| Citation: | LIU Zhanlong, LIU Bo, CHU Hui, SU Chao. Construction technique and bearing performance of bored pile in karst areas: a review[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2026, 40(5): 645-656. doi: 10.20265/j.cnki.issn.1007-2993.2025-0277 |
| [1] |
彭 都, 刘 伟, 赵福玉, 等. 昆明轨道交通岩溶专项勘察手段及方法[J]. 隧道建设(中英文), 2019, 39(S2): 269-282. (PENG D, LIU W, ZHAO F Y, et al. Special investigation means and methods of karst of Kunming rail transit[J]. Tunnel Construction, 2019, 39(S2): 269-282. (in Chinese) doi: 10.3973/j.issn.2096-4498.2019.S2.035
PENG D, LIU W, ZHAO F Y, et al. Special investigation means and methods of karst of Kunming rail transit[J]. Tunnel Construction, 2019, 39(S2): 269-282. (in Chinese) doi: 10.3973/j.issn.2096-4498.2019.S2.035
|
| [2] |
王家全, 朱存金, 李 磊. 岩溶地区冲孔灌注桩质量检测和缺陷处理[J]. 工业建筑, 2012, 42(12): 146-150. (WANG J Q, ZHU C J, LI L. Quality test and defect treatment of percussion drilling bored pile in karst areas[J]. Industrial Construction, 2012, 42(12): 146-150. (in Chinese)
WANG J Q, ZHU C J, LI L. Quality test and defect treatment of percussion drilling bored pile in karst areas[J]. Industrial Construction, 2012, 42(12): 146-150. (in Chinese)
|
| [3] |
朱佩宁, 宋亚亚, 齐昌广, 等. 岩溶地区嵌岩灌注桩承载性状试验研究[J]. 人民长江, 2020, 51(7): 200-205. (ZHU P N, SONG Y Y, QI C G, et al. Experimental research on bearing characteristics of rock-socket pile in Karst area[J]. Yangtze River, 2020, 51(7): 200-205. (in Chinese) doi: 10.16232/j.cnki.1001-4179.2020.07.034
ZHU P N, SONG Y Y, QI C G, et al. Experimental research on bearing characteristics of rock-socket pile in Karst area[J]. Yangtze River, 2020, 51(7): 200-205. (in Chinese) doi: 10.16232/j.cnki.1001-4179.2020.07.034
|
| [4] |
王家全, 朱庆盛, 刘垒雷, 等. 岩溶地质旋挖灌注桩成孔工艺及其基桩质量控制研究[J]. 施工技术, 2014, 43(19): 17-19,38. (WANG J Q, ZHU Q S, LIU L L, et al. Research on the pore-forming technology of rotary digging cast-in-place pile and quality control in karst area[J]. Construction Technology, 2014, 43(19): 17-19,38. (in Chinese)
WANG J Q, ZHU Q S, LIU L L, et al. Research on the pore-forming technology of rotary digging cast-in-place pile and quality control in karst area[J]. Construction Technology, 2014, 43(19): 17-19,38. (in Chinese)
|
| [5] |
侯振坤, 刘宇鹏, 凌 造, 等. 岩溶区桩基承载特性研究综述[J]. 科学技术与工程, 2024, 24(11): 4369-4379. (HOU Z K, LIU Y P, LING Z, et al. Review of research progress on bearing characteristics and key disposal techniques of pile foundation in karst area[J]. Science Technology and Engineering, 2024, 24(11): 4369-4379. (in Chinese) doi: 10.12404/j.issn.1671-1815.2301477
HOU Z K, LIU Y P, LING Z, et al. Review of research progress on bearing characteristics and key disposal techniques of pile foundation in karst area[J]. Science Technology and Engineering, 2024, 24(11): 4369-4379. (in Chinese) doi: 10.12404/j.issn.1671-1815.2301477
|
| [6] |
汪进超, 王彦明, 徐书名, 等. 定向声波扫描在孔周隐伏溶洞探测中的应用[J]. 应用基础与工程科学学报, 2025, 33(6): 1759-1767. (WANG J C, WANG Y M, XU S M, et al. Application of directional acoustic scanning in detecting hidden karst caves around borehole[J]. Journal of Basic Science and Engineering, 2025, 33(6): 1759-1767. (in Chinese) doi: 10.16058/j.issn.1005-0930.2025.06.017
