FENG Baixi, ZHANG Haihang, ZHOU Kai, JIANG Yihui, XU Xinyang, LI Lang. Deformation control of a high-fill railway subgrade undercrossed by a three-span frame bridge[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2026, 40(5): 717-726. doi: 10.20265/j.cnki.issn.1007-2993.2025-0303
Citation: FENG Baixi, ZHANG Haihang, ZHOU Kai, JIANG Yihui, XU Xinyang, LI Lang. Deformation control of a high-fill railway subgrade undercrossed by a three-span frame bridge[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2026, 40(5): 717-726. doi: 10.20265/j.cnki.issn.1007-2993.2025-0303

Deformation control of a high-fill railway subgrade undercrossed by a three-span frame bridge

doi: 10.20265/j.cnki.issn.1007-2993.2025-0303
  • Received Date: 2025-07-11
  • Accepted Date: 2026-01-08
  • Rev Recd Date: 2025-09-27
  • Available Online: 2026-10-08
  • Publish Date: 2026-10-08
  • The construction of a box-frame culvert under an existing operational railway embankment may trigger deformation of the existing railway and compromise track smoothness, potentially resulting in operational disruptions in severe cases. This study takes the traffic diversion road beneath the Pingnan Railway at Wuhe Station in Shenzhen as the engineering background. A numerical model of a frame bridge underpassing an existing railway line was established. Based on field monitoring data, the disturbance-induced deformation of the overlying existing railway during cast-in-situ frame bridge construction was analyzed under different pile-cutting sequences. Key control techniques in cast-in-situ box-frame culvert underpass construction were then proposed. The calculation results show that, during the cast-in-situ underpass construction of the frame bridge, the track settlement curves under various construction conditions exhibit a generally symmetrical distribution. The minimum track settlement occurs at the supporting pile locations, whereas the maximum settlement appears at the mid-span of the D-beam. An increase in the span of the frame bridge leads to more pronounced horizontal displacement of the railway track within the bridge span. After optimization of the pile-cutting sequence, the track settlement within the area of the SGC10 supporting pile is significantly smaller than that obtained using the original scheme, with the settlement reduced by 49%. Consequently, both the settlement and horizontal displacement of the existing railway track within the entire underpass area are reduced. By cutting the existing supporting piles in stages, the railway track load can be progressively transferred to different frame bridges, enabling multiple stages of load redistribution. This staged load-transfer process can significantly reduce track settlement and improve the smoothness of the existing railway. The calculated deformation patterns of the railway track under different construction conditions are consistent with the field monitoring results, indicating that the proposed modeling approach can be used to predict track deformation during railway underpass construction at grade-separated crossings and provide practical construction experience for the safe implementation of similar railway underpass projects.

     

  • loading
  • [1]
    吴程程. 大跨度箱涵斜交下穿铁路轨道变形控制及安全施工技术研究[D]. 北京: 北京交通大学, 2023. (WU C C. Research on deformation control and safe construction technology of long-span box culvert diagonal crossing railway trac[D]. Beijing: Beijing Jiaotong University, 2023. (in Chinese)

    WU C C. Research on deformation control and safe construction technology of long-span box culvert diagonal crossing railway trac[D]. Beijing: Beijing Jiaotong University, 2023. (in Chinese)
    [2]
    赖艺鹏, 韩 语, 郭帅杰, 等. 框架桥下穿既有线有砟轨道结构动力响应分析[J]. 铁道科学与工程学报, 2025, 22(12): 5314-5327. (LAI Y P, HAN Y, GUO S J, et al. Analysis of the dynamic response of the existing line ballasted track structure under the frame bridge[J]. Journal of Railway Science and Engineering, 2025, 22(12): 5314-5327. (in Chinese) doi: 10.19713/j.cnki.43-1423/u.T20250287

    LAI Y P, HAN Y, GUO S J, et al. Analysis of the dynamic response of the existing line ballasted track structure under the frame bridge[J]. Journal of Railway Science and Engineering, 2025, 22(12): 5314-5327. (in Chinese) doi: 10.19713/j.cnki.43-1423/u.T20250287
    [3]
    王 鹏, 陈晓静. 复杂环境下铁路下穿立交施工关键技术研究[J]. 铁道工务, 2024, 2(6): 64-67. (WANG P, CHEN X J. Research on key construction technologies of railway underpass interchange in complex environment[J]. Railway Maintenance, 2024, 2(6): 64-67. (in Chinese)

