Citation: | Liu Huaqiang, Huang Jingzhong. Vertical Uplift Capacity of Horizontal Anchor Plates[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2007, 21(1): 25-27. |
[1] | Zhu Yu, Gong Huaishi, Luo Yehua, Yan Xiaozhou, Zeng Ziyue, Li Hongbin, Zeng Yong. Reinforcement effect of support trolley in ultra-small clearance stacking line section of shield tunnel[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2025, 39(1): 113-121. doi: 10.20265/j.cnki.issn.1007-2993.2023-0918 |
[2] | Liu Jun, Shen Jing, Zhang Jianquan, Song Ye, Liu Peng. Study on the Pullout Resistance of Hollow GFRP Reinforced Soil Nails[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2024, 38(1): 78-84. doi: 10.3969/j.issn.1007-2993.2024.01.014 |
[3] | Zhao Heng, Li Mingjun. Defects and Proposals of Soil Microstructure Tests[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2020, 34(1): 1-6,17. doi: 10.3969/j.issn.1007-2993.2020.01.001 |
[4] | Li Xinyuan. Engineering Characteristics of Jiu Wei Ling Fault and Its Influence on Shenzhen Metro Line 5[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2019, 33(3): 125-129. doi: 10.3969/j.issn.1007-2993.2019.03.001 |
[5] | Jiang Bo. Measures and Engineering Project Cases of the Tunnel Karst Treatment in the Fuxiu Second Line of the Yuhuai Railway[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2019, 33(5): 299-302. doi: 10.3969/j.issn.1007-2993.2019.05.011 |
[6] | HUANG Zhong-hui, TANG Ying-chun, YANG Lei. Research on Nanning No.1 Subway Geotechnical Engineering Investigation in Swelling Rock[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2015, 29(1): 1-4,13. doi: 10.3969/j.issn.1007-2993.2015.05.001 |
[7] | Kang Tao, Zhang Xiaoyu. A Formula Method to Determine Ratio of Ultimate Shaft Capability in Tension and Compression[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2014, 28(2): 70-72. doi: 10.3969/j.issn.1007-2993.2014.02.004 |
[8] | Yao Jin, Hua Lijuan. Line of the Foundation Pit Optimization Design and Simulation of Deformation[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2012, 26(3): 132-136. doi: 10.3969/j.issn.1007-2993.2012.03.006 |
[9] | WANG Derong, LI Wenpei, ZHOU Bin. Risk Management for Construction of Chating Station Foundation Pit of Nanjing Metro Line Two[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2010, 24(2): 101-104,109. doi: 10.3969/j.issn.1007-2993.2010.02.012 |
[10] | Zhang Wu, Gao Wensheng. Post Grouting Technology of Tensile Pile and Its Application[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(1): 31-35. |
[11] | Li Sen, Tang Mengxiong. Study on Anti-draw Bearing Properties of Rock-socketed Pile[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(2): 84-87. |
[12] | Liang Shijun. Fuzzy Isoline of Site Classification Based on Known Datum of Drill Holes[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2008, 22(4): 182-185. |
[13] | Yan Yonglong. Application Research on Ecology Friendly Retaining Wall in National Highway No.319 at Haicang,Xiamen[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2005, 19(4): 215-217. |
[14] | Xu Rundong, Xu Linsheng. Linear Elastic Analysis of Stress in Surrounding Rock of Double Tunnles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2005, 19(3): 127-129. |
[15] | WANG Feng-jiang, ZHANG Zuo-wei. Deposit Characteristic and Shear Strength of Tailing Sand[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2003, 17(4): 209-212. |
[16] | WANG Rui-yong, LI Jian-guang. Study on the Ratio of Pile's Stress and Soil's Stress in Composite Foundation of CFG Piles Utilizing Slip Line Field Theory[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2003, 17(6): 368-371. |
[17] | HE Xing-yang, CHEN Yi-min, ZHANG Wen-sheng. Composition,Structure and Stabilization of Soil[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2003, 17(3): 129-133. |
[18] | LI Lin-shan. Shot-anchoring Protection and Soil-nailing Wall[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 1998, 12(3): 24-26. |