WANG J C, WANG Y M, XU S M, et al. Application of directional acoustic scanning in detecting hidden karst caves around borehole[J]. Journal of Basic Science and Engineering, 2025, 33(6): 1759-1767. (in Chinese) doi: 10.16058/j.issn.1005-0930.2025.06.017
|
| [7] |
何世茂, 鹿 磊, 胡艳玲. 岩溶地区基础选型分析和工程应用[J]. 建筑结构, 2022, 52(S1): 2368-2372. (HE S M, LU L, HU Y L. Analysis and engineering application of foundation selection in karst area[J]. Building Structure, 2022, 52(S1): 2368-2372. (in Chinese)
HE S M, LU L, HU Y L. Analysis and engineering application of foundation selection in karst area[J]. Building Structure, 2022, 52(S1): 2368-2372. (in Chinese)
|
| [8] |
曹 强, 周 金. 综合超前地质预报技术在复杂岩溶隧道的应用[J]. 铁道建筑技术, 2020(11): 146-150,172. (CAO Q, ZHOU J. Application of comprehensive advanced geology forecast technology in complex karst tunnel[J]. Railway Construction Technology, 2020(11): 146-150,172. (in Chinese)
CAO Q, ZHOU J. Application of comprehensive advanced geology forecast technology in complex karst tunnel[J]. Railway Construction Technology, 2020(11): 146-150,172. (in Chinese)
|
| [9] |
张龙起, 陈 景, 曲朝雷. 唐山岩溶区桩基施工中几个问题的分析与探讨[J]. 岩土工程学报, 2011, 33(S1): 325-330. (ZHANG L Q, CHEN J, QU C L. Analysis and discussion of several issues of pile foundation construction in karst region of Tangshan[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(S1): 325-330. (in Chinese)
ZHANG L Q, CHEN J, QU C L. Analysis and discussion of several issues of pile foundation construction in karst region of Tangshan[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(S1): 325-330. (in Chinese)
|
| [10] |
李春景, 刘爱娟. 岩溶地区大直径钻孔桩施工技术[J]. 世界桥梁, 2006(2): 35-37. (LI C J, LIU A J. Construction techniques for large diameter bored piles in karst district[J]. World Bridges, 2006(2): 35-37. (in Chinese)
LI C J, LIU A J. Construction techniques for large diameter bored piles in karst district[J]. World Bridges, 2006(2): 35-37. (in Chinese)
|
| [11] |
彭柏兴, 贾永生, 王会云, 等. 深厚填土下复杂岩溶场地大直径桩桩基勘察与施工措施[J]. 建筑结构, 2021, 51(S1): 2315-2319. (PENG B X, JIA Y S, WANG H Y, et al. Counter measures and survey for large-diameter pile foundation in complex karst site under deep and thick filling[J]. Building Structure, 2021, 51(S1): 2315-2319. (in Chinese)
PENG B X, JIA Y S, WANG H Y, et al. Counter measures and survey for large-diameter pile foundation in complex karst site under deep and thick filling[J]. Building Structure, 2021, 51(S1): 2315-2319. (in Chinese)
|
| [12] |
HILTUNEN D R, CRAMER B J. Application of seismic refraction tomography in karst terrane[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2008, 134(7): 938-948. doi: 10.1061/(ASCE)1090-0241(2008)134:7(938)
|
| [13] |
LIU L, SHI Z M, PENG M, et al. Numerical modeling for karst cavity sonar detection beneath bored cast in situ pile using 3D staggered grid finite difference method[J]. Tunnelling and Underground Space Technology, 2018, 82: 50-65. doi: 10.1016/j.tust.2018.07.034
|
| [14] |
PAN C W, ZHANG G C, CHEN S, et al. Study on detection of the bearing stratum integrity of bored pile based on transient electromagnetic method[J]. Geofluids, 2022, 2022: 2583113.