    WANG P, CHEN X J. Research on key construction technologies of railway underpass interchange in complex environment[J]. Railway Maintenance, 2024, 2(6): 64-67. (in Chinese)
    [4]
    PECK R B. Deep excavation and tunneling in soft ground[C]//Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering. Mexico, 1969.
    [5]
    LOGANATHAN N, POULOS H G. Analytical prediction for tunneling-induced ground movements in clays[J]. Journal of Geotechnical and Geoenvironmental Engineering, 1998, 124(9): 846-856. doi: 10.1061/(ASCE)1090-0241(1998)124:9(846)
    [6]
    覃卫民, 楚 斌, 龙立志. 大断面箱涵下穿高速公路过程的施工监测分析[J]. 岩石力学与工程学报, 2009, 28(9): 1790-1797. (QIN W M, CHU B, LONG L Z. Analysis of construction monitoring of large-section box culvert jacking process underpass expressway[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(9): 1790-1797. (in Chinese) doi: 10.3321/j.issn:1000-6915.2009.09.008

    QIN W M, CHU B, LONG L Z. Analysis of construction monitoring of large-section box culvert jacking process underpass expressway[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(9): 1790-1797. (in Chinese) doi: 10.3321/j.issn:1000-6915.2009.09.008
    [7]
    林强强. 矩形顶管引起地面变形的实测分析与控制研究[D]. 上海: 同济大学, 2008. (LIN Q Q. Analysis and control of the surface deformation caused by rectangular pipe jacking construction[D]. Shanghai: Tongji University, 2008. (in Chinese)

    LIN Q Q. Analysis and control of the surface deformation caused by rectangular pipe jacking construction[D]. Shanghai: Tongji University, 2008. (in Chinese)
    [8]
    朱正国, 李兵兵, 李文江, 等. 新建铁路隧道下穿既有铁路施工引起的地表沉降控制标准研究[J]. 中国铁道科学, 2011, 32(5): 78-82. (ZHU Z G, LI B B, LI W J, et al. Study on ground surface settlement control standard induced by construction of new-built railway tunnel under-passing existing railway[J]. China Railway Science, 2011, 32(5): 78-82. (in Chinese)

    ZHU Z G, LI B B, LI W J, et al. Study on ground surface settlement control standard induced by construction of new-built railway tunnel under-passing existing railway[J]. China Railway Science, 2011, 32(5): 78-82. (in Chinese)
    [9]
    王道远, 袁金秀, 朱永全, 等. 铁路隧道下穿既有专线地表沉降控制基准研究[J]. 地下空间与工程学报, 2013, 9(S2): 1945-1950. (WANG D Y, YUAN J X, ZHU Y Q, et al. Study on surface settlement control criterion of railway tunnel crossing under the existing railway line[J]. Chinese Journal of Underground Space and Engineering, 2013, 9(S2): 1945-1950. (in Chinese) doi: 10.20174/j.juse.2013.s2.027

    WANG D Y, YUAN J X, ZHU Y Q, et al. Study on surface settlement control criterion of railway tunnel crossing under the existing railway line[J]. Chinese Journal of Underground Space and Engineering, 2013, 9(S2): 1945-1950. (in Chinese) doi: 10.20174/j.juse.2013.s2.027
    [10]
    张 超. 下穿铁路斜交框架桥受力分析[J]. 黑龙江交通科技, 2016, 39(11): 80-81. (ZHANG C. Mechanical analysis of skew frame bridge underpassing railway[J]. Communications Science and Technology Heilongjiang, 2016, 39(11): 80-81. (in Chinese)

    ZHANG C. Mechanical analysis of skew frame bridge underpassing railway[J]. Communications Science and Technology Heilongjiang, 2016, 39(11): 80-81. (in Chinese)
    [11]
    陈 力, 刁心宏, 杨守兴, 等. 框架桥下穿既有铁路路基沉降控制标准研究[J]. 现代隧道技术, 2019, 56(2): 111-118. (CHEN L, DIAO X H, YANG S X, et al. Research on subgrade settlement control criterion for a frame bridge passing underneath a existing railway[J]. Modern Tunnelling Technology, 2019, 56(2): 111-118. (in Chinese)

    CHEN L, DIAO X H, YANG S X, et al. Research on subgrade settlement control criterion for a frame bridge passing underneath a existing railway[J]. Modern Tunnelling Technology, 2019, 56(2): 111-118. (in Chinese)
    [12]
    岳仁辉, 马 野, 黄从俊, 等. 矩形箱涵下穿公路引起路面沉降控制基准研究[J]. 公路, 2023, 68(6): 204-209. (YUE R H, MA Y, HUANG C J, et al. Research on control benchmark for pavement settlement induced by rectangular box culvert underpassing highway[J]. Highway, 2023, 68(6): 204-209. (in Chinese)

