E-mail
RSS
All
Title
Author
Keyword
Advance Search
WeChat
Home
About Journal
Editoral Board
Journal Online
Online First
Current Issue
Archive
Top View
Top Down
Top Cited
Advance Search
For Authors
Submission Guidelines
Open Access Policy
Publishing Ethics
Subscription
Contact US
中文
All
Title
Author
Keyword
Abstract
DOI
Category
Address
Fund
Home
About Journal
Editoral Board
Journal Online
Online First
Current Issue
Archive
Top View
Top Down
Top Cited
Advance Search
For Authors
Submission Guidelines
Open Access Policy
Publishing Ethics
Subscription
Contact US
中文
PDF
Cite
Share
facebook
twitter
google
linkedin
All
Title
Author
Keyword
Abstract
DOI
Category
Address
Fund
Volume 8
Issue 1
Aug. 2021
Turn off MathJax
Article Contents
Abstract
References
Article Navigation
>
GEOTECHNICAL ENGINEERING TECHNIQUE
>
1994
>
8(1): 48-55,47
PDF
( 547 KB)
Available Online:
2021-08-03
Abstract
Abstract
The method to improve the solving velocity by using the program compiled by BASIC language and PC-1500 assembler language. It provides some references for work.
FullText(HTML)
References
(0)
References
Relative Articles
Relative Articles
[1]
Chen Xiaofeng, Sun Lichuan.
Optimization and Improvement of the Dynamic Parameter Test with Dynamic Machine Model Foundation at a Nuclear Power Plant
[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2024, 38(2): 149-155.
doi:
10.3969/j.issn.1007-2993.2024.02.005
[2]
Liang Jinguo, Ding Jihui, Liu Hongchao.
A Simple Settlement Calculation of Single Pile Based on Field Load Test
[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2016, 30(4): 212-217.
doi:
10.3969/j.issn.1007-2993.2016.04.012
[3]
Li Jianguang, Wang Duli.
Study of Piles Settlement Based on Static Test of Single Pile and Geddes Formula
[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2011, 25(5): 217-220,231.
doi:
10.3969/j.issn.1007-2993.2011.05.001
[4]
Zhang Qianqing, Zhang Zhongmiao.
Calculation Method of Pile Group Settlement Based on Single Pile Settlement
[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2009, 23(1): 1-4,22.
[5]
Han Kuifeng, Meng Feng.
Development of Earthwork Calculation Program With VB6.0 and Surfer Automation Technology
[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2007, 21(1): 7-10.
[6]
Improvement for the Calculating Method of Single Pile Erect Bearing Capacity
[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2002, 16(2): 67-69,94.
[7]
YANG Ji-bao.
Discussion on Load Transfer Method to Calculate Settlement of Individual Pile
[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1998, 12(4): 31-33.
[12]
The Calculative Model of Wave Velocity for the Seismic Wave Detecting and the Source Program of FORTRAN-77
[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1993, (4): 57-61.
[13]
Jia Wenhua, .
A Program of Extrapolating Calculation for the Settlement of the Quick Loading Test
[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1993, (4): 20-22,19.
Supplements
(0)
Cited By
Proportional views
Proportional views
Created with Highcharts 5.0.7
Amount of access
Chart context menu
Abstract Views, HTML Views, PDF Downloads Statistics
Abstract Views
HTML Views
PDF Downloads
2024-08
2024-09
2024-10
2024-11
2024-12
2025-01
2025-02
2025-03
2025-04
2025-05
2025-06
2025-07
0
2
4
6
8
Created with Highcharts 5.0.7
Chart context menu
Access Class Distribution
FULLTEXT
: 13.5 %
FULLTEXT
: 13.5 %
META
: 78.1 %
META
: 78.1 %
PDF
: 8.3 %
PDF
: 8.3 %
FULLTEXT
META
PDF
Created with Highcharts 5.0.7
Chart context menu
Access Area Distribution
其他
: 6.3 %
其他
: 6.3 %
上海
: 1.0 %
上海
: 1.0 %
乌鲁木齐
: 3.1 %
乌鲁木齐
: 3.1 %
北京
: 3.1 %
北京
: 3.1 %
张家口
: 2.1 %
张家口
: 2.1 %
普赖恩维尔
: 1.0 %
普赖恩维尔
: 1.0 %
沃思堡
: 1.0 %
沃思堡
: 1.0 %
济南
: 1.0 %
济南
: 1.0 %
芒廷维尤
: 41.7 %
芒廷维尤
: 41.7 %
苏州
: 1.0 %
苏州
: 1.0 %
西宁
: 36.5 %
西宁
: 36.5 %
西雅图
: 1.0 %
西雅图
: 1.0 %
青岛
: 1.0 %
青岛
: 1.0 %
其他
上海
乌鲁木齐
北京
张家口
普赖恩维尔
沃思堡
济南
芒廷维尤
苏州
西宁
西雅图
青岛
Catalog
通讯作者:
陈斌, bchen63@163.com
1.
沈阳化工大学材料科学与工程学院 沈阳 110142
本站搜索
百度学术搜索
万方数据库搜索
CNKI搜索
Get Citation
PDF
XML
Article Metrics
Article views (
74
)
PDF downloads(
8
)
Cited by(
)
Proportional views
Related
×
Close
Export File
Citation
Format
RIS(for EndNote,Reference Manager,ProCite)
BibTex
Txt
Content
Citation Only
Citation and Abstract
/
DownLoad:
Full-Size Img
PowerPoint
Return
Return