Li Weitao, Wang Minhua, Zhou Wei. Monitor Analysis About Super-deep Pit of Crossing-river Tunnel Working Well[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(5): 253-256.
Citation:
Li Weitao, Wang Minhua, Zhou Wei. Monitor Analysis About Super-deep Pit of Crossing-river Tunnel Working Well[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(5): 253-256.
Li Weitao, Wang Minhua, Zhou Wei. Monitor Analysis About Super-deep Pit of Crossing-river Tunnel Working Well[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(5): 253-256.
Citation:
Li Weitao, Wang Minhua, Zhou Wei. Monitor Analysis About Super-deep Pit of Crossing-river Tunnel Working Well[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(5): 253-256.
Working well of Shanghai crossing-river tunnel is a super-deep pit engineering. The enclosed structure and deform of pit is different from ordinary pit. According to monitor data , performance of deep pit is analyzed. Meantime, some problems in the construction are explained,which can provide reference to the design and construction of similar case.