2012 Vol. 26, No. 5

Geotechnical Monitoring Technology
Application of the Monitoring and Measuring Technologies in Constructing the Henglong Mountain Tunnel
Xiao Yuchun
2012, 26(5): 217-221. doi: 10.3969/j.issn.1007-2993.2012.05.001
Abstract:
The Henglong mountain tunnel of Fulong Expressway was constructed by New Austrian Tunneling Method(NATM). This article not only introduced the monitoring and measuring technology of construction on displacement of surrounding rock and the change of stress by mouth of a horn part of the super large section in the Henglong mountain tunnel, but also introduced the timely adjustment of supporting system design parameters such as tunnel prestressed rock bolt according to the monitoring and measurement analysis of treatment results in this project. Results showed that careful monitoring and analysis of the construction work play a key role not only in ensuring the tunnel construction safety and the economic and reasonable supporting, but also in obtaining reliable design parameters.
The Establishment of the Deformation Monitoring Forecast System on the Expressway Through Goaf Based the Hyperbolic Model
Kang Jinming, Jing Zhaoji
2012, 26(5): 222-225. doi: 10.3969/j.issn.1007-2993.2012.05.002
Abstract:
Through the deformation monitoring of the mined-out area highway subgrade subsidence,established the embankment settlement database. and based on the survey datas, The author established the deformation forecast model of surface subsidence, research and developed the subgrade deformation monitoring forecast system, analysed the settlement remaining of highway subgrade deformation and created the settlement prewarning report.
Application of Gross Error in the Dock Cofferdam Construction Safety Monitoring
Zhou Yuan, Peng Manhua, An Xiaorui
2012, 26(5): 226-229,255. doi: 10.3969/j.issn.1007-2993.2012.05.003
Abstract:
The monitoring data of dock cofferdam is very important in the construction of dock. However, some incorrect factors led to the monitoring data does not match the actual situation. while the abnormal value can not be intuitive removed, thus it has a great impact on dock cofferdam construction safety monitoring, So it must be judged and handled. This article introduced 3σ, Grubbs and Dixon methods to handle the Gross Error, and applied them to the concrete dock cofferdam construction safety monitoring. The results showed that these methods which provide help to the dock cofferdam construction. They can quickly, easily and effectively handle the abnormal value in some degree.
Technology Probe and Research
Dynamic Compaction Ground Rreatment Study on Vibration Effects
Wu Xingye, Xu Mingming, Wu Qiong
2012, 26(5): 230-233,251. doi: 10.3969/j.issn.1007-2993.2012.05.004
Abstract:
The method of dynamic compaction is one of important methods for ground treatment, the dynamic compaction to evaluation of dynamic compaction vibration effect, the basis of the evaluation are dynamic. This article takes the Changping District ridge village site as an example, through the landfill site for dynamic compaction vibration monitoring, analysd the dynamic compaction vibration amplitude and attenuation law of frequency, and the four polynomial representation field medium attenuation index. In field medium action spectra and dynamic excitation spectra based on, obtained by calculating the dielectric function and dynamic excitation function. Through the continuous accumulation of dynamic compaction vibration data, set up different properties of rock and soil and ground medium function relationship, then clearly engineering rock soil physical and mechanical properties and the dynamic performance between constitutive relation.
The Understanding About Foundation Settlement of Existing Buildings Caused by Foundation Pit Dewatering in Jinan
Fan Huchuan, Yu Feng
2012, 26(5): 234-237. doi: 10.3969/j.issn.1007-2993.2012.05.005
Abstract:
Combined with engineering experience,make a summary to influencing factors about foundation settlement of existing buildings caused by foundation pit dewatering.Aimed at the problem that compressibility in additional stress segment can not be accurately taken in estimating foundation settlement caused by foundation pit dewatering by layer-wise method, propose the method based on formation stress history to estimate foundation settlement caused by foundation pit dewatering,while combining with engineering example,make a prediction for composite foundation settlement caused by foundation pit dewatering.
Groundwater Recharge of Pit Dewatering Close to the Metro
Ju Chengsong, Xu Dan
2012, 26(5): 238-241. doi: 10.3969/j.issn.1007-2993.2012.05.006
Abstract:
During the foundation pit dewatering process, groundwater recharge is taken as the pit water level reduced in pit in order to protect the safety of the environment to ensure that the water level drop smaller within a certain area outside the pit.The grand international financial center is located at the junction of three subway, environmental protection is higher.Groundwater recharge technology combined with dewatering can control dewatering sphere of influence, by the numerical method to calculate and analysis of the recharge, and successfully applied in practical engineering.
