Zhang Sumin. The Construction of Large Diameter Cast-in-place Pile in the Quaternary Perlob Cobble Strata by Using CZ-22 Drilling Machine[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1993, (2): 33-34.
	
		
			| Citation:
			
			 | 
													Zhang Sumin. The Construction of Large Diameter Cast-in-place Pile in the Quaternary Perlob Cobble Strata by Using CZ-22 Drilling Machine[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1993, (2): 33-34. 								
				
			 | 
		
	
 
	
		Zhang Sumin. The Construction of Large Diameter Cast-in-place Pile in the Quaternary Perlob Cobble Strata by Using CZ-22 Drilling Machine[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1993, (2): 33-34.
	
		
			| Citation:
			
			 | 
													Zhang Sumin. The Construction of Large Diameter Cast-in-place Pile in the Quaternary Perlob Cobble Strata by Using CZ-22 Drilling Machine[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1993, (2): 33-34. 								
				 | 
		
	
  
			
				
					
						
The Construction of Large Diameter Cast-in-place Pile in the Quaternary Perlob Cobble Strata by Using CZ-22 Drilling Machine
					
					
						
					
					
					
                        
		    		
						
							
							
							- Available Online:
					                    2023-04-18