WANG Zhou, ZHENG Yuhui, CUI Liang, MAO Chuan, LIU Lei. Application of comprehensive geological prediction technology in Wuzhishan Tunnel[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2026, 40(5): 672-681. doi: 10.20265/j.cnki.issn.1007-2993.2025-0211
Citation: WANG Zhou, ZHENG Yuhui, CUI Liang, MAO Chuan, LIU Lei. Application of comprehensive geological prediction technology in Wuzhishan Tunnel[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2026, 40(5): 672-681. doi: 10.20265/j.cnki.issn.1007-2993.2025-0211

Application of comprehensive geological prediction technology in Wuzhishan Tunnel

doi: 10.20265/j.cnki.issn.1007-2993.2025-0211
  • Received Date: 2025-05-09
  • Accepted Date: 2025-11-11
  • Rev Recd Date: 2025-09-03
  • Available Online: 2026-10-08
  • Publish Date: 2026-10-08
  • During the construction of tunnels under complex geological conditions, to investigate the geological conditions ahead of the tunnel face and prevent adverse geological hazards such as soft rock fracture, water inrush and mud outburst, a management system for dynamic comprehensive geological prediction and design of tunnels should be established with geological analysis as the main line and the combination of long and short distance advanced geological prediction as the basis. In the construction of the Wuzhishan Extra long Tunnel on the Renshou to Pingshan Xinshi section of the G4216 Expressway, aiming at various adverse geological bodies, multiple advanced geological prediction methods including geological analysis, advanced horizontal drilling, ground penetrating radar, transient electromagnetic method and seismic wave method were adopted. A management system for dynamic comprehensive prediction and design was constructed to guide dynamic design, and post excavation comparative verification was carried out according to construction progress. This management system reduces geological safety risks in tunnel construction, featuring scientificity, economy and safety. It can provide references for advanced geological prediction and dynamic design of tunnels under similar complex geological conditions.

     

  • loading
  • [1]
    钱七虎. 地下工程建设安全面临的挑战与对策[J]. 岩石力学与工程学报, 2012, 31(10): 1945-1956. (QIAN Q H. Challenges faced by underground projects construction safety and countermeasures[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(10): 1945-1956. (in Chinese) doi: 10.3969/j.issn.1000-6915.2012.10.001

    QIAN Q H. Challenges faced by underground projects construction safety and countermeasures[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(10): 1945-1956. (in Chinese) doi: 10.3969/j.issn.1000-6915.2012.10.001
    [2]
    雷盼盼, 王军伟, 史海智. 综合超前地质预报在天竺山一号岩溶隧道中的应用[J]. 工程地球物理学报, 2024, 21(6): 996-1005. (LEI P P, WANG J W, SHI H Z. Application of comprehensive advanced geological prediction method in karst tunnel of Tianzhushan No. 1[J]. Chinese Journal of Engineering Geophysics, 2024, 21(6): 996-1005. (in Chinese) doi: 10.3969/j.issn.1672-7940.2024.06.009

    LEI P P, WANG J W, SHI H Z. Application of comprehensive advanced geological prediction method in karst tunnel of Tianzhushan No. 1[J]. Chinese Journal of Engineering Geophysics, 2024, 21(6): 996-1005. (in Chinese) doi: 10.3969/j.issn.1672-7940.2024.06.009
    [3]
    雷 栋, 胡祥云. 地震层析成像方法综述[J]. 地震研究, 2020, 44(2): 227-234. (LEI D, HU X Y. A review of seismic tomography methods[J]. Geophysical & Geochemical Exploration, 2006, 39(4): 227-234. (in Chinese)

    LEI D, HU X Y. A review of seismic tomography methods[J]. Geophysical & Geochemical Exploration, 2006, 39(4): 227-234. (in Chinese)
    [4]
    李术才, 刘 斌, 孙怀凤, 等. 隧道施工超前地质预报研究现状及发展趋势[J]. 岩石力学与工程学报, 2014, 33(6): 1090-1113. (LI S C, LIU B, SUN H F, et al. State of art and trends of advanced geological prediction in tunnel construction[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(6): 1090-1113. (in Chinese)