|
| [15] |
LIU X, PAN C W, ZHENG F K, et al. Transient electromagnetic 1‐dimensional inversion based on the quantum particle swarms optimization‐smooth constrained least squares joint algorithm and its application in karst exploration[J]. Advances in Civil Engineering, 2022, 2022: 1555877. doi: 10.1155/2022/1555877
|
| [16] |
LIU L, SHI Z M, LI S J, et al. A system for inspecting karst voids during construction of cast-in-place pile foundations[J]. Engineering Geology, 2023, 320: 107124. doi: 10.1016/j.enggeo.2023.107124
|
| [17] |
LIU L, SHI Z M, TSOFLIAS G P, et al. Detection of karst cavity beneath cast-in-place pile using the instantaneous phase difference of two receiver recordings[J]. Geophysics, 2021, 86(1): EN27-EN38. doi: 10.1190/geo2020-0082.1
|
| [18] |
覃羡安, 王小锋. BIM技术在隐伏溶洞复杂空间形态三维可视化中的应用[J]. 桂林理工大学学报, 2017, 37(3): 412-416. (QIN X A, WANG X F. Application of BIM technology to 3-D visualization complex spatial morphology of concealed karst caverns[J]. Journal of Guilin University of Technology, 2017, 37(3): 412-416. (in Chinese)
QIN X A, WANG X F. Application of BIM technology to 3-D visualization complex spatial morphology of concealed karst caverns[J]. Journal of Guilin University of Technology, 2017, 37(3): 412-416. (in Chinese)
|
| [19] |
TRAN K T, MIRZANEJAD M, HORHOTA D, et al. Imaging of voids beyond boring depth with 3D SPT-seismic full-waveform tomography[J]. Journal of Applied Geophysics, 2024, 220: 105256. doi: 10.1016/j.jappgeo.2023.105256
|
| [20] |
WANG Z N, ZHU T Y. Characterizing fractured zones in urban karst geology using leaky surface waves from distributed acoustic sensing[J]. Journal of Geophysical Research: Solid Earth, 2025, 130(7): e2025JB031477. doi: 10.1029/2025JB031477
|
| [21] |
GONDWE B R N, OTTOWITZ D, SUPPER R, et al. Regional-scale airborne electromagnetic surveying of the Yucatan karst aquifer (Mexico): geological and hydrogeological interpretation[J]. Hydrogeology Journal, 2012, 20(7): 1407-1425. doi: 10.1007/s10040-012-0877-8
|
| [22] |
SUN H F, ZHANG N Y, LI D R, et al. The first semi-airborne transient electromagnetic survey for tunnel investigation in very complex terrain areas[J]. Tunnelling and Underground Space Technology, 2023, 132: 104893. doi: 10.1016/j.tust.2022.104893
|
| [23] |
BENI T, BORSELLI D, BONECHI L, et al. Use of muon imaging for enhanced reconstruction of underground cavities and associated stability conditions at a historical mining site[J]. Engineering Geology, 2025, 353: 108141. doi: 10.1016/j.enggeo.2025.108141
|
| [24] |
BALÁZS L, HAMAR G, CSICSEK Á, et al. Detection of fractured zones, faults, and cavities by high resolution muon tomography in the Buda Hills[J]. Scientific Reports, 2025, 15(1): 17514. doi: 10.1038/s41598-025-02510-0
|
| [25] |
