This paper has developed a kind of computer aiding systerm which has been successfully used in the representive construction of No.2 subway named Center Garden in Shanghai.It can forecast and calculate the displacement,the subsidence,as well as the next repercussion of excavation.Through monitoring,the calculated results basically agree with the in situ test results.