Based on the monitoring to the construction of the percussion boring filling pile for the main building of the power plant in Ji county, the engineering geological conditions of the site were understood through a little supplement investigation in the case that the report of the detailed investigation isn't correspond to the practice, The weathering degree of the rock is decided by debris from percussion boring. And the site is delimited to different are as in engineering geology.