鲍庆伟, 高 杰, 张书良, 等. 复杂岩溶地区超大径超长桩旋挖钻入岩施工技术[J]. 世界桥梁, 2017, 45(4): 41-45. (BAO Q W, GAO J, ZHANG S L, et al. Construction technique of driving very-long and large-diameter piles by rotary drilling in complex karst region[J]. World Bridges, 2017, 45(4): 41-45. (in Chinese) doi: 10.3969/j.issn.1671-7767.2017.04.009
BAO Q W, GAO J, ZHANG S L, et al. Construction technique of driving very-long and large-diameter piles by rotary drilling in complex karst region[J]. World Bridges, 2017, 45(4): 41-45. (in Chinese) doi: 10.3969/j.issn.1671-7767.2017.04.009
|
| [26] |
苏 斌. 岩溶地区钻(挖)孔施工技术[J]. 岩石力学与工程学报, 2004, 23(S2): 5240-5243. (SU B. Construction technology of drilled (dug) holes in karst terrain[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(S2): 5240-5243. (in Chinese) doi: 10.14189/j.cnki.cm1981.2025.12.051
SU B. Construction technology of drilled (dug) holes in karst terrain[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(S2): 5240-5243. (in Chinese) doi: 10.14189/j.cnki.cm1981.2025.12.051
|
| [27] |
郭 恒, 袁啸岩, 李金强, 等. 岩溶地区散土−硬岩复杂地层降水井施工技术研究及应用[J]. 施工技术, 2017, 46(19): 109-113. (GUO H, YUAN X Y, LI J Q, et al. Research and application on construction technology of dewatering well in complex stratum and hard rock of karst area[J]. Construction Technology, 2017, 46(19): 109-113. (in Chinese) doi: 10.7672/sgjs2017190109
GUO H, YUAN X Y, LI J Q, et al. Research and application on construction technology of dewatering well in complex stratum and hard rock of karst area[J]. Construction Technology, 2017, 46(19): 109-113. (in Chinese) doi: 10.7672/sgjs2017190109
|
| [28] |
许汉华, 刘文连, 槐以高, 等. 智能钻孔井下电视在岩溶勘察工程中的应用[J]. 工程勘察, 2020, 48(9): 30-34. (XU H H, LIU W L, HUAI Y G, et al. Application of intelligent borehole television technique in karst investigation[J]. Geotechnical Investigation & Surveying, 2020, 48(9): 30-34. (in Chinese)
XU H H, LIU W L, HUAI Y G, et al. Application of intelligent borehole television technique in karst investigation[J]. Geotechnical Investigation & Surveying, 2020, 48(9): 30-34. (in Chinese)
|
| [29] |
谢忠球, 张玉池, 肖宏彬, 等. 岩溶地基灌浆质量评价的声波全波列测井技术[J]. 中南大学学报(自然科学版), 2012, 43(7): 2757-2761. (XIE Z Q, ZHANG Y C, XIAO H B, et al. Acoustic full wave logging of karst foundation grouting effect evaluation[J]. Journal of Central South University (Science and Technology), 2012, 43(7): 2757-2761. (in Chinese)
XIE Z Q, ZHANG Y C, XIAO H B, et al. Acoustic full wave logging of karst foundation grouting effect evaluation[J]. Journal of Central South University (Science and Technology), 2012, 43(7): 2757-2761. (in Chinese)
|
| [30] |
张广丰. 环境敏感区铁路路基岩溶地基处理新结构研究[J]. 铁道工程学报, 2018, 35(6): 21-25. (ZHANG G F. Research on the new structure of railway subgrade in karst ground treatment in environmental sensitive area[J]. Journal of Railway Engineering Society, 2018, 35(6): 21-25. (in Chinese) doi: 10.3969/j.issn.1006-2106.2018.06.005
ZHANG G F. Research on the new structure of railway subgrade in karst ground treatment in environmental sensitive area[J]. Journal of Railway Engineering Society, 2018, 35(6): 21-25. (in Chinese) doi: 10.3969/j.issn.1006-2106.2018.06.005