    LI S C, LIU B, SUN H F, et al. State of art and trends of advanced geological prediction in tunnel construction[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(6): 1090-1113. (in Chinese)
    [5]
    谷 松. 探地雷达技术在隧道施工超前地质预报的应用[J]. 地质装备, 2022, 23(5): 36-39. (GU S. Application of GPR in advanced geological forecast for tunnelling[J]. Equipment for Geotechnical Engineering, 2022, 23(5): 36-39. (in Chinese)

    GU S. Application of GPR in advanced geological forecast for tunnelling[J]. Equipment for Geotechnical Engineering, 2022, 23(5): 36-39. (in Chinese)
    [6]
    李术才, 薛翊国, 张庆松, 等. 高风险岩溶地区隧道施工地质灾害综合预报预警关键技术研究[J]. 岩石力学与工程学报, 2008, 27(7): 1297-1307. (LI S C, XUE Y G, ZHANG Q S, et al. Key technology study on comprehensive prediction and early-warning of geological hazards during tunnel construction in high-risk karst areas[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(7): 1297-1307. (in Chinese)

    LI S C, XUE Y G, ZHANG Q S, et al. Key technology study on comprehensive prediction and early-warning of geological hazards during tunnel construction in high-risk karst areas[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(7): 1297-1307. (in Chinese)
    [7]
    李天斌, 孟陆波, 朱 劲, 等. 隧道超前地质预报综合分析方法[J]. 岩石力学与工程学报, 2009, 28(12): 2429-2436. (LI T B, MENG L B, ZHU J, et al. Comprehensive analysis method for advanced forecast of geology in tunnels[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(12): 2429-2436. (in Chinese) doi: 10.20259/j.jzjskf.2025.02.0078

    LI T B, MENG L B, ZHU J, et al. Comprehensive analysis method for advanced forecast of geology in tunnels[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(12): 2429-2436. (in Chinese) doi: 10.20259/j.jzjskf.2025.02.0078
    [8]
    邵珠山, 张鹏举, 张 喆, 等. 隧道施工超前地质预报研究进展[J]. 长江科学院院报, 2022, 39(1): 70-77,85. (SHAO Z S, ZHANG P J, ZHANG Z, et al. Research progress of advanced geological prediction in tunnel construction[J]. Journal of Yangtze River Scientific Research Institute, 2022, 39(1): 70-77,85. (in Chinese) doi: 10.11988/ckyyb.20200874

    SHAO Z S, ZHANG P J, ZHANG Z, et al. Research progress of advanced geological prediction in tunnel construction[J]. Journal of Yangtze River Scientific Research Institute, 2022, 39(1): 70-77,85. (in Chinese) doi: 10.11988/ckyyb.20200874
    [9]
    中国电建集团贵阳勘测设计研究院有限公司. 隧道施工超前地质预报技术规程: T/CECS 616—2019[S]. 北京: 中国建筑工业出版社, 2019. (Powerchina Guiyang Engineering Corporation Limited. Technical specification for advance geological predication for tunnel construction: T/CECS 616—2019[S]. Beijing: China Architecture & Building Press, 2019. (in Chinese)

    Powerchina Guiyang Engineering Corporation Limited. Technical specification for advance geological predication for tunnel construction: T/CECS 616—2019[S]. Beijing: China Architecture & Building Press, 2019. (in Chinese)
    [10]
    高树全, 蒋良文, 牟元存, 等. 西南复杂艰险山区铁路隧道超前地质预报技术[J]. 现代隧道技术, 2024, 61(2): 52-59. (GAO S Q, JIANG L W, MOU Y C, et al. Advanced geological forecasting techniques for railway tunnels in the complex and treacherous mountainous areas of southwest China[J]. Modern Tunnelling Technology, 2024, 61(2): 52-59. (in Chinese) doi: 10.13807/j.cnki.mtt.2024.02.006

