Discussion on Constructional Parameter and Technological Process of Twist Drill-Concrete Pump Piling of CFG Piles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2001, 15(2): 107-111.
Citation:
|
Discussion on Constructional Parameter and Technological Process of Twist Drill-Concrete Pump Piling of CFG Piles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2001, 15(2): 107-111.
|
Discussion on Constructional Parameter and Technological Process of Twist Drill-Concrete Pump Piling of CFG Piles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2001, 15(2): 107-111.
Citation:
|
Discussion on Constructional Parameter and Technological Process of Twist Drill-Concrete Pump Piling of CFG Piles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2001, 15(2): 107-111.
|
Discussion on Constructional Parameter and Technological Process of Twist Drill-Concrete Pump Piling of CFG Piles
- Received Date: 2000-12-25
Available Online:
2021-07-29