HU Zheng-dong. Slope Stabilization Schemes for high position Pool at Water Factory of Long Gang Centre in Shen Zhen[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1998, 12(2): 15-17.
	
		
			| Citation:
			
			 | 
													HU Zheng-dong. Slope Stabilization Schemes for high position Pool at Water Factory of Long Gang Centre in Shen Zhen[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1998, 12(2): 15-17. 								
				
			 | 
		
	
 
	
		HU Zheng-dong. Slope Stabilization Schemes for high position Pool at Water Factory of Long Gang Centre in Shen Zhen[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1998, 12(2): 15-17.
	
		
			| Citation:
			
			 | 
													HU Zheng-dong. Slope Stabilization Schemes for high position Pool at Water Factory of Long Gang Centre in Shen Zhen[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1998, 12(2): 15-17. 								
				 | 
		
	
  
			
				
					
						
Slope Stabilization Schemes for high position Pool at Water Factory of Long Gang Centre in Shen Zhen
					
					
						
					
					
					
                        
		    		
						
							
							
							- Received Date: 1997-06-20
									
								Available Online:
					                    2021-07-07