Taking the engineering geological condition of the No.4 soft embankment test section of the Guangzhou-Zhuhai Quasi-High-speed Railway for example,Analgzing the factors affecting the consolidation results by using prefabricated drains,such as,the spacing between prefabricated drains,the depth of treatment,and the effects of well resistance and smear,etc.