Citation: | Zhu Zhaorong, Wang Shengguo. Method of Achievements in Quality Control of Network RTK[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(6): 292-294. |
[1] | Meng Yongxu, Dong Yufan, Yin Fei, Chen Liang, Wang Yongming. Quality Control Index for Contact Clay in Core Wall Dam of Miaowei Hydropower Project[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2020, 34(6): 325-328. doi: 10.3969/j.issn.1007-2993.2020.06.004 |
[2] | Wang Shengguo, Zhu Zhaorong, Zhang Xiyue. Quality Analysis of Virtual Reference Station Observation Data Based on Beijing CORS System[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2018, 32(3): 120-124. doi: 10.3969/j.issn.1007-2993.2018.03.003 |
[3] | Jia Gao, Chang Jian, Ma Qiang. Analysis on All-digital Mapping Method in Multi-factor Measurements of Topographic Maps[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2015, 29(2): 69-72. doi: 10.3969/j.issn.1007-2993.2015.02.004 |
[4] | Ma Jian, Feng Keming. Application of Large Diameter Tube Well Dewatering in Subway Construction[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2012, 26(4): 204-207. doi: 10.3969/j.issn.1007-2993.2012.04.011 |
[5] | Qin Yue, Wu Jie. Displacement Monitoring Methods in Geotechnical Engineering and Accuracy Analysis[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2011, 25(6): 312-315. doi: 10.3969/j.issn.1007-2993.2011.06.010 |
[6] | Chen Jiang, Li Chaozheng, Li Wei. Compaction Degree Accessing Method Based on Three Points Compacted Method[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2011, 25(3): 109-112,132. doi: 10.3969/j.issn.1007-2993.2011.03.001 |
[7] | Duan Yufeng, Zhan Bo, Ceng Pengjiu. Technology of Cut off Wall Construction by Vibrating Grooving[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2009, 23(5): 263-267,271. doi: 10.3969/j.issn.1007-2993.2009.05.011 |
[8] | Wang Yanling. Construction Technology and Quality-control Methods of Cast-in-Situ Hollow Pipe Piles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(5): 260-262. |
[9] | Zhu Zhaorong, Wang Shengguo. Test and Precision Analysis of Beijing VRS[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2007, 21(5): 226-229,242. |
[10] | Analysis for the Quality Target and Quality Control of Impervious Earth of Xiao Langdi Dam[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2002, 16(6): 326-329,356. |
[11] | Analysis of Contolling Error and Measure Precision of Tape-extensometer[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2000, 14(4): 208-212. |
[12] | GONG Shi-liang. Jidui Method of Appraisal of Engineering Survey Precision[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1998, 12(4): 56-59. |