Volume 36 Issue 3
Jun.  2022
Turn off MathJax
Article Contents
Sun Changqing. Analysis and Countermeasures of Key and Difficult Points in the Investigation of a Super Large Diameter Shield Project[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2022, 36(3): 230-237. doi: 10.3969/j.issn.1007-2993.2022.03.011
Citation: Sun Changqing. Analysis and Countermeasures of Key and Difficult Points in the Investigation of a Super Large Diameter Shield Project[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2022, 36(3): 230-237. doi: 10.3969/j.issn.1007-2993.2022.03.011

Analysis and Countermeasures of Key and Difficult Points in the Investigation of a Super Large Diameter Shield Project

doi: 10.3969/j.issn.1007-2993.2022.03.011
  • Received Date: 2021-10-18
    Available Online: 2022-06-02
  • Publish Date: 2022-06-08
  • With the continuous development of urban municipal construction to ultra deep underground space, super large diameter tunnel construction technology is gradually adopted. At present, the technology of super large diameter shield tunnel is developing in the direction of large depth, large section and long distance. Due to the large cross-section size, large fluctuation of buried depth, complex engineering geological and hydrogeological conditions, complex geotechnical engineering problems will be encountered. Based on the reconstruction tunnel project of Beijing East Sixth Ring Road, the characteristics of the large-diameter shield project, such as high survey level, complex engineering geology and hydrogeology, and great difficulty in ultra deep foundation pit support and groundwater control were summarized. Standard penetration in situ test and indoor physical and mechanical tests such as particle analysis, static lateral pressure coefficient and subgrade bed coefficient have been carried out. A special hydrogeological survey such as layered observation of groundwater level, pore water pressure test of cohesive soil layer, pumping test and water injection test was carried out to provide hydrogeological parameters. All these provided a basis for the selection of super large diameter shield machine, cutter head and cutter configuration, the matching of various construction parameters in the process of super large shield tunneling, the support design of shield shaft and the design of groundwater control scheme. It also provides reference for similar projects.

     

  • loading
  • [1]
    王 平. 中国超大直径盾构法隧道市场发展形势分析[J]. 建筑科技,2020,4(1):42-46. doi: 10.3969/j.issn.1007-046X.2020.01.014
    [2]
    傅德明, 周文波. 超大直径盾构隧道工程技术的发展[C]// 第五届中国国际隧道工程研讨会论文集. 上海市土木工程学会, 2011.
    [3]
    肖明清. 国内大直径盾构隧道的设计技术进展[J]. 铁道标准设计,2008,(8):84-87. doi: 10.3969/j.issn.1004-2954.2008.08.028
    [4]
    杨方勤,段创峰,吴华柒,等. 上海长江隧道抗浮模型试验与理论研究[J]. 地下空间与工程学报,2010,(3):454-459.
    [5]
    余暄平,沈永东,凌宇峰,等. 上海长江隧道工程盾构施工技术[J]. 上海建设科技,2007,(8):47-50.
    [6]
    万凯军,李大毛,赵建海. 武汉长江隧道岩土工程勘察难点及措施[J]. 资源环境与工程,2014,28(5):663-665. doi: 10.3969/j.issn.1671-1211.2014.05.012
    [7]
    熊清林,莫衍超. 复杂条件下超大直径城市盾构隧道勘察关键技术探讨—以春风隧道为例[J]. 工程建设与设计,2019,(16):90-91.
    [8]
    索晓明,张继清,杨毅秋. 北京地下直径线大直径盾构隧道技术研究[J]. 中国工程科学,2010,12(12):11-17. doi: 10.3969/j.issn.1009-1742.2010.12.002
    [9]
    刘洪洲. 超大直径盾构机的选型问题[J]. 公路隧道,2006,(1):9-13.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(7)  / Tables(13)

    Article Metrics

    Article views (128) PDF downloads(36) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return