|
| [31] |
陈文尹. 高铁隧道底部大型溶洞先通过后处治技术研究[J]. 现代隧道技术, 2022, 59(4): 248-255. (CHEN W Y. Study on treatment-after-passing technology for large karst cave below high-speed railway tunnel[J]. Modern Tunnelling Technology, 2022, 59(4): 248-255. (in Chinese) doi: 10.13807/j.cnki.mtt.2022.04.027
CHEN W Y. Study on treatment-after-passing technology for large karst cave below high-speed railway tunnel[J]. Modern Tunnelling Technology, 2022, 59(4): 248-255. (in Chinese) doi: 10.13807/j.cnki.mtt.2022.04.027
|
| [32] |
昌 钰, 刘耀峰. 岩溶地区钻孔灌注桩施工质量分析与对策[J]. 工业建筑, 2013, 43(S1): 670-674. (CHANG Y, LIU Y F. The analysis and countermeasure of construction quality of cast-in-place bored pile in karst area[J]. Industrial Construction, 2013, 43(S1): 670-674. (in Chinese) doi: 10.13204/j.gyjz2013.s1.232
CHANG Y, LIU Y F. The analysis and countermeasure of construction quality of cast-in-place bored pile in karst area[J]. Industrial Construction, 2013, 43(S1): 670-674. (in Chinese) doi: 10.13204/j.gyjz2013.s1.232
|
| [33] |
XU M J, ZHANG F Y, NI P P, et al. Load–settlement behaviour of membrane-confined grouted pile: experimental and analytical study[J]. Acta Geotechnica, 2023, 18(5): 2777-2793. doi: 10.1007/s11440-022-01711-5
|
| [34] |
常晓义. 武广高速铁路岩溶地区钻孔灌注桩施工技术[J]. 铁道科学与工程学报, 2010, 7(2): 70-73. (CHANG X Y. Construction technology bored pile in karst region of Wuhan-Guangzhou high-speed railway[J]. Journal of Railway Science and Engineering, 2010, 7(2): 70-73. (in Chinese)
CHANG X Y. Construction technology bored pile in karst region of Wuhan-Guangzhou high-speed railway[J]. Journal of Railway Science and Engineering, 2010, 7(2): 70-73. (in Chinese)
|
| [35] |
杨 松. 复杂地层环境下的全套管钻孔桩成套技术[J]. 工业建筑, 2017, 47(5): 116-121. (YANG S. Unitized technique for complete diving casing cast-in-place pile in complex stratigraphic conditions[J]. Industrial Construction, 2017, 47(5): 116-121. (in Chinese)
YANG S. Unitized technique for complete diving casing cast-in-place pile in complex stratigraphic conditions[J]. Industrial Construction, 2017, 47(5): 116-121. (in Chinese)
|
| [36] |
周 峰, 屈 伟, 陈 杰. 岩溶地区端承桩复合桩基的工程实践[J]. 地下空间与工程学报, 2016, 12(2): 489-495. (ZHOU F, QU W, CHEN J. Engineering practice on end-bearing composite pile foundation in karst area[J]. Chinese Journal of Underground Space and Engineering, 2016, 12(2): 489-495. (in Chinese) doi: 10.20174/j.juse.2016.02.032
ZHOU F, QU W, CHEN J. Engineering practice on end-bearing composite pile foundation in karst area[J]. Chinese Journal of Underground Space and Engineering, 2016, 12(2): 489-495. (in Chinese) doi: 10.20174/j.juse.2016.02.032
|
| [37] |
李春生. 深水岩溶地基桥梁灌注桩施工技术与检测分析[J]. 桥梁建设, 2005(4): 59-61,68. (LI C S. Construction techniques and detection analysis of bridge bored piles in karst ground in deep water[J]. Bridge Construction, 2005(4): 59-61,68. (in Chinese)
