Volume 22 Issue 5
Jul.  2021
Turn off MathJax
Article Contents
Li Weitao, Wang Minhua, Zhou Wei. Monitor Analysis About Super-deep Pit of Crossing-river Tunnel Working Well[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(5): 253-256.
Citation: Li Weitao, Wang Minhua, Zhou Wei. Monitor Analysis About Super-deep Pit of Crossing-river Tunnel Working Well[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(5): 253-256.

Monitor Analysis About Super-deep Pit of Crossing-river Tunnel Working Well

  • Received Date: 2008-07-15
    Available Online: 2021-07-07
  • Working well of Shanghai crossing-river tunnel is a super-deep pit engineering. The enclosed structure and deform of pit is different from ordinary pit. According to monitor data , performance of deep pit is analyzed. Meantime, some problems in the construction are explained,which can provide reference to the design and construction of similar case.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (46) PDF downloads(5) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return