2000, 14(3): 134-138,146.
Abstract:
A Practical engineering of enforcement of mountain slope excavation by prestressed strand is introduced,which records the whole project procedure from design to construction.The slope remains firm,complete and well covered by the vegetation since the construction was completed five years ago.The practice proves to be a successful experience.