LI C S. Construction techniques and detection analysis of bridge bored piles in karst ground in deep water[J]. Bridge Construction, 2005(4): 59-61,68. (in Chinese)
|
| [38] |
钟 杰, 周楚荣, 何 龙, 等. 岩溶地区超高层项目钻孔灌注桩施工技术及质量控制研究[J]. 建筑技术, 2023, 54(22): 2739-2741. (ZHONG J, ZHOU C R, HE L, et al. Research on construction technology and quality control of bored pile for super high-rise project in karst area[J]. Architecture Technology, 2023, 54(22): 2739-2741. (in Chinese)
ZHONG J, ZHOU C R, HE L, et al. Research on construction technology and quality control of bored pile for super high-rise project in karst area[J]. Architecture Technology, 2023, 54(22): 2739-2741. (in Chinese)
|
| [39] |
杜海龙, 贺茉莉, 罗小斌, 等. 岩溶地区某广场钻孔灌注桩基础补强加固设计与新技术[J]. 中国岩溶, 2019, 38(4): 600-606. (DU H L, HE M L, LUO X B, et al. A new technology of reinforcement by cast-in-place pile foundation in karst areas[J]. Carsologica Sinica, 2019, 38(4): 600-606. (in Chinese) doi: 10.11932/karst20190419
DU H L, HE M L, LUO X B, et al. A new technology of reinforcement by cast-in-place pile foundation in karst areas[J]. Carsologica Sinica, 2019, 38(4): 600-606. (in Chinese) doi: 10.11932/karst20190419
|
| [40] |
储 珺, 李国胜. 岩溶地区某33层住宅楼桩端基岩厚度不足问题分析及处理[J]. 建筑结构, 2019, 49(17): 136-141. (CHU J, LI G S. Analysis and treatment of insufficient pile-end bedrock thickness of a 33-storey residential building in karst area[J]. Building Structure, 2019, 49(17): 136-141. (in Chinese) doi: 10.19701/j.jzjg.2019.17.024
CHU J, LI G S. Analysis and treatment of insufficient pile-end bedrock thickness of a 33-storey residential building in karst area[J]. Building Structure, 2019, 49(17): 136-141. (in Chinese) doi: 10.19701/j.jzjg.2019.17.024
|
| [41] |
陈东波. 岩溶地区厚覆砂层桩基施工方案比选及实例分析[J]. 建筑结构, 2022, 52(17): 139-144. (CHEN D B. Comparison selection and case analysis on construction schemes of thick sand layer covered pile foundation in karst district[J]. Building Structure, 2022, 52(17): 139-144. (in Chinese)
CHEN D B. Comparison selection and case analysis on construction schemes of thick sand layer covered pile foundation in karst district[J]. Building Structure, 2022, 52(17): 139-144. (in Chinese)
|
| [42] |
郑杰元, 汪 勇, 卿伟宸. 成贵高铁玉京山隧道巨型溶洞顶板防护技术研究[J]. 隧道建设(中英文), 2021, 41(S2): 413-420. (ZHENG J Y, WANG Y, QING W C. Roof protection technology for giant karst cave in Yujingshan tunnel of Chengdu-Guiyang high-speed railway[J]. Tunnel Construction, 2021, 41(S2): 413-420. (in Chinese)
ZHENG J Y, WANG Y, QING W C. Roof protection technology for giant karst cave in Yujingshan tunnel of Chengdu-Guiyang high-speed railway[J]. Tunnel Construction, 2021, 41(S2): 413-420. (in Chinese)
|
| [43] |
梅国雄, 陆志宇, 陈家勋, 等. 岩溶地区新型灌注桩承载机理试验及模拟研究[J]. 湖南大学学报(自然科学版), 2022, 49(7): 32-44. (MEI G X, LU Z Y, CHEN J X, et al. Experiment and simulation research on bearing mechanism of a new type grouted pile in karst area[J]. Journal of Hunan University (Natural Sciences), 2022, 49(7): 32-44. (in Chinese) doi: 10.16339/j.cnki.hdxbzkb.2022069
