Li Yushu, Li Tianbin, Wang Dong. Large Shaking Table Test for Portal Section of Huangcao Ping NO.2 Tunnel[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2009, 23(3): 109-114,118. doi: 10.3969/j.issn.1007-2993.2009.03.001
Citation: Li Yushu, Li Tianbin, Wang Dong. Large Shaking Table Test for Portal Section of Huangcao Ping NO.2 Tunnel[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2009, 23(3): 109-114,118. doi: 10.3969/j.issn.1007-2993.2009.03.001

Large Shaking Table Test for Portal Section of Huangcao Ping NO.2 Tunnel

doi: 10.3969/j.issn.1007-2993.2009.03.001
  • Received Date: 2009-03-12
  • The entry portal of NO. 2 Huangcao Ping Tunnel located on State Highway of NO. 318 is selected as the prototype to make large shaking table test. Firstly, the similarity relation, the moulding material, the mouldcase design, the test scheme and the load subsequence is introduced, and then the dynamic response of acceleration, earth pressure, displacement and strain occurred on the portal lining, the portal structure and the portal slope is systematically analyzed, and finally give the evaluation on seismic safety of the NO. 2 Huangcao Ping Tunnel.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (71) PDF downloads(5) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return