    GAO S Q, JIANG L W, MOU Y C, et al. Advanced geological forecasting techniques for railway tunnels in the complex and treacherous mountainous areas of southwest China[J]. Modern Tunnelling Technology, 2024, 61(2): 52-59. (in Chinese) doi: 10.13807/j.cnki.mtt.2024.02.006
    [11]
    贾 明, 庄 威, 孙晋哲. 某矿瞬变电磁探测实施方案研究[J]. 山东煤炭科技, 2014(2): 145-146,149. (JIA M, ZHUANG W, SUN J Z. Research on some mine transient electromagnetic detection scheme[J]. Shandong Coal Science and Technology, 2014(2): 145-146,149. (in Chinese) doi: 10.3969/j.issn.1005-2801.2014.02.67

    JIA M, ZHUANG W, SUN J Z. Research on some mine transient electromagnetic detection scheme[J]. Shandong Coal Science and Technology, 2014(2): 145-146,149. (in Chinese) doi: 10.3969/j.issn.1005-2801.2014.02.67
    [12]
    任建伟, 谢雄刚, 左冉振. 基于瞬变电磁法的矿井水害探测技术应用[J]. 煤矿开采, 2014, 19(1): 17-20. (REN J W, XIE X G, ZUO R Z. Application of mine water exploration technology based on transient electromagnetic method[J]. Coal Mining Technology, 2014, 19(1): 17-20. (in Chinese) doi: 10.13532/j.cnki.cn11-3677/td.2014.01.005

    REN J W, XIE X G, ZUO R Z. Application of mine water exploration technology based on transient electromagnetic method[J]. Coal Mining Technology, 2014, 19(1): 17-20. (in Chinese) doi: 10.13532/j.cnki.cn11-3677/td.2014.01.005
    [13]
    崔 涛, 李建雄, 张庆彬, 等. TGP206地质超前预报在岩溶隧道施工中的应用[J]. 矿业研究与开发, 2011, 31(1): 29-32,76. (CUI T, LI J X, ZHANG Q B, et al. Application of TGP206 Advanced geological forecast system in karst tunnel construction[J]. Mining Research and Development, 2011, 31(1): 29-32,76. (in Chinese) doi: 10.13827/j.cnki.kyyk.2017.02.024

    CUI T, LI J X, ZHANG Q B, et al. Application of TGP206 Advanced geological forecast system in karst tunnel construction[J]. Mining Research and Development, 2011, 31(1): 29-32,76. (in Chinese) doi: 10.13827/j.cnki.kyyk.2017.02.024
    [14]
    吴星银. TGP206型隧道地质超前预报仪在灵岩山隧道中的应用[J]. 铁道建筑技术, 2010(9): 102-103,118. (WU X Y. Application of TGP206 type tunnel geological forecast instrument in Lingyan mountain tunnel[J]. Railway Construction Technology, 2010(9): 102-103,118. (in Chinese) doi: 10.3969/j.issn.1009-4539.2010.09.027

    WU X Y. Application of TGP206 type tunnel geological forecast instrument in Lingyan mountain tunnel[J]. Railway Construction Technology, 2010(9): 102-103,118. (in Chinese) doi: 10.3969/j.issn.1009-4539.2010.09.027
    [15]
    陈亚乾, 李 天, 普新凯. 综合地球物理方法在隧道塌方处置中的应用研究[J]. 物探化探计算技术, 2020, 42(5): 670-677. (CHEN Y Q, LI T, PU X K. Application of integrated geophysics in tunnel collapse treatment[J]. Computing Techniques for Geophysical and Geochemical Exploration, 2020, 42(5): 670-677. (in Chinese) doi: 10.3969/j.issn.1001-1749.2020.05.15