The Variable Rigidity for Balance Settlement Design of Pile Foundation and the Application in Project
Le Yuan, Yu Wei, Wang Dong
2012, 26(5): 242-246,258. doi: 10.3969/j.issn.1007-2993.2012.05.007
Abstract:
By the contrast of the old and the new technical code for building pile foundations,the principles of variable rigidity design is presented to solve high-rise building problems induced by variational elevation uneven loading distributing and short of bearing stratum in site.Based on variable rigidity, the optimum design method for balance settlement is proposed for promoting settlement uniformity.It is proved that the proposed idea can reduce the differences in settlement and raft the internal forces, optimize the pile program, cost savings, access to economic benefits in the actual high-rise building designs.
Analysis of Formation Mechanism and Prevention Measures of Lijiawuji Collapse
Yi Zhenhua
2012, 26(5): 247-251. doi: 10.3969/j.issn.1007-2993.2012.05.008
Abstract:
Collapse on the steep slope is one of the frequent geological hazards in southwest region,which is mostly controlled by the combination of joints and structural surfaces in rock mass. Based on the investigation of the engineering geological conditions of Lijiawuji collapse area,This article described the deformation characteristics of dangerous rock mass,and analyzed its formation mechanism and failure mode,then the stability of dangerous rock mass was evaluated, and finally the Treatment is given prevention measures as well.
Study on Lateral Unlaoding of Tianjin Soft Dredger Soil by True Triaxial Text
Wang Tulong, Li Zuoliang, Gao Xuemi
2012, 26(5): 252-255. doi: 10.3969/j.issn.1007-2993.2012.05.009
Abstract:
In order to conduct the research on deformation properties of unloading of pit excavation,a series of true triaxial tests were performed in tianjin soft dredger fills under the condition of unconsolidated-undrained with rigid-flexible composite true triaxial apparatus, it keeps that major principle stress fixed and intermediate principal strain ε2≈0 and minor principle stress decreased. The results indicated that tangent compression modulus increases with increasing of compression stress, stress-strain relation ε1 and ε3 is linearity, poisson ratio is not match with classical soil mechanics theory,μ31>0.5 and increases with increasing of compression stress, pore water pressure increases at first then decreases.
The Discussion of Dispersing Pressure of Prestressed Anchor Cable Tensioning Test and Stress Loss
Zuo Xiaowei, Zhou Feng
2012, 26(5): 256-258. doi: 10.3969/j.issn.1007-2993.2012.05.010
Abstract:
As site monitoring the tension of dispersing pressure prestressed anchor cable of a solpe enginneering.This article introduced the reinforcement mechanism of dispersing pressure prestressed anchor. Further monitor and analyse the stress loss and the anchor elongation.
The Carrying Capacity Analysis of Kunming New Airport Terminal Area Underlying Cave Foundation
Deng Jiewen, Peng Dalei, Liu Hong
2012, 26(5): 259-262,271. doi: 10.3969/j.issn.1007-2993.2012.05.011
Abstract:
There are many factors that affect bearing capacity of Cave foundation, such as Cave depth, the caves diameter (span), spacing vertically adjacent caves and caverns section form the foundation bearing capacity. The way, combined engineering geology analysis with numerical simulation, was applied to analyze the underlying bearing capacity of Cave foundation. According to this way, it concludes that the relationship between the diameter of the upper load and the lower part of the dissolution is smaller when a single cave depth is greater than 2 times, and the impaction of the cave to the top load can be ignored when the spacing of the level of the adjacent cave is greater than one times and the vertical distance is greater than 0.5 times of the span. Besides, the upper part of the maximum load qmax decrease about 6% to 10% from each additional 5% of dissolution rate. When the span is greater than three times of the hole high, the decrease range of the maximum load on the top of foundation is relatively small; on the contrary, the load that vertical type caves can withstand is relatively large.
The Distribution Characteristics and Research on the Alluvial Soil in Changzhou
Xia Yunjuan, Wei Tingzhong
2012, 26(5): 263-266. doi: 10.3969/j.issn.1007-2993.2012.05.012
Abstract:
The alluvial soil is widely distributed in the main city of Changzhou, whose existence will not be conducive to engineering construction. Understanding and grasping the causes and distribution of the alluvial soil could provide guidance of sing the appropriate means of investigation and reasonable layout survey workload to determine the safe and economical and reasonable foundation plan in geological exploration.
The Application of the Bracing Engineering for Timeliness Effect of Swelling Rock on Deep Foundation
Xu Jianhua, Zhu Zhen, Feng Jianghong
2012, 26(5): 267-271. doi: 10.3969/j.issn.1007-2993.2012.05.013
Abstract:
Research of the projecting feature depending on swelling rock physical and mechanical characteristics and the engineering characteristics. The characteristics bracing engineering of deep foundation pit combined with substructure. Look for relations of decay period and safe period, the timeliness effect was put forward by their relational, For this to made economic effect design methodology. A Case Study of Nanning, which was testified further by the timeliness effect of bracing engineering of deep foundation pit on swelling rock.