[1] | Zheng Jinhuo. Analysis of Bearing Characteristic of Drilling Expanded Bottom Cast-in-situ Piles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2023, 37(1): 83-88. doi: 10.3969/j.issn.1007-2993.2023.01.015 |
[2] | Lin Zhiqiang. Mechanism of Rigid Pile Composite Foundation Influenced by Marine Soft Soil[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2019, 33(6): 328-333,371. doi: 10.3969/j.issn.1007-2993.2019.06.005 |
[3] | Shu Zhaoran, Cao Ruina, Liu Zhongchang. Accident Analysis and Reinforce Treatment for Drill Grouting Piles Foundation of Marine Mucky Soil Area[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2018, 32(5): 222-225. doi: 10.3969/j.issn.1007-2993.2018.05.002 |
[4] | DONG Jun-zhao, PENG Zhong. Automatic Monitoring of Large Caliber Sewage Duct Pipe Jacking Engineering Crossing Expressway[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2015, 29(4): 182-186. doi: 10.3969/j.issn.1007-2993.2015.04.005 |
[5] | Zhang Bafang. Analysis on Abnormal Construction Quality of Vibro-pile for Xiamen's Marine Soft Soil Foundation[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2014, 28(6): 320-323. doi: 10.3969/j.issn.1007-2993.2014.06.013 |
[6] | Xu Siyi, Peng Manhua, Zhang Haishun. Discussion on Related Problems of Large Diameter-Pile in Complex Rock Foundation Area[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2013, 27(3): 122-125. doi: 10.3969/j.issn.1007-2993.2013.03.004 |
[7] | Ma Jian, Feng Keming. Application of Large Diameter Tube Well Dewatering in Subway Construction[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2012, 26(4): 204-207. doi: 10.3969/j.issn.1007-2993.2012.04.011 |
[8] | Su Dongming, Lu Tianbao, Wang Jiansheng. The Discussion of Rock & Soil Parameter of Bored Pile[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2005, 19(4): 184-185,207. |
[9] | CENG Ding-bang, PENG Wen-xiang. The Construcion Technology of Bored Pile On-sea[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2005, 19(1): 53-55. |
[10] | LI Wei-ping. The Key Process Control in Bored Pile Construction[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2003, 17(5): 299-301. |
[11] | ZHANG Jian-ying, XING Xin-kui, YAO Ke-jian. An Engineering case of Large Diameter Bored Pile by Churning Drive[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2003, 17(3): 175-179. |
[12] | Experimental Research on Composite Foundation with Drilling Ram-expanded Piles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2001, 15(4): 226-230. |
[14] | Application Study of High Pressure Bored Pile[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1999, 13(3): 30-33. |
[15] | WU Ting. Calculating Method for Cantilever Retaining Drilled Hole Cast-in-pile[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1998, 12(3): 27-31. |
[19] | Zhang Sumin. The Classification for Building Site using the New and old Earthquake-proof Criterion[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1993, (2): 32-32,61. |