    YUE R H, MA Y, HUANG C J, et al. Research on control benchmark for pavement settlement induced by rectangular box culvert underpassing highway[J]. Highway, 2023, 68(6): 204-209. (in Chinese)
    [13]
    石文阳. 下穿运营铁路大断面框构箱涵施工稳定性研究[D]. 西安: 西安建筑科技大学, 2021. (SHI W Y. Study on construction stability of large section box culvert under running railway[D]. Xi’an: Xi’an University of Architecture and Technology, 2021. (in Chinese)

    SHI W Y. Study on construction stability of large section box culvert under running railway[D]. Xi’an: Xi’an University of Architecture and Technology, 2021. (in Chinese)
    [14]
    尚培培. 双孔框构桥下穿重载铁路顶进施工条件下线路加固技术研究[J]. 铁道建筑, 2021, 61(4): 39-43. (SHANG P P. Study on railway reinforcement technology of double-span frame bridge undercrossing heavy haul railway during jacking construction[J]. Railway Engineering, 2021, 61(4): 39-43. (in Chinese)

    SHANG P P. Study on railway reinforcement technology of double-span frame bridge undercrossing heavy haul railway during jacking construction[J]. Railway Engineering, 2021, 61(4): 39-43. (in Chinese)
    [15]
    巨高权, 邱玉兴, 杨 毅. 下穿营业线重载铁路框构桥顶进及线路加固施工关键技术研究[J]. 建筑机械, 2025(4): 259-264. (JU G Q, QIU Y X, YANG Y. Research on key technologies for top entry and line reinforcement construction of heavy duty railway frame bridges underpassing business lines[J]. Construction Machinery, 2025(4): 259-264. (in Chinese)

    JU G Q, QIU Y X, YANG Y. Research on key technologies for top entry and line reinforcement construction of heavy duty railway frame bridges underpassing business lines[J]. Construction Machinery, 2025(4): 259-264. (in Chinese)
    [16]
    中国铁路总公司. 普速铁路线路修理规则[M]. 北京: 中国铁道出版社有限公司, 2019. (China Railway Corporation. Rules for maintenance of conventional speed railway lines[M]. Beijing: China Railway Publishing House Co., Ltd., 2019. (in Chinese)

    China Railway Corporation. Rules for maintenance of conventional speed railway lines[M]. Beijing: China Railway Publishing House Co., Ltd., 2019. (in Chinese)
    [17]
    中华人民共和国住房和城乡建设部. 城市轨道交通工程监测技术规范: GB 50911—2013[M]. 北京: 中国建筑工业出版社, 2014. (Ministry of Housing and Urban-Rural Development of the People’s Republic of China. Code for monitoring measurement of urban rail transit engineering: GB 50911—2013[M]. Beijing: China Architecture & Building Press, 2014. (in Chinese)

    Ministry of Housing and Urban-Rural Development of the People’s Republic of China. Code for monitoring measurement of urban rail transit engineering: GB 50911—2013[M]. Beijing: China Architecture & Building Press, 2014. (in Chinese)
    [18]
    朱 旻, 陈湘生, 张国涛, 等. 花岗岩残积土硬化土模型参数反演及工程应用[J]. 岩土力学, 2022, 43(4): 1061-1072. (ZHU M, CHEN X S, ZHANG G T, et al. Parameter back-analysis of hardening soil model for granite residual soil and its engineering applications[J]. Rock and Soil Mechanics, 2022, 43(4): 1061-1072. (in Chinese (in Chinese)

    ZHU M, CHEN X S, ZHANG G T, et al. Parameter back-analysis of hardening soil model for granite residual soil and its engineering applications[J]. Rock and Soil Mechanics, 2022, 43(4): 1061-1072. (in Chinese
    [19]
    国家铁路局. 铁路桥涵设计规范: TB 10002—2017[S]. 北京: 中国铁道出版社, 2017. (National Railway Administration. Code for design on railway bridge and culvert: TB 10002—2017[S]. Beijing: China Railway Press, 2017. (in Chinese)

    National Railway Administration. Code for design on railway bridge and culvert: TB 10002—2017[S]. Beijing: China Railway Press, 2017. (in Chinese)
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(17)  / Tables(4)

    Article Metrics

    Article views (26) PDF downloads(3) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return