Yang Yongxia, Gao Qian. The Constructional Technics of Post-inserted the Steel Reinforcement Cage in Bored Pile and Associated Equipment[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2004, 18(6): 279-281.
	
		
			| Citation:
			
			 | 
													Yang Yongxia, Gao Qian. The Constructional Technics of Post-inserted the Steel Reinforcement Cage in Bored Pile and Associated Equipment[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2004, 18(6): 279-281. 								
				
			 | 
		
	
 
	
		Yang Yongxia, Gao Qian. The Constructional Technics of Post-inserted the Steel Reinforcement Cage in Bored Pile and Associated Equipment[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2004, 18(6): 279-281.
	
		
			| Citation:
			
			 | 
													Yang Yongxia, Gao Qian. The Constructional Technics of Post-inserted the Steel Reinforcement Cage in Bored Pile and Associated Equipment[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2004, 18(6): 279-281. 								
				 | 
		
	
  
			
				
					
						
The Constructional Technics of Post-inserted the Steel Reinforcement Cage in Bored Pile and Associated Equipment
					
					
						
					
					
					
                        
		    		
						
							
							
							- Received Date: 2004-08-10
									
								Available Online:
					                    2021-07-08