Volume 7 Issue 1
Apr.  2023
Turn off MathJax
Article Contents
Chen Heming. The Constructive Method of Guand Fence Pillar and the Istallation of Wave—shaped Bream for Expressway[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1993, (1): 26-29,58.
Citation: Chen Heming. The Constructive Method of Guand Fence Pillar and the Istallation of Wave—shaped Bream for Expressway[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1993, (1): 26-29,58.

The Constructive Method of Guand Fence Pillar and the Istallation of Wave—shaped Bream for Expressway

  • Available Online: 2023-04-18
  • The canstructive method of guard fence pielar and the installation of wave-shaped bream for expressway is introduced in this paper. Boring machme YD-1 is used to hit pillar. Its various function are compeletely brought into play, Such as lightly and flexibly opera-ting, Conveniantlg installing component with construction,quickly shrfting anol high work efficiency. It has the internal advanced constmctive level.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (34) PDF downloads(4) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return