    CHEN Y Q, LI T, PU X K. Application of integrated geophysics in tunnel collapse treatment[J]. Computing Techniques for Geophysical and Geochemical Exploration, 2020, 42(5): 670-677. (in Chinese) doi: 10.3969/j.issn.1001-1749.2020.05.15
    [16]
    李术才, 李树忱, 张庆松, 等. 岩溶裂隙水与不良地质情况超前预报研究[J]. 岩石力学与工程学报, 2007, 26(2): 217-225. (LI S C, LI S C, ZHANG Q S, et al. Forecast of karst-fractured groundwater and defective geological conditions[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(2): 217-225. (in Chinese) doi: 10.3321/j.issn:1000-6915.2007.02.001

    LI S C, LI S C, ZHANG Q S, et al. Forecast of karst-fractured groundwater and defective geological conditions[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(2): 217-225. (in Chinese) doi: 10.3321/j.issn:1000-6915.2007.02.001
    [17]
    蒋小平, 张 军, 韩 正, 等. 长大山岭瓦斯隧道施工通风影响下瓦斯运移扩散规律探究[J]. 中国公路, 2022(4): 100-103. (JIANG X P, ZHANG Jun, HAN Z, et al. Investigation of gas transport and dispersion mechanisms in extended mountain tunnels during ventilated construction[J]. China Highway, 2022(4): 100-103. (in Chinese)

    JIANG X P, ZHANG Jun, HAN Z, et al. Investigation of gas transport and dispersion mechanisms in extended mountain tunnels during ventilated construction[J]. China Highway, 2022(4): 100-103. (in Chinese)
    [18]
    王 涛. 聚能水压光面爆破技术在隧道施工中的应用[J]. 四川建材, 2019, 45(4): 94-95, 98. (WANG T. The application of energy-concentrated hydraulic smooth blasting technology in tunnel construction[J]. Sichuan Building Materials, 2019, 45(4): 94-95, 98. (in Chinese)

    WANG T. The application of energy-concentrated hydraulic smooth blasting technology in tunnel construction[J]. Sichuan Building Materials, 2019, 45(4): 94-95, 98. (in Chinese)
    [19]
    中华人民共和国交通运输部. 公路隧道施工技术规范: JTG/T 3660—2020[S]. 北京: 人民交通出版社, 2020. (Ministry of Transport of the People’s Republic of China. Technical specifications for construction of highway tunnel: JTG/T 3660—2020[S]. Beijing: China Communications Press, 2020. (in Chinese)

    Ministry of Transport of the People’s Republic of China. Technical specifications for construction of highway tunnel: JTG/T 3660—2020[S]. Beijing: China Communications Press, 2020. (in Chinese)
    [20]
    李万勇, 刘汉明, 唐 皓, 等. 复杂软弱围岩低瓦斯隧道大变形综合处置技术研究[J]. 四川建材, 2022, 48(10): 76-78,81. (LI W Y, LIU H M, TANG H, et al. Research on comprehensive disposal technology for large deformation of complex weak surrounding rock low gas tunnel[J]. Sichuan Building Materials, 2022, 48(10): 76-78,81. (in Chinese) doi: 10.3969/j.issn.1672-4011.2022.10.034

    LI W Y, LIU H M, TANG H, et al. Research on comprehensive disposal technology for large deformation of complex weak surrounding rock low gas tunnel[J]. Sichuan Building Materials, 2022, 48(10): 76-78,81. (in Chinese) doi: 10.3969/j.issn.1672-4011.2022.10.034
    [21]
    温 辉. 基于三维超前地质预报的瓦斯隧道穿越破碎段施工技术[J]. 铁道建筑技术, 2022(9): 193-197. (WEN H. Construction technology of gas tunnel crossing broken section based on 3D advance geological forecast[J]. Railway Construction Technology, 2022(9): 193-197. (in Chinese)

    WEN H. Construction technology of gas tunnel crossing broken section based on 3D advance geological forecast[J]. Railway Construction Technology, 2022(9): 193-197. (in Chinese)
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(15)  / Tables(2)

    Article Metrics

    Article views (41) PDF downloads(4) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return