MEI G X, LU Z Y, CHEN J X, et al. Experiment and simulation research on bearing mechanism of a new type grouted pile in karst area[J]. Journal of Hunan University (Natural Sciences), 2022, 49(7): 32-44. (in Chinese) doi: 10.16339/j.cnki.hdxbzkb.2022069
|
| [44] |
肖鸿斌, 金耀岷. 深埋串珠状溶洞的超高层基础设计案例分析[J]. 中国岩溶, 2023, 42(2): 382-390. (XIAO H B, JIN Y M. Case study on super high-rise foundation design of the deep-buried beaded karst cave[J]. Carsologica Sinica, 2023, 42(2): 382-390. (in Chinese)
XIAO H B, JIN Y M. Case study on super high-rise foundation design of the deep-buried beaded karst cave[J]. Carsologica Sinica, 2023, 42(2): 382-390. (in Chinese)
|
| [45] |
WANG P S, DING H Y, ZHANG P Y. Influence of karst caves at pile side on the bearing capacity of super‐long pile foundation[J]. Mathematical Problems in Engineering, 2020, 2020: 4895735.
|
| [46] |
GOTMAN N Z, EVDOKIMOV A G. Calculation of bridge-support pile foundations taking karst deformations into account in the base[J]. Soil Mechanics and Foundation Engineering, 2023, 60(5): 401-409. doi: 10.1007/s11204-023-09908-w
|
| [47] |
HAN G, ZHANG H, WANG Z R, et al. Bearing behavior of rock socketed pile in limestone stratum embedded with a karst cavity beneath pile tip[J]. Case Studies in Construction Materials, 2023, 18: e02203. doi: 10.1016/j.cscm.2023.e02203
|
| [48] |
CHEN H Y, FENG Z J, LI T, et al. Study on the vertical bearing performance of pile across cave and sensitivity of three parameters[J]. Scientific Reports, 2021, 11(1): 17342. doi: 10.1038/s41598-021-96883-7
|
| [49] |
SHENG M H, LU F Q, JIANG N, et al. Bearing behavior of pile foundation in karst region: physical model test and finite element analysis[J]. Applied Rheology, 2024, 34(1): 20230115. doi: 10.1515/arh-2023-0115
|
| [50] |
HUANG L J, GAO R, CHI J G, et al. Study on load-bearing behaviors of prestressed post-grouting tubular piles in the karst region of northern Fujian Province, China[J]. Frontiers in Earth Science, 2024, 12: 1387028. doi: 10.3389/feart.2024.1387028
|
| [51] |
ZHOU D Q, ZHU Q, PENG W Z, et al. Effect of newly built embankments on existing bridge piles passing through beaded karst caves[J]. International Journal of Geomechanics, 2024, 24(6): 04024111. doi: 10.1061/IJGNAI.GMENG-8123
|
| [52] |
PENG W Z, JIANG X J, ZHU Q, et al. Responses of karst-penetrating piles under active and passive loading: experimental and numerical investigation[J]. Transportation Geotechnics, 2025, 54: 101649. doi: 10.1016/j.trgeo.2025.101649
|
| [53] |
张慧乐, 张智浩, 王述红, 等. 岩溶区嵌岩桩的试验研究与分析[J]. 土木工程学报, 2013, 46(1): 92-103. (ZHANG H L, ZHANG Z H, WANG S H, et al. Experimental study and analysis on rock-socketed pile in karst area[J]. China Civil Engineering Journal, 2013, 46(1): 92-103. (in Chinese)
ZHANG H L, ZHANG Z H, WANG S H, et al. Experimental study and analysis on rock-socketed pile in karst area[J]. China Civil Engineering Journal, 2013, 46(1): 92-103. (in Chinese)
|
| [54] |
汪 婧. 基于上限分析原理的岩溶桩基破坏模式与极限承载力计算[J]. 铁道科学与工程学报, 2019, 16(9): 2207-2214. (WANG J. Failure mode and ultimate bearing capacity of karst pile foundation based on upper-bound theorem[J]. Journal of Railway Science and Engineering, 2019, 16(9): 2207-2214. (in Chinese) doi: 10.19713/j.cnki.43-1423/u.2019.09.011
WANG J. Failure mode and ultimate bearing capacity of karst pile foundation based on upper-bound theorem[J]. Journal of Railway Science and Engineering, 2019, 16(9): 2207-2214. (in Chinese) doi: 10.19713/j.cnki.43-1423/u.2019.09.011
|
| [55] |
艾 凯, 王 静. 岩溶地区桩基的有限元分析[J]. 岩土力学, 2003, 24(S1): 124-126. (AI K, WANG J. Study of piles foundation in karst area[J]. Rock and Soil Mechanics, 2003, 24(S1): 124-126. (in Chinese)
AI K, WANG J. Study of piles foundation in karst area[J]. Rock and Soil Mechanics, 2003, 24(S1): 124-126. (in Chinese)
|
| [56] |
董芸秀, 冯忠居, 郝宇萌, 等. 岩溶区桥梁桩基承载力试验与合理嵌岩深度[J]. 交通运输工程学报, 2018, 18(6): 27-36. (DONG Y X, FENG Z J, HAO Y M, et al. Experiment on bearing capacity of bridge pile foundations in karst areas and reasonable rock-socketed depth[J]. Journal of Traffic and Transportation Engineering, 2018, 18(6): 27-36. (in Chinese) doi: 10.3969/j.issn.1671-1637.2018.06.004
DONG Y X, FENG Z J, HAO Y M, et al. Experiment on bearing capacity of bridge pile foundations in karst areas and reasonable rock-socketed depth[J]. Journal of Traffic and Transportation Engineering, 2018, 18(6): 27-36. (in Chinese) doi: 10.3969/j.issn.1671-1637.2018.06.004
|
| [57] |
OU X D, SANG R H, BAI L, et al. Investigation on the post-grouting bearing capacity of bored piles in a highly weathered mudstone layer based on the O-cell test method[J]. Acta Geotechnica, 2025, 20(7): 3703-3723. doi: 10.1007/s11440-025-02584-0
|
| [58] |
Wan Z H, Dai G L, Gong W M. Field and theoretical analysis of response of axially loaded grouted drilled shafts in extra-thick fine sand[J]. Canadian Geotechnical Journal, 2020, 57(3): 391-407. doi: 10.1139/cgj-2018-0382
|
| [59] |
马永峰, 冉万云, 周丁恒, 等. 岩溶地区大型炼厂地基钻孔灌注桩处理的现场试验[J]. 土工基础, 2015, 29(5): 70-75. (MA Y F, RAN W Y, ZHOU D H, et al. In-situ tests of cast-in-place reinforced concrete piles for large oil refinery foundations in karst[J]. Soil Engineering and Foundation, 2015, 29(5): 70-75. (in Chinese)
MA Y F, RAN W Y, ZHOU D H, et al. In-situ tests of cast-in-place reinforced concrete piles for large oil refinery foundations in karst[J]. Soil Engineering and Foundation, 2015, 29(5): 70-75. (in Chinese)
|
| [60] |
王家全, 王宇帆, 苏小舟, 等. 岩溶区灌浆处理桩端缺陷及其质量判定方法研究[J]. 混凝土, 2013(4): 133-136. (WANG J Q, WANG Y F, SU X Z, et al. Based on the karst grouting treatment pile-end defects and quality decision method study[J]. Concrete, 2013(4): 133-136. (in Chinese)
WANG J Q, WANG Y F, SU X Z, et al. Based on the karst grouting treatment pile-end defects and quality decision method study[J]. Concrete, 2013(4): 133-136. (in Chinese)
|