Citation: | Shen Changlu, Kong Qinghua, Gui Songli. New Progress of Geotechnique in Ningbo City[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1997, 11(1): 15-18. |
[1] | Zheng Jinhuo. Analysis of Bearing Characteristic of Drilling Expanded Bottom Cast-in-situ Piles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2023, 37(1): 83-88. doi: 10.3969/j.issn.1007-2993.2023.01.015 |
[2] | Xu Jianhua, Zhu Bin, Yang Dongyuan, Lu Bingxuan, Xu Letian. Analysis of A New Grouting Method for Pipe Implanted Pile[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2021, 35(6): 395-399. doi: 10.3969/j.issn.1007-2993.2021.06.009 |
[3] | Wei Renjie, Ma Jun. Application of Bored Cast-in-place Pile and SMW in Foundation Pit[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2014, 28(2): 92-95. doi: 10.3969/j.issn.1007-2993.2014.02.010 |
[4] | CHEN Lixin, SHU Bin, YANG Zongyao. Construction Method of Cast-in-place Pile Post Grouting[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2010, 24(1): 51-54. doi: 10.3969/j.issn.1007-2993.2010.01.014 |
[5] | Liang Jinguo. Computation Method of the Single Pile Bearing Capcity of Post-grouting Spinning Drill Pile[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(3): 139-144. |
[6] | Zhu Kui, Zhou Pengfei. Application of Grouting Technology at Pile Tip[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(1): 47-50. |
[7] | Zhao Peisheng, Yu Liang, Wang Wei. Grouting Treatment of Sedimentary Dregs of Cast-in-place Bored Pile Bottom[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2007, 21(4): 214-217. |
[8] | WU Shuai-bin, GAO Fei. Base-grouting Influence Upon the Vertical Bearing Capacity of Bored Piles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2006, 20(6): 320-323. |
[9] | LI Lian-ying, LIN Bo, SHAO Jian. Study on Vertical Bearing Capacity of Post-injecting Paste Bored Pile[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2005, 19(1): 24-27. |
[10] | Su Dongming, Lu Tianbao, Wang Jiansheng. The Discussion of Rock & Soil Parameter of Bored Pile[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2005, 19(4): 184-185,207. |
[11] | CENG Ding-bang, PENG Wen-xiang. The Construcion Technology of Bored Pile On-sea[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2005, 19(1): 53-55. |
[12] | LI Wei-ping. The Key Process Control in Bored Pile Construction[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2003, 17(5): 299-301. |
[13] | ZHANG Jian-ying, XING Xin-kui, YAO Ke-jian. An Engineering case of Large Diameter Bored Pile by Churning Drive[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2003, 17(3): 175-179. |
[14] | Pile Load Transfering Function and Its Initially Appliction in Churning Driven Cast-in-place Pile in Xi'an District[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2001, 15(1): 18-22. |
[15] | Experimental study on vertical bearing capacity of churning driven cast-in-place pile in Xian area[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1999, 13(4): 39-43. |
[16] | Grouting Technique after Pile Driving at Bottom Pile and Its Application[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1999, 13(3): 27-29. |