Citation: | Yang Chao, Yun Jun, Zhang Yingcai. The Visualization of Calculation of Uniform Steel in the Cast-in-place Pile with Round Cross-section[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2004, 18(6): 299-302. |
[1] | Zheng Jinhuo. Analysis of Bearing Characteristic of Drilling Expanded Bottom Cast-in-situ Piles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2023, 37(1): 83-88. doi: 10.3969/j.issn.1007-2993.2023.01.015 |
[2] | Zhang Qinxi, Guo Donglai, Shao Weixin, Chen Hao. New Prestressed Retaining Pile Structure System and Reinforcement Method[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2023, 37(2): 213-219. doi: 10.3969/j.issn.1007-2993.2023.02.014 |
[3] | Li Pengyuan, Zhang Guojun, Jiang Zongbin. Developing and Applying the Tunnel Monitoring Intelligence on Analysis Visualization System[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2013, 27(2): 69-73. doi: 10.3969/j.issn.1007-2993.2013.02.004 |
[4] | CHEN Lixin, SHU Bin, YANG Zongyao. Construction Method of Cast-in-place Pile Post Grouting[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2010, 24(1): 51-54. doi: 10.3969/j.issn.1007-2993.2010.01.014 |
[5] | Zhang Peng, Zhang Zaiming, Yang Yuyou. Transfer Control and Visualization of Geotechnical Engineering Investigation Data[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(2): 55-59,66. |
[6] | Yuan Jian, Huang Taihua. Direct Calculation Method for Cross-section Design of Retaining Wall[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2007, 21(2): 83-85. |
[7] | Su Dongming, Lu Tianbao, Wang Jiansheng. The Discussion of Rock & Soil Parameter of Bored Pile[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2005, 19(4): 184-185,207. |
[8] | CENG Ding-bang, PENG Wen-xiang. The Construcion Technology of Bored Pile On-sea[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2005, 19(1): 53-55. |
[9] | Tang Junfeng, Tang Xuemei, Hu Xiangzhao. Research on Static Loading Test for the Cast-in-place pile of Large Diameter[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2004, 18(6): 315-319. |
[10] | Tian Jinhua, Chi Xiuwen, Xia Yuanyou. Visual Terrain Model of Landslide[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2004, 18(3): 144-146,153. |
[11] | LI Wei-ping. The Key Process Control in Bored Pile Construction[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2003, 17(5): 299-301. |
[12] | ZHANG Jian-ying, XING Xin-kui, YAO Ke-jian. An Engineering case of Large Diameter Bored Pile by Churning Drive[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2003, 17(3): 175-179. |
[13] | Analysis and Experimental Study of Cast-in-place Piles Embedded Rock[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2002, 16(3): 180-184. |
[14] | Research on the calculating Method for Frictional Resistance of Cast-in-place Underwater Piles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2002, 16(6): 361-363,367. |
[15] | Calculation Example of Belled Pier Cast-in-place Piles of Hand Dugging[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2001, 15(1): 49-52. |
[16] | An Example of Composite Foundation With Driven Cast-in-place Piles,Deep Mixed-in-place Piles and Cushion[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1999, 13(2): 3-7. |
[17] | WU Ting. Calculating Method for Cantilever Retaining Drilled Hole Cast-in-pile[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1998, 12(3): 27-31. |