The karst development features in the Huayingshan Tunnel is discussed. The vertical zonation of Karst development intensity is divided through being combined with the history of karst development, according to the dividing basises and the dividing criterion of karst development intensity with the analogical evaluation method, the main factor evaluation method and the comprehensive evaluation method. And the prediction is consistent with actual situations.