工程学报, 2023, 45(5): 1054-1062. (QI Y J, ZHU J C, ZHOU J, et al. Prediction of surface displacement caused by shield construction in soil-rock composite strata[J]. Chinese Journal of Geotechnical Engineering, 2023, 45(5): 1054-1062. (in Chinese) doi: 10.11779/CJGE20220318

    QI Y J, ZHU J C, ZHOU J, et al. Prediction of surface displacement caused by shield construction in soil-rock composite strata[J]. Chinese Journal of Geotechnical Engineering, 2023, 45(5): 1054-1062. (in Chinese) doi: 10.11779/CJGE20220318
    [5]
    王 伟, 王 兴, 周 勋, 等. 砂卵石地层盾构区间地表沉降影响因素聚类分析[J]. 吉林大学学报(地球科学版), 2024, 54(1): 219-230. (WANG W, WANG X, ZHOU X, et al. Cluster analysis of influencing factors of surface subsidence in shield interval of sandy gravel stratum[J]. Journal of Jilin University (Earth Science Edition), 2024, 54(1): 219-230. (in Chinese)

    WANG W, WANG X, ZHOU X, et al. Cluster analysis of influencing factors of surface subsidence in shield interval of sandy gravel stratum[J]. Journal of Jilin University (Earth Science Edition), 2024, 54(1): 219-230. (in Chinese)
    [6]
    PECK B R. Deep excavations and tunneling in soft ground[C]//Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering. Mexico: Sociedad Mexicana de Mecanica, 1969: 225-290.
    [7]
    赵 帅. 青岛市近距离交叠隧道开挖的地表沉降规律研究[D]. 青岛: 山东科技大学, 2008. (ZHAO S. Study of ground surface settlement during overlapped tunnel excavation in Qingdao City[D]. Qingdao: Shandong University of Science and Technology, 2008. (in Chinese)

    ZHAO S. Study of ground surface settlement during overlapped tunnel excavation in Qingdao City[D]. Qingdao: Shandong University of Science and Technology, 2008. (in Chinese)
    [8]
    FANG K D, YANG Z Y, JIANG Y S, et al. Surface subsidence characteristics of fully overlapping tunnels constructed using tunnel boring machine in a clay stratum[J]. Computers and Geotechnics, 2020, 125: 103679. doi: 10.1016/j.compgeo.2020.103679
    [9]
    李海洋. 四线叠交小间距盾构隧道下穿桥梁沉降控制案例分析[J]. 隧道建设(中英文), 2020, 40(S1): 343-349. (LI H Y. Analysis of settlement control of bridge induced by undercrossing of four-line overlapping small-spacing shield tunnels[J]. Tunnel Construction, 2020, 40(S1): 343-349. (in Chinese)

    LI H Y. Analysis of settlement control of bridge induced by undercrossing of four-line overlapping small-spacing shield tunnels[J]. Tunnel Construction, 2020, 40(S1): 343-349. (in Chinese)
    [10]
    肜增湘, 余炳臻, 戴灏卿, 等. 交叠隧道引起地表及既有隧道变形规律分析[J]. 安全与环境工程, 2024, 31(4): 58-67. (RONG Z X, YU B Z, DAI H Q, et al. Analysis of deformation patterns of ground surface and existing tunnels caused by overlapping tunnels[J]. Safety and Environmental Engineering, 2024, 31(4): 58-67. (in Chinese)

    RONG Z X, YU B Z, DAI H Q, et al. Analysis of deformation patterns of ground surface and existing tunnels caused by overlapping tunnels[J]. Safety and Environmental Engineering, 2024, 31(4): 58-67. (in Chinese)
    [11]
    孙博文, 裴利华. 圆砾地层近距离多线叠交盾构隧道施工顺序分析[J]. 施工技术(中英文), 2023, 52(24): 100-106. (SUN B W, PEI L H. Analysis of construction sequence for close distance multi-line overlapping shield tunnels in round gravel stratum[J]. Construction Technology, 2023, 52(24): 100-106. (in Chinese)

    SUN B W, PEI L H. Analysis of construction sequence for close distance multi-line overlapping shield tunnels in round gravel stratum[J]. Construction Technology, 2023, 52(24): 100-106. (in Chinese)
    [12]
    王 磊, 刘伟萍, 郝昕驰. 多线叠交盾构下穿既有隧道数值模拟分析[J]. 水利与建筑工程学报, 2023, 21(3): 58-64. (WANG L, LIU W P, HAO X C. Numerical simulation of multi-line overlapping shield tunneling under existing tunnels[J]. Journal of Water Resources and Architectural Engineering, 2023, 21(3): 58-64. (in Chinese) doi: 10.3969/j.issn.1672-1144.2023.03.009

    WANG L, LIU W P, HAO X C. Numerical simulation of multi-line overlapping shield tunneling under existing tunnels[J]. Journal of Water Resources and Architectural Engineering, 2023, 21(3): 58-64. (in Chinese) doi: 10.3969/j.issn.1672-1144.2023.03.009
    [13]
    冯慧君, 俞然刚. 双线隧道盾构掘进对地表沉降影响的数值分析[J]. 铁道工程学报, 2019, 36(3): 78-83. (FENG H J, YU R G. Numerical analysis of influence of double-line tunnel shield tunneling on ground surface settlement[J]. Journal of Railway Engineering Society, 2019, 36(3): 78-83. (in Chinese) doi: 10.3969/j.issn.1006-2106.2019.03.014

    FENG H J, YU R G. Numerical analysis of influence of double-line tunnel shield tunneling on ground surface settlement[J]. Journal of Railway Engineering Society, 2019, 36(3): 78-83. (in Chinese) doi: 10.3969/j.issn.1006-2106.2019.03.014
    [14]
    秦辉辉. 小曲线叠落式隧道近接影响分区及变形控制技术研究[D]. 北京: 北京交通大学, 2012. (QIN H H. The adjacent influenced partition and deformation control technology of overlapping tunnel with small radius curve[D]. Beijing: Beijing Jiaotong University, 2012. (in Chinese)

    QIN H H. The adjacent influenced partition and deformation control technology of overlapping tunnel with small radius curve[D]. Beijing: Beijing Jiaotong University, 2012. (in Chinese)
    [15]
    安建永, 雷海波, 尹鸿威, 等. 富水砂层超小净距叠线盾构隧道施工安全控制技术[J]. 隧道建设(中英文), 2021, 41(S2): 503-511. (AN J Y, LEI H B, YIN H W, et al. Safety control technology for ultra-small clear distance overlapping shield tunnel construction in water-rich sandy stratum[J]. Tunnel Construction, 2021, 41(S2): 503-511. (in Chinese)

    AN J Y, LEI H B, YIN H W, et al. Safety control technology for ultra-small clear distance overlapping shield tunnel construction in water-rich sandy stratum[J]. Tunnel Construction, 2021, 41(S2): 503-511. (in Chinese)
    [16]
    裴浩东, 叶社保, 杨 平, 等. 软土地层盾构掘进参数分析及掘进速度预测[J]. 郑州大学学报(工学版), 2024, 45(1): 107-113. (PEI H D, YE S B, YANG P, et al. Analysis of boring parameters of shield in soft soil strata and prediction of driving speed[J]. Journal of Zhengzhou University (Engineering Science), 2024, 45(1): 107-113. (in Chinese)

    PEI H D, YE S B, YANG P, et al. Analysis of boring parameters of shield in soft soil strata and prediction of driving speed[J]. Journal of Zhengzhou University (Engineering Science), 2024, 45(1): 107-113. (in Chinese)
    [17]
    唐 宇, 叶社保, 张志宇, 等. 软流塑地层盾构施工参数对地表竖向位移的影响[J]. 林业工程学报, 2023, 8(1): 179-188. (TANG Y, YE S B, ZHANG Z Y, et al. Field test on surficial vertical displacement of soft-fluid plastic stratum caused by shield construction parameters[J]. Journal of Forestry Engineering, 2023, 8(1): 179-188. (in Chinese)

    TANG Y, YE S B, ZHANG Z Y, et al. Field test on surficial vertical displacement of soft-fluid plastic stratum caused by shield construction parameters[J]. Journal of Forestry Engineering, 2023, 8(1): 179-188. (in Chinese)
    [18]
    张晓清, 张孟喜, 李 林, 等. 多线叠交盾构隧道近距离穿越施工扰动机制研究[J]. 岩土力学, 2017, 38(4): 1133-1140. (ZHANG X Q, ZHANG M X, LI L, et al. Mechanism of approaching construction disturbance caused by multi-line overlapped shield tunnelling[J]. Rock and Soil Mechanics, 2017, 38(4): 1133-1140. (in Chinese)

    ZHANG X Q, ZHANG M X, LI L, et al. Mechanism of approaching construction disturbance caused by multi-line overlapped shield tunnelling[J]. Rock and Soil Mechanics, 2017, 38(4): 1133-1140. (in Chinese)
    [19]
    安建永, 雷海波, 王若辉, 等. 盾构隧道平行转叠线施工地表沉降特征及控制技术[J]. 施工技术(中英文), 2023, 52(13): 97-101. (AN J Y, LEI H B, WANG R H, et al. Study on surface settlement characteristics and control technology of shield tunnel parallel to overlap construction[J]. Construction Technology, 2023, 52(13): 97-101. (in Chinese)

    AN J Y, LEI H B, WANG R H, et al. Study on surface settlement characteristics and control technology of shield tunnel parallel to overlap construction[J]. Construction Technology, 2023, 52(13): 97-101. (in Chinese)
    [20]
    李姝婷. 重叠隧道盾构施工期间地表沉降与隧道变形的数值模拟与分析[J]. 建筑结构, 2022, 52(S1): 2935-2940. (LI S T. Study on the ground surface subsidence and existing tunnel deformation during small spacing overlapped tunnel construction[J]. Building Structure, 2022, 52(S1): 2935-2940. (in Chinese)

    LI S T. Study on the ground surface subsidence and existing tunnel deformation during small spacing overlapped tunnel construction[J]. Building Structure, 2022, 52(S1): 2935-2940. (in Chinese)
    [21]
    马海良. 先上后下施工方式对近接重叠隧道的影响及控制研究[D]. 淮南: 安徽理工大学, 2019. (MA H L. Study on the influence and control of the first-in and second-down construction methods on the adjacent overlapping tunnel[D]. Huainan: Anhui University of Science and Technology, 2019. (in Chinese)

    MA H L. Study on the influence and control of the first-in and second-down construction methods on the adjacent overlapping tunnel[D]. Huainan: Anhui University of Science and Technology, 2019. (in Chinese)
    [22]
    孟庆军. 四线叠交隧道盾构施工地基变形及控制研究[J]. 地下空间与工程学报, 2019, 15(3): 911-919,926. (MENG Q J. Study on the deformation and control of foundation in shield construction of four-line overlapped tunnel[J]. Chinese Journal of Underground Space and Engineering, 2019, 15(3): 911-919,926. (in Chinese)

    MENG Q J. Study on the deformation and control of foundation in shield construction of four-line overlapped tunnel[J]. Chinese Journal of Underground Space and Engineering, 2019, 15(3): 911-919,926. (in Chinese)
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(15)

    Article Metrics

    Article views (22) PDF